Anzeige
Mehr »
Dienstag, 09.06.2026 - Börsentäglich über 12.000 News
Pentagon in Alarmbereitschaft? Dieser Rohstoff könnte jetzt Gold in den Schatten stellen
Anzeige

Indizes

Kurs

%
News
24 h / 7 T
Aufrufe
7 Tage

Aktien

Kurs

%
News
24 h / 7 T
Aufrufe
7 Tage

Xetra-Orderbuch

Fonds

Kurs

%

Devisen

Kurs

%

Rohstoffe

Kurs

%

Themen

Kurs

%

Erweiterte Suche
Marketwired
140 Leser
Artikel bewerten:
(0)

Riverstone Resources Intersects 1.43 g/t Gold Over 40 m at Goulagou I

VANCOUVER, BRITISH COLUMBIA -- (Marketwire) -- 08/03/12 -- Riverstone Resources Inc. (TSX VENTURE: RVS)(OTCQX: RVREF)(FRANKFURT: 3RV) ("Riverstone" or the "Company") is pleased to report results from 51 reverse circulation ("RC") drill holes on the 90% owned Goulagou I ("GGI") deposit, which forms part of the Company's flagship Karma Gold Project in Burkina Faso, West Africa (the "Karma Project"). These holes are part of the overall program to extend the GGI deposit along strike and to depth for inclusion in the upcoming resource estimate on the Karma Project, which is scheduled to be available in September 2012 (See Map on the Riverstone Website for the location of the holes: http://www.riverstoneresources.com/i/maps/120802-100504_GGI_Plan-b.jpg).

Significant assay intervals in these drill holes include:

--  1.43 g/t Au over 40 m in 12-RC-339
--  1.21 g/t Au over 20 m including 3.48 g/t over 4 m in 11-RC-321
--  4.53 g/t Au over 4 m in 11-RC-328
--  1.08 g/t Au over 14 m in 11-RC-330
--  2.32 g/t Au over 2 m and 4.21 g/t Au over 2 m in 12-RC-236

Mineralization at GGI now extends over 2,200 metres east-west and locally at least 200 metres down-dip. Drilling at GGI is generally testing shallow targets, to about 100 to 150 metres vertical depth and also deeper drilling that test higher-grade shoots that remain open to depth and along strike.

"The results of this drilling will be included in the upcoming resource estimate scheduled for September 2012," commented Dwayne L. Melrose, President and CEO of Riverstone. "The Preliminary Economic Assessment for the Karma Project that is currently being conducted is progressing on schedule and is expected to be released in August 2012."

A more complete summary of significant results in these drill holes is presented in the following table:

---------------------------------------------------------------------------
Hole number                 Interval (metres)      Intercept        Average
---------------------------------------------------------------------------
                          From             To       (metres) Grade (g/t Au)
---------------------------------------------------------------------------

---------------------------------------------------------------------------
GLG-11-RC-290              174            184             10           0.94
---------------------------------------------------------------------------

---------------------------------------------------------------------------
GLG-11-RC-291              144            148              4           0.79
---------------------------------------------------------------------------

---------------------------------------------------------------------------
GLG-11-RC-292               46             48              2           1.71
---------------------------------------------------------------------------

---------------------------------------------------------------------------
GLG-11-RC-294                4              6              2           1.91
---------------------------------------------------------------------------

---------------------------------------------------------------------------
GLG-11-RC-300               26             34              8           0.87
---------------------------------------------------------------------------

---------------------------------------------------------------------------
GLG-11-RC-310              100            108              8           0.63
---------------------------------------------------------------------------

---------------------------------------------------------------------------
GLG-11-RC-314               92             94              2           1.13
---------------------------------------------------------------------------

---------------------------------------------------------------------------
GLG-11-RC-317              120            138             18           0.58
---------------------------------------------------------------------------

---------------------------------------------------------------------------
GLG-11-RC-320               56             66             10           0.56
---------------------------------------------------------------------------
and                         90             92              2           1.45
---------------------------------------------------------------------------

