Anzeige
Mehr »
Login
Dienstag, 30.04.2024 Börsentäglich über 12.000 News von 686 internationalen Medien
Uran Boom: Die Bullen starten durch - spektakuläre Kursgewinne möglich
Anzeige

Indizes

Kurs

%
News
24 h / 7 T
Aufrufe
7 Tage

Aktien

Kurs

%
News
24 h / 7 T
Aufrufe
7 Tage

Xetra-Orderbuch

Fonds

Kurs

%

Devisen

Kurs

%

Rohstoffe

Kurs

%

Themen

Kurs

%

Erweiterte Suche
Marketwired
136 Leser
Artikel bewerten:
(0)

Canamex Confirms Bruner Potential

VANCOUVER, BRITISH COLUMBIA -- (Marketwire) -- 02/22/11 -- Canamex Resources Corp. (TSX VENTURE: CSQ)(FRANKFURT: CX6) is pleased to announce that it has completed Phase 1 reverse circulation drilling at its Bruner project located in central Nevada, 68 km northwest of the Round Mountain Mine. A total of 11 holes totaling 5,000 feet or 1,525 m were drilled and all geochemical results have been received. Results of initial metallurgy are also in hand.

Out of the 11 holes drilled, 8 have +100 feet (30.5 m) true thicknesses of +0.01 oz/ton (0.34 g/t) Gold Equivalent (abbreviated as "+0.01 GE"), and 5 have +200 feet (61 m) +0.01 GE. Drill hole B1006 has the thickest interval, containing a true thickness of 320 feet (97.5 m) averaging 0.015 oz/ton (0.51 g/t) GE. A few higher grade veins were intersected within the thick low grade zones including 5 feet (1.5 m) averaging 0.289 oz/ton (9.89 g/t) gold and 4.58 oz/ton (157.0 g/t) silver and 5 feet at 0.220 oz/ton (7.53 g/t) gold and 0.81 oz/ton (27.6 g/t) silver. Summary results are shown in the table attached.

Canamex commissioned ALS Chemex Laboratory of Sparks, Nevada to conduct a set of initial metallurgy "bottle roll" tests from selected mineralized intervals of the recently completed drilling program. A total of seven composites at various grades were subjected to a grinding and 24 hour cyanide leach to determine recovery of contained gold (only) by cyanide-leach methods. Results of this testing indicate average gold recoveries in excess of 90%. These favorable results suggest that gold at Bruner may be recoverable by standard heap leaching methods.

A systematic QA/QC program including check and repeat assays for each drill hole, secure transport and analysis by an ISO 9001:2000 certified lab has insured the reliability of the results. Analysis was performed by ALS Chemex in their Nevada facilities.

Initial interpretation of the drilling results indicates the gold/silver mineralization occurs as a moderately southwest dipping tabular body beginning at or near the surface. The Company drilled -45 degree angle holes to the east-northeast and intersected the body perpendicular to its dip. The location of the bulk low grade body appears partially controlled by the location of a welded tuff unit that is the primary host. This unit may be receptive to the brittle fractures that appear to host most of the mineralization. Complete oxidation of sulfides occurs to at least 800 feet (244 m) beneath the surface.

The Bruner project is associated with a paleo-hot springs system in a caldera associated volcanic setting very similar to the Round Mountain mine. Round Mountain is an open pit, heap-leach mine that has produced over 10 million ounces of gold over a 30 year period, with the average grade currently being mined of 0.018 oz/ton (0.62 g/t) gold. Cut-off grades for Round Mountain and several other oxide ore heap leach operations in Nevada range from 0.003 to 0.005 oz/ton (0.10-0.17 g/t) gold.

Canamex is encouraged by the results of Phase 1 drilling, and will continue to attempt expansion of the mineralized zone which is currently open to the north and east.

Canamex has an option agreement with Provex Resources Inc., a Nevada corporation, to earn a 75% interest in the Bruner property. The property covers virtually all of the significant mines of the district, and consists of 98 unpatented and 21 patented mining claims covering a total of approximately 963 hectares (2,380 acres). Historic work by Morrison-Knudsen, Miramar, Glamis, Newmont, Kennecott and others have identified the resource Canamex is currently drilling, along with several other poorly tested gold/silver anomalies. Canamex will first determine the size and grade of the July-Duluth resource using National Instrument 43-101 guidelines, and then test the other identified anomalies. A map of completed drill holes is shown on the Canamex website (see attached Phase I Summary Drill Results).

Richard Kern (P. Geol.) is the Company's qualified person on this project. Mr. Kern prepared the technical information contained in this news release.

For more information on Canamex and the Bruner project please visit the Company's website at http://www.canamex.us.

ON BEHALF OF THE BOARD

Herb Duerr, Director

--------------------------------------------------------------------------
Phase 1 Summary Drill Results Bruner Project (greater than or equal to
5 feet @ greater than or equal to 0.01 oz/ton gold equivalent) 02/11
--------------------------------------------------------------------------
                    Inter-                        True         Sil-   Gold
Hole     From    To   val  True    Gold  Silver  Width  Gold   ver   Equiv.
No.     (feet)(feet)(feet)Width (oz/ton)(oz/ton)    (m) (g/t) (g/t)(oz/ton)
--------------------------------------------------------------------------
B1001     180   185    5    5.0   0.011    0.07    1.5  0.37  2.30   0.012
--------------------------------------------------------------------------
B1002      15    75   60   60.0   0.010    0.12   18.3  0.33  3.94   0.012
           95   100    5    5.0   0.009    0.07    1.5  0.32  2.40   0.011
--------------------------------------------------------------------------
B1003      10    15    5    5.0   0.019    0.03    1.5  0.66  1.10   0.020
          150   160   10   10.0   0.014    0.07    3.0  0.49  2.30   0.015
          180   200   20   20.0   0.013    0.10    6.1  0.44  3.38   0.015
--------------------------------------------------------------------------
B1004     155   165   10  10.00   0.010    0.16    3.0  0.35  5.40   0.013
          200   225   25   25.0   0.008    0.29    7.6  0.26  9.80   0.012
          270   345   75   75.0   0.004    0.36   22.9  0.14 12.47   0.010
          385   390    5    5.0   0.009    0.08    1.5  0.33  2.70   0.011
--------------------------------------------------------------------------
B1005       0    10   10   10.0   0.076    0.05    3.0  2.61  1.80   0.077
          150   155    5    5.0   0.014    0.06    1.5  0.49  2.00   0.015
          325   455  130  130.0   0.017    0.20   39.6  0.59  6.72   0.020
Including 350   355    5    5.0   0.220    0.81    1.5  7.53 27.60   0.237
          495   525   30   30.0   0.004    0.47    9.1  0.12 16.13   0.011
          565   570    5    5.0   0.005    0.41    1.5  0.17 14.08   0.011
          565   595   30   30.0   0.005    0.41    9.1  0.17 14.08   0.011
--------------------------------------------------------------------------
B1006     115   120    5    5.0   0.013    0.05    1.5  0.43  1.60   0.013
          140   265  125  125.0   0.010    0.20   38.1  0.33  6.69   0.013
          290   455  165  165.0   0.008    0.47   50.3  0.29 16.26   0.016
          560   585   25   25.0   0.009    0.41    7.6  0.30 14.10   0.016
--------------------------------------------------------------------------
B1007       0    50   50   50.0   0.079    1.63   15.2  2.70 55.87   0.106
Including  20    25    5    5.0   0.289    4.58    1.5  9.89157.00   0.365
          125   165   40   40.0   0.016    0.18   12.2  0.54  6.18   0.019
          190   225   35   35.0   0.028    0.41   10.7  0.96 13.97   0.035
          325   335   10   10.0   0.007    0.32    3.0  0.25 10.90   0.013
--------------------------------------------------------------------------
B1008      60   165  105  105.0   0.035    0.52   32.0  1.21 17.87   0.044
          185   190    5    5.0   0.022    0.20    1.5  0.76  6.70   0.025
--------------------------------------------------------------------------
B1009       5    10    5    5.0   0.029    0.03    1.5  1.00  0.90   0.030
           35    40    5    5.0   0.010    0.09    1.5  0.35  3.10   0.012
           80    85    5    5.0   0.013    0.03    1.5  0.44  1.10   0.013
          155   205   50   50.0   0.025    0.26   15.2  0.85  8.90   0.029
Including 185   190    5    5.0   0.158    0.25    1.5  5.41  8.40   0.130
          235   250   15   15.0   0.011    0.07    4.6  0.38  2.30   0.012
          285   300   15   15.0   0.012    1.06    4.6  0.41 36.30   0.029
          445   455   10   10.0   0.025    0.29    3.0  0.87  9.85   0.030
          480   500   20   20.0   0.009    0.08    6.1  0.30  2.70   0.010
          530   610   80   80.0   0.016    0.07   24.4  0.55  2.51   0.017
--------------------------------------------------------------------------
B1010       5    55   50   50.0   0.011    0.04   15.2  0.39  1.25   0.012
          160   165    5    5.0   0.013    0.01    1.5  0.45  0.50   0.013
          265   405  140  140.0   0.005    0.83   42.7  0.16 28.33   0.018
          540   550   10   10.0   0.018    0.09    3.0  0.61  3.00   0.019
--------------------------------------------------------------------------
B1011      15   210  195  195.0   0.016    0.42   59.4  0.54 14.40   0.023
Including 155   160    5    5.0   0.149    2.48    1.5  5.09 84.90   0.198
          345   355   10   10.0   0.011    0.08    3.0  0.37  2.65   0.012
          390   395    5    5.0   0.006    0.26    1.5  0.19  8.80   0.010
--------------------------------------------------------------------------
- Gold/Silver ratio used for Gold Equivalent values is 60/1
  Metallurgical recoveries and net smelter returns are assumed to be 100%.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Contacts:
Canamex Resources Corp.
Herb Duerr
Director
(604) 718-2800
(604) 718-2808 (FAX)
info@canamex.us
www.canamex.us

© 2011 Marketwired
Werbehinweise: Die Billigung des Basisprospekts durch die BaFin ist nicht als ihre Befürwortung der angebotenen Wertpapiere zu verstehen. Wir empfehlen Interessenten und potenziellen Anlegern den Basisprospekt und die Endgültigen Bedingungen zu lesen, bevor sie eine Anlageentscheidung treffen, um sich möglichst umfassend zu informieren, insbesondere über die potenziellen Risiken und Chancen des Wertpapiers. Sