From ESS News Advanced materials company Lava Blue has commissioned a 250 kW/1.45 MWh sodium-sulphur (NAS) battery energy storage system at its Centre for Predictive Research into Specialty Materials (PRiSM) facility in Brisbane's southeast, marking the first time the technology has been connected to the National Electricity Market (NEM). The battery, manufactured by Japan's NGK, has been integrated with 200 kW of existing solar generation at the site and plugged into Energex's local distribution grid. Lava Blue said the solar and battery system can supply up to 100% of PRiSM's peak operating ...Den vollständigen Artikel lesen ...
© 2026 pv magazine