---------------------------------------------------------------------------
GLG-11-RC-321               50             70             20           1.21
---------------------------------------------------------------------------
including                   62             66              4           3.48
---------------------------------------------------------------------------

---------------------------------------------------------------------------
GLG-11-RC-323              104            130             26           0.73
---------------------------------------------------------------------------
and                        130            150             20           0.65
---------------------------------------------------------------------------

---------------------------------------------------------------------------
GLG-11-RC-327              134            142              8           1.09
---------------------------------------------------------------------------

---------------------------------------------------------------------------
GLG-11-RC-328              108            112              4           4.53
---------------------------------------------------------------------------

---------------------------------------------------------------------------
GLG-11-RC-329              136            152             16           0.91
---------------------------------------------------------------------------

---------------------------------------------------------------------------
GLG-11-RC-330               70             78              8           0.50
---------------------------------------------------------------------------
and                         78             92             14           1.08
---------------------------------------------------------------------------

---------------------------------------------------------------------------
GLG-11-RC-331              104            120             16           0.76
---------------------------------------------------------------------------
and                        138            146              8           0.67
---------------------------------------------------------------------------

---------------------------------------------------------------------------
GLG-11-RC-335              158            164              6           0.69
---------------------------------------------------------------------------

---------------------------------------------------------------------------
GLG-11-RC-336               18             28             10           0.58
---------------------------------------------------------------------------
and                         50             52              2           2.32
---------------------------------------------------------------------------
and                        136            138              2           4.21
---------------------------------------------------------------------------

---------------------------------------------------------------------------
GLG-11-RC-338               78            110             32           0.70
---------------------------------------------------------------------------

---------------------------------------------------------------------------
GLG-11-RC-339               20             60             40           1.43
---------------------------------------------------------------------------

---------------------------------------------------------------------------
GLG-11-RC-340              138            142              4           0.98
---------------------------------------------------------------------------

---------------------------------------------------------------------------
GLG-11-RC-341              180            184              4           0.80
---------------------------------------------------------------------------

---------------------------------------------------------------------------

Notes: Interpreted true thicknesses for these intercepts are between 60 and
       70 percent.
       Holes 293, 295-299, 301-309, 311-313, 315, 316, 318, 319, 322, 324,
       325, 332-334 and 337 returned no significant intersections.

The 90% owned GGI deposit is part of the Company's Karma Project which comprises a NI 43-101 compliant in-pit Whittle indicated resource of 1.6 million ounces of gold in 47.3 million tonnes grading 1.1 g/t gold and an inferred resource of 0.6 million ounces of gold in 18.9 million tonnes grading 0.93 g/t gold (see news release dated January 9, 2012 and NI 43-101 Technical Report titled "Technical Report and Resource Estimate on the Karma Project, Burkina Faso, West Africa" filed on SEDAR (www.sedar.com) February 23, 2012). Since the cut-off date for the January 9th, 2012 resource estimation, the Company has completed an additional +85,000 metres of drilling on the Karma Project. It is expected that the results of this drilling will add to the overall resources of the Karma Project deposits.

Riverstone maintains a quality control program involving the use of repeat assays, inserted blanks and the use of certified standards from an accredited Canadian laboratory. All samples were prepared at the independent Abilab Burkina SARL laboratory in Ouagadougou, Burkina Faso, West Africa (part of the ALS Chemex Group), and assayed using standard fire assay with an atomic absorption finish, with samples grading over one gram per tonne gold re-assayed with a gravimetric finish, either in Burkina Faso or at the ALS Chemex facility in North Vancouver, British Columbia, Canada.

Riverstone is active in Burkina Faso, West Africa, where it holds a portfolio of four high quality exploration projects covering in excess of 2,000 square kilometres. Addition information about the Company and its activities may be found on the Company's website at www.riverstoneresources.com and under the Company's profile at www.sedar.com.

ON BEHALF OF THE BOARD

Dwayne L. Melrose, President & CEO

Giles R. Peatfield, Ph. D., P.Eng. is the Qualified Person for RVS and has reviewed and approved the contents of this release.

Certain statements made and information contained in this news release and elsewhere constitutes "forward-looking information" within the meaning of Canadian securities legislation. Forward-looking statements are based on certain assumptions and are subject to risks and uncertainties which could cause actual events or results to differ from those reflected in the forward-looking statements, including, without limitation, with respect to statements regarding the updated resources estimate, the assumptions set forth in this news release and in the Company's news release of January 9, 2012, and risks and uncertainties relating to the interpretation of drill results and the estimation of mineral resources, the geology, grade and continuity of mineral deposits, the possibility that future exploration, development results will not be consistent with the Company's expectations, accidents, equipment breakdowns, risk of undiscovered, title defects and surface access, labour disputes, the potential for delays in exploration activities, the potential for unexpected costs and expenses, commodity price fluctuations, currency fluctuations, and other risks and uncertainties, including those described under Risk Factors in each management discussion and analysis and in the Company's annual information form which are available under the Company's profile at www.sedar.com. Forward-looking information is based on various assumptions including, without limitation, the expectations and beliefs of management, the assumed long term price of gold, that the Company will receive required permits and access to surface rights, that the Company can access financing, appropriate equipment and sufficient labour and that the political environment within Burkina Faso will continue to support the development of environmentally safe mining projects. Should one or more of these risks and uncertainties materialize, or should underlying assumptions prove incorrect, actual results may vary materially from those described in forward-looking statements. Accordingly, readers are advised not to place undue reliance on forward-looking statements.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Contacts:
Riverstone Resources Inc. - Vancouver Office
Dwayne L. Melrose
604-801-5020

Riverstone Resources Inc.
Don Mosher
Corporate Development
604-685-6465

Riverstone Resources Inc.
Raju Wani
Investor Relations
403-240-0555

Riverstone Resources Inc.
Ron Cooper
Investor Relations
604-986-0112
info@riverstoneresources.com
www.riverstoneresources.com

© 2012 Marketwired
Software vor dem Comeback – diese 5 Aktien könnten durchstarten!
Während Halbleiter- und KI-Infrastrukturwerte von einem Hoch zum nächsten jagen, wurden viele Software-Aktien in den vergangenen Monaten regelrecht aus den Depots gedrängt. Die Angst vor Disruption hat Investoren zu einem radikalen Strategiewechsel veranlasst – mit der Folge, dass zahlreiche Qualitätsunternehmen heute auf Mehrjahrestiefs notieren.

Doch genau hier entsteht eine seltene Chance. Denn während die Bewertungen im Halbleitersektor inzwischen auf ambitionierten Niveaus liegen, ist der Bewertungsabschlag bei Software-Titeln so hoch wie seit Jahren nicht mehr. Gleichzeitig liefern viele Unternehmen weiterhin starke Wachstumszahlen und integrieren KI erfolgreich in ihre Geschäftsmodelle. Die Diskrepanz zwischen Kursentwicklung und operativer Stärke könnte sich schon bald auflösen.

Für Anleger bedeutet das: antizyklisch denken und gezielt zugreifen, bevor der Markt dreht. Denn erste technische Signale deuten darauf hin, dass sich die Trendwende bereits anbahnt.

In unserem aktuellen Spezialreport stellen wir fünf Software-Aktien vor, die besonders aussichtsreich positioniert sind – mit starker Marktstellung, attraktiver Bewertung und hohem Aufholpotenzial.

Jetzt den kostenlosen Report sichern – bevor der Software-Rebound Fahrt aufnimmt!
Werbehinweise: Die Billigung des Basisprospekts durch die BaFin ist nicht als ihre Befürwortung der angebotenen Wertpapiere zu verstehen. Wir empfehlen Interessenten und potenziellen Anlegern den Basisprospekt und die Endgültigen Bedingungen zu lesen, bevor sie eine Anlageentscheidung treffen, um sich möglichst umfassend zu informieren, insbesondere über die potenziellen Risiken und Chancen des Wertpapiers. Sie sind im Begriff, ein Produkt zu erwerben, das nicht einfach ist und schwer zu verstehen sein kann.