Anzeige
Mehr »
Montag, 24.08.2026 - Börsentäglich über 12.000 News
Trommelwirbel! NurExone - jetzt wird es wirklich groß!
Anzeige

Indizes

Kurs

%
News
24 h / 7 T
Aufrufe
7 Tage

Aktien

Kurs

%
News
24 h / 7 T
Aufrufe
7 Tage

Xetra-Orderbuch

Fonds

Kurs

%

Devisen

Kurs

%

Rohstoffe

Kurs

%

Themen

Kurs

%

Erweiterte Suche
ACCESS Newswire
208 Leser
Artikel bewerten:
(1)

WorkMax Releases Article on Fixing Construction Cost Code Errors at the Field Level

PAYSON, UT / ACCESS Newswire / August 24, 2026 / WorkMax, a construction time tracking solution and part of the Foundation Software product portfolio, released an article on how construction crews can improve cost code accuracy by capturing labor data directly in the field.

Miscoded labor hours are a common source of reconciliation headaches in construction accounting - and the damage rarely stays contained to a single timesheet. Once an error reaches payroll and job costing, it ripples through every report a business relies on to track project profitability.

That's the problem WorkMax's newest article sets out to solve. "Cost Code Tracking for Construction Crews in the Field" examines why cost code accuracy breaks down once labor hours are logged after the fact and makes the case for a different approach: capturing cost code data as work happens, rather than reconstructing it at the end of a shift.

To make that case, the article walks contractors through:

  • How cost codes organize labor, materials and equipment into distinct budget lines for reliable job costing

  • Why after-the-fact, manual cost code entry leads to blank codes, misassigned hours and lumped-together time

  • How mobile time tracking narrows the gap between when work happens and when it's recorded

  • What real-time cost code data makes possible for project managers watching budget performance

  • How WorkMax builds cost code tracking into the daily field workflow rather than an end-of-shift correction

The full piece offers a clearer picture of why cost code accuracy starts in the field, not the back-office. To learn more, read the full article here.

WorkMax
WorkMax is a leader in mobile resource management for construction. A best-in-class time-tracking solution, WorkMax utilizes cutting-edge features like geofencing and facial recognition to maximize accuracy and eliminate buddy punching. For more information, visit www.workmax.com.

Foundation Software, LLC
Foundation Software delivers job cost accounting, estimating and takeoff, project management, safety management, HR management, mobile field apps and payroll services to help contractors run the business side of construction. For information, call (800) 246-0800, visit www.foundationsoft.com or email info@foundationsoft.com.

Media Contacts

Tracie Kuczkowski | VP of Marketing
tak@foundationsoft.com (800) 246-0800 x 7933

Samantha Ann Illius | Marketing Relations Coordinator and Influence Specialist
SIllius@foundationsoft.com (800) 811-5926 x 4823

SOURCE: WorkMax



View the original press release on ACCESS Newswire:
https://www.accessnewswire.com/newsroom/en/computers-technology-and-internet/workmaxr-releases-article-on-fixing-construction-cost-code-errors-1210072

© 2026 ACCESS Newswire
Achtung, Korrektur!
Die Börsen laufen heiß. Trotz geopolitischer Krisen und steigender Zinsen klettern viele Indizes weiter Richtung Allzeithoch. Doch unter der Oberfläche zeigen sich erste Risse: Der Abverkauf bei Halbleiter-, KI- und Space-Aktien macht deutlich, wie schnell sich die Stimmung drehen kann.

Besonders gefährlich ist die aktuelle Gemengelage aus schwacher Saisonalität, dünner Liquidität in den Sommermonaten und historisch hohen Bewertungen. Selbst vermeintlich sichere Blue Chips sind inzwischen teuer bewertet und damit anfällig für Korrekturen. Gleichzeitig liefern technische Indikatoren erste Warnsignale. So werden viele Rekordstände nicht mehr bestätigt.

Für Anleger steigen die Risiken spürbar. Wer jetzt nicht genauer hinschaut, läuft Gefahr, auf dem falschen Fuß erwischt zu werden.

In unserem aktuellen Spezialreport zeigen wir fünf Aktien, bei denen die Abwärtsrisiken besonders hoch sind – und wo sich Gewinnmitnahmen oder sogar Short-Strategien anbieten könnten.

Jetzt den kostenlosen Report sichern – bevor die Korrektur Fahrt aufnimmt!
Werbehinweise: Die Billigung des Basisprospekts durch die BaFin ist nicht als ihre Befürwortung der angebotenen Wertpapiere zu verstehen. Wir empfehlen Interessenten und potenziellen Anlegern den Basisprospekt und die Endgültigen Bedingungen zu lesen, bevor sie eine Anlageentscheidung treffen, um sich möglichst umfassend zu informieren, insbesondere über die potenziellen Risiken und Chancen des Wertpapiers. Sie sind im Begriff, ein Produkt zu erwerben, das nicht einfach ist und schwer zu verstehen sein kann.