High River Announces Updated Reserve and Resource Estimate and Current Technical Reports for Irokinda and Zun-Holba

TORONTO, ONTARIO -- (Marketwire) -- 04/16/12 -- High River Gold Mines Ltd. ("High River" or the "Company") (TSX: HRG) announced that it has filed on SEDAR a technical report on the Irokinda project, entitled "Technical Report on the Irokinda Project, Republic of Buryatia, Russian Federation" dated April 5, 2012, and a technical report on the Zun-Holba project, entitled "Technical Report on the Zun-Holba Project, Republic of Buryatia, Russian Federation" dated April 5, 2012 (collectively, the "Technical Reports"), which were prepared by Ricardo Valls, P. Geo.

The Technical Reports audit and convert the results of the exploration work of High River for both projects into Canadian Institute of Mining, Metallurgy and Petroleum compliant mineral resources and mineral reserves. The Technical Reports are compliant with National Instrument 43-101 - Standards of Disclosure for Mineral Projects ("NI 43-101").

Highlights

The updated reserves and resources estimates as of January 1, 2012 for:

--  The Irokinda mine
    --  322,704 tonnes of ore with 9.2 g/t gold grade resulting in 2,967 kg
        of proven and probable gold reserves
    --  200,220 tonnes of ore with 15.6 g/t gold grade resulting in 3,118.2
        kg of measured and indicated gold resources
    --  332,918 tonnes of ore with 13.3 g/t gold grade resulting in 4,440.5
        kg of inferred gold resources
--  The Zun-Holba mine
    --  260,610 tonnes of ore with 9.4 g/t gold grade resulting in 2,454 kg
        of proven and probable gold reserves
    --  212,428 tonnes of ore with 12.1 g/t gold grade resulting in 2,580 kg
        of measured and indicated gold resources
    --  538,812 tonnes of ore with 10.6 g/t gold grade resulting in 6,161 kg
        of inferred gold resources

Mineral Resource/Reserve Estimates

Mineral resources and reserves have been estimated and classified according to the CIM Standards on Mineral Resources and Reserves - Definitions and Guidelines (December 2005) (the "CIM Guidelines").

Irokinda

A summary of the current mineral reserve and resource estimates for the Irokinda mine are shown in the tables below.

----------------------------------------------------------------------------
                 Mineral Reserve Estimate (January 1, 2012)
----------------------------------------------------------------------------
                                                Tonnes     Au g/t     Au, kg
----------------------------------------------------------------------------
Proven                                         187,787        9.1      1,709
----------------------------------------------------------------------------
Probable                                       134,917        9.3    1,257.7
----------------------------------------------------------------------------
Proven + Probable                              322,704        9.2      2,967
----------------------------------------------------------------------------

----------------------------------------------------------------------------
                 Mineral Resource Estimate (January 1, 2012)
----------------------------------------------------------------------------
                                                Tonnes     Au g/t     Au, kg
----------------------------------------------------------------------------
Measured                                       110,356       16.3    1,798.5
----------------------------------------------------------------------------
Indicated                                       89,864       14.7    1,319.7
----------------------------------------------------------------------------
Inferred                                       332,918       13.3    4,440.5
----------------------------------------------------------------------------
Measured + Indicated                           200,220       15.6    3,118.2
----------------------------------------------------------------------------

The 2011 exploration-mining parameters currently in use are:

1.  Cut-off grade of 3 g/t gold to outline the boundaries of the mineralized
    zones.
2.  Minimum gold grade of 6.8 g/t over a mineralized zone composite
    intercept.
3.  Minimum mining thickness of 1 m. When thickness is less than 1 m, but
    the gold grade is higher, it is recommended to use the metrogram (3 and
    6.8 g/t).
4.  Maximum length of 12 m for waste rock and low grade mineralization being
    included in the "reserve" estimation.
5.  Uneconomic "reserves" cut-off is 1 g/t, minimum thickness 1 m.
6.  Minimum silver grade taken into account 3 g/t.

Zun-Holba

A summary of the current mineral reserve and resource estimates for the Zun-Holba mine are shown in the tables below.

----------------------------------------------------------------------------
                 Mineral Reserve Estimate (January 1, 2012)
----------------------------------------------------------------------------
                                                Tonnes     Au g/t     Au, kg
----------------------------------------------------------------------------
Proven                                          38,528       11.7        453
----------------------------------------------------------------------------
Probable                                       222,082        9.0      2,001
----------------------------------------------------------------------------
Proven + Probable                              260,610        9.4      2,454
----------------------------------------------------------------------------

----------------------------------------------------------------------------
                 Mineral Resource Estimate (January 1, 2012)
----------------------------------------------------------------------------
                                                Tonnes     Au g/t     Au, kg
----------------------------------------------------------------------------
Measured                                        30,072       15.9        478
----------------------------------------------------------------------------
Indicated                                      182,356       11.5      2,102
----------------------------------------------------------------------------
Inferred                                       538,812       10.6      6,161
----------------------------------------------------------------------------
Measured + Indicated                           212,428       12.1      2,580
----------------------------------------------------------------------------

The 2011 exploration-mining parameters currently in use are:

1.  Cut-off grade of 3 g/t gold to outline the boundaries of the mineralized
    zones.
2.  Minimum gold grade of 7 g/t over a mineralized zone composite intercept.
3.  Minimum mining thickness of 1 m. When thickness is less, but the gold
    grade is higher, it is recommended to use the metrogram.
4.  Minimum gold grade in a mineable block of 15.5 g/t gold.
5.  Minimum gold grade of 11.9 g/t gold in a block being mined with workings
    targeted to reach a mineable block.
6.  Maximum thickness of 3 m for waste rock and low grade mineralization
    being included in the "reserve" estimation.
7.  Uneconomic "reserves" are considered to be blocks with gold grade less
    than 15.5 g/t or 11.9 g/t but higher than 7 g/t. In the Russian
    terminology any uneconomic "reserves" are considered to be "off balance
    reserves" while economic "reserves" are considered to be "balance
    reserves."
8.  Estimate silver "reserves" within the outlines of the gold "reserves."

Data Verification

Ricardo Valls is a "qualified person" as defined by 43-101 and, as a qualified person, completed the verification of data on which the above mineral reserve and resource estimates were based. This verification included reviewing randomly selected blocks of Russian classified "reserves" and reviewing the parameters by which they were converted to "operational reserves." Discussions with mining personnel were also held on the appropriate category in which to place the individual blocks according to the CIM classification system.

Depending on the geological boundaries, mineralization is sampled by core samples of varying length to a maximum of one metre at Irokinda and Zun-Holba. All host rocks without sulphide mineralization are photographed in the core boxes and sampled by geochemical (chip) samples up to 5 m in length.

The data verification programs undertaken on the data collected from the Irokinda and Zun-Holba mines adequately support the geological interpretations and the analytical and database quality, and therefore support the use of the data in mineral resource and mineral reserve estimation.

Internal check assays are performed to find random errors in the analytical work at the on-site laboratories at both Irokinda and Zun-Holba. The external check assays for the gold grades are performed using the fire assay method at the laboratories located in the cities of Irkutsk (IRGIREDMET, which has ISO 9000 and ISO 14000 certificates valid until 2014) and Ulan-Ude (Republic Analytical Centre). These laboratories contracted by High River for sample analyses do not have any relationship to, or interest in, High River or any of its projects.

Qualified Person

Ricardo A. Valls, P. Geo, consultant from Valls Geoconsultant, is a "qualified person" as such term is defined in NI 43-101 and was responsible for supervising the preparation of the Technical Reports and has reviewed and approved the scientific and technical information included in this press release. Mr. Valls is independent of High River.

Cautionary Note

The grades presented in the above tables are not meant to imply recoverable gold. Mineral resources and reserves have been estimated and classified according to the CIM Guidelines. High River is not aware of any known environmental, permitting, legal, title, taxation, socio-economic, marketing or other relevant issues that could potentially affect the estimate of mineral resources or reserves. The mineral resources and reserves may be affected by subsequent assessments of mining, environmental, processing, permitting, taxation, socio-economic and other factors.

About High River

High River is an unhedged gold company with interests in producing mines, development and advanced exploration projects in Russia and Burkina Faso. Two underground mines, Zun-Holba and Irokinda, are situated in the Lake Baikal region of Russia. Two open pit gold mines, Berezitovy in Russia and Taparko-Bouroum in Burkina Faso, are also in production. Finally, High River has a 90% interest in a development project, the Bissa gold project in Burkina Faso, and a 50% interest in an advanced exploration project with NI 43-101 compliant resource estimates, the Prognoz silver project in Russia.

FORWARD LOOKING INFORMATION

This release contains forward-looking statements. Wherever possible, words such as "intends", "expects", "scheduled", "estimates", "anticipates", "believes", and similar expressions or statements that certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved, have been used to identify these forward-looking statements. Although the forward-looking statements contained in this release reflect management's current beliefs based upon information currently available to management and based upon what management believes to be reasonable assumptions, High River cannot be certain that actual results will be consistent with these forward-looking statements. A number of factors could cause events and achievements to differ materially from the results expressed or implied in the forward-looking statements. These factors should be considered carefully and prospective investors should not place undue reliance on the forward-looking statements. Forward-looking statements necessarily involve significant known and unknown risks, assumptions and uncertainties that may cause High River's actual results, events, prospects and opportunities to differ materially from those expressed or implied by such forward-looking statements. Although High River has attempted to identify important risks and factors that could cause actual actions, events or results to differ materially from those described in forward-looking statements, there may be other factors and risks that cause actions, events or results not to be anticipated, estimated or intended, including those risk factors discussed in the Company's 2011 Annual Information Form. There can be no assurance that the forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, prospective investors should not place undue reliance on forward-looking statements. Any forward-looking statements are made as of the date of this release, and High River assumes no obligation to update or revise them to reflect new events or circumstances, unless otherwise required by law.

Contacts:
High River Gold Mines Ltd.
Yury Lopukhin
CFO
011 7 495 981 0910 ext. 6821
info@hrg.ca
www.hrg.ca

© 2012 Marketwired
Software vor dem Comeback – diese 5 Aktien könnten durchstarten!
Während Halbleiter- und KI-Infrastrukturwerte von einem Hoch zum nächsten jagen, wurden viele Software-Aktien in den vergangenen Monaten regelrecht aus den Depots gedrängt. Die Angst vor Disruption hat Investoren zu einem radikalen Strategiewechsel veranlasst – mit der Folge, dass zahlreiche Qualitätsunternehmen heute auf Mehrjahrestiefs notieren.

Doch genau hier entsteht eine seltene Chance. Denn während die Bewertungen im Halbleitersektor inzwischen auf ambitionierten Niveaus liegen, ist der Bewertungsabschlag bei Software-Titeln so hoch wie seit Jahren nicht mehr. Gleichzeitig liefern viele Unternehmen weiterhin starke Wachstumszahlen und integrieren KI erfolgreich in ihre Geschäftsmodelle. Die Diskrepanz zwischen Kursentwicklung und operativer Stärke könnte sich schon bald auflösen.

Für Anleger bedeutet das: antizyklisch denken und gezielt zugreifen, bevor der Markt dreht. Denn erste technische Signale deuten darauf hin, dass sich die Trendwende bereits anbahnt.

In unserem aktuellen Spezialreport stellen wir fünf Software-Aktien vor, die besonders aussichtsreich positioniert sind – mit starker Marktstellung, attraktiver Bewertung und hohem Aufholpotenzial.

Jetzt den kostenlosen Report sichern – bevor der Software-Rebound Fahrt aufnimmt!
Werbehinweise: Die Billigung des Basisprospekts durch die BaFin ist nicht als ihre Befürwortung der angebotenen Wertpapiere zu verstehen. Wir empfehlen Interessenten und potenziellen Anlegern den Basisprospekt und die Endgültigen Bedingungen zu lesen, bevor sie eine Anlageentscheidung treffen, um sich möglichst umfassend zu informieren, insbesondere über die potenziellen Risiken und Chancen des Wertpapiers. Sie sind im Begriff, ein Produkt zu erwerben, das nicht einfach ist und schwer zu verstehen sein kann.