Anzeige
Mehr »
Login
Donnerstag, 25.04.2024 Börsentäglich über 12.000 News von 687 internationalen Medien
Solarboom 2024: Fünf Gründe, die für diese Aktie sprechen!
Anzeige

Indizes

Kurs

%
News
24 h / 7 T
Aufrufe
7 Tage

Aktien

Kurs

%
News
24 h / 7 T
Aufrufe
7 Tage

Xetra-Orderbuch

Fonds

Kurs

%

Devisen

Kurs

%

Rohstoffe

Kurs

%

Themen

Kurs

%

Erweiterte Suche
ACCESSWIRE
1.108 Leser
Artikel bewerten:
(2)

PPX Mining Corp: PPX Mines 8,469 Tonnes Grading 8.68 gpt Au at Mina Callanquitas During Q1 2020

VANCOUVER, BC / ACCESSWIRE / July 27, 2020 / PPX Mining Corp. (the "Company" or "PPX") (TSXV:PPX)(BVL:PPX)(SSE:PPX) is pleased to announce that over 8,469 tonnes of ore grading 8.68 gpt gold were mined and processed during calendar Q1 (January - March) 2020 at Mina Callanquitas. The production rate during January and February 2020 averaged approximately 117 tonnes/day. Production in March was sharply curtailed in response to the COVID-19 pandemic. In addition, 656 metres of lateral mine development and exploration were also completed during the quarter. Highlights of mining results for calendar Q1 2020 are given below:

  • The Company's mining partner Proyectos La Patagonia S.A.C. ("PLP") provided the Company with a detailed report on operations at Mina Callanquitas for calendar Q1 2020. PLP reports that 8,469 tonnes of gold mineralized ore were shipped to the Malin Plant of Silver Cascas S.A.C. ("Silver Cascas"). The average gold grade of the ore was 8.68 gpt gold. Gold recoveries from processing the mineralized rock at the Silver Cascas plant ranged from 75% to 87%, averaging 81%, consistent with gold recoveries observed previously. A total of 1,920 ounces of gold were recovered by Silver Cascas during the period. To date, PPX has mined over 100,000 tonnes from the Measured and Indicated Resource at Mina Callanquitas which includes a portion of the project's Mineral Reserves as defined in the Igor Pre-Feasibility Study (available on the Company's website or SEDAR). PLP utilizes the proceeds from the sale of the mineralized material to advance underground development at Mina Callanquitas in order to facilitate the future expansion of the mining rate to 350 tonnes/day.

Brian J. Maher, President and CEO of PPX Mining Corp commented: "PPX is pleased with the increased mining rate that PLP achieved during January and February of 2020. This validates the ability of PLP to increase mining rates in response to increases in available third-party processing capacity. PLP has resumed operations at Mina Callanquitas following an extended shut-down due to the COVID-19 pandemic (please see PPX press release dated July 21, 2020). PPX looks forward to the resumption of ore shipments for processing during the second half of 2020, however, the safe return to mine production for employees and the nearby communities is paramount."

Coronavirus/COVID-19 Information:

Currently, all PPX and Sienna Minerals S.A.C. employees are working from home in accordance with their individual government recommendations and mandates. This status will continue for the foreseeable future, again under the guidance of respective local authorities.

About PPX Mining Corp:

PPX Mining Corp. (TSX.V: PPX.V, SSE: PPX, BVL: PPX) is a Canadian-based mining company with assets in northern Peru. Igor, the Company's 100%-owned flagship gold and silver project, is located in the prolific Northern Peru gold belt in eastern La Libertad Department. PPX is developing the Callanquitas Mine and heap leach facility to exploit high grade, underground-minable oxidized gold and silver ore. Based on the Company's Pre-Feasibility Study ("PFS"), PPX expects the Callanquitas Mine to produce up to 26,000 AuEq* ounces per year over a seven-year mine life at cash cost of less than US$610/AuEq* ounce (the Igor PFS is available on the Company's website and SEDAR). Simultaneously, PPX is accelerating its exploration program at Igor in order to fully evaluate the resource potential of the entire Igor project area. The Callanquitas structure is open along strike and at depth, parallel structures are unexplored. New discoveries at Portachuelos, coupled with the Domo and Tesoros exploration targets, emphasize that the Igor Project is evolving into a district-scale project with multiple deposits and mineralized zones.

*AuEq is calculated as follows: AuEq ounces = Au ounces + Ag ounces/75. Per PFS, inclusive of metallurgical recovery.

All scientific and technical information in this press release has been reviewed and approved by Quentin J. Browne, P.Geo., Independent Consulting Geologist to PPX Mining Corp., who is a qualified person under the definitions established by National Instrument 43-101.

On behalf of the Board of Directors
Brian J. Maher
President and Chief Executive Officer

FOR FURTHER INFORMATION, PLEASE CONTACT:
PPX Mining Corp.
Brian J. Maher, President and Chief Executive Officer

Phone: 1-530-913-4728
Email: brian.maher@ppxmining.com
Website: www.ppxmining.com

Cautionary Statement:

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. Certain disclosure in this release, June constitute "forward-looking statements" within the meaning of the United States Private Securities Litigation Reform Act of 1995 and Canadian securities legislation. In making the forward-looking statements in this release, the Company has applied certain factors and assumptions that the Company believes are reasonable. However, the forward-looking statements in this release are subject to numerous risks, uncertainties and other factors that June cause future results to differ materially from those expressed or implied in such forward-looking statements. Such uncertainties and risks are detailed from time to time in the Company's filings with the appropriate securities commissions, and June include, among others, market conditions, and delays in obtaining or failure to obtain required regulatory approvals or financing. There can be no assurance that such statements will prove to be accurate, and actual results and future events could differ materially from those anticipated in such statements. Readers are cautioned not to place undue reliance on forward-looking statements. The Company does not intend, and expressly disclaims any intention or obligation to, update or revise any forward-looking statements whether as a result of new information, future events or otherwise, except as required by law.

SOURCE: PPX Mining Corp.



View source version on accesswire.com:
https://www.accesswire.com/599051/PPX-Mines-8469-Tonnes-Grading-868-gpt-Au-at-Mina-Callanquitas-During-Q1-2020

Großer Insider-Report 2024 von Dr. Dennis Riedl
Wenn Insider handeln, sollten Sie aufmerksam werden. In diesem kostenlosen Report erfahren Sie, welche Aktien Sie im Moment im Blick behalten und von welchen Sie lieber die Finger lassen sollten.
Hier klicken
© 2020 ACCESSWIRE
Werbehinweise: Die Billigung des Basisprospekts durch die BaFin ist nicht als ihre Befürwortung der angebotenen Wertpapiere zu verstehen. Wir empfehlen Interessenten und potenziellen Anlegern den Basisprospekt und die Endgültigen Bedingungen zu lesen, bevor sie eine Anlageentscheidung treffen, um sich möglichst umfassend zu informieren, insbesondere über die potenziellen Risiken und Chancen des Wertpapiers. Sie sind im Begriff, ein Produkt zu erwerben, das nicht einfach ist und schwer zu verstehen sein kann.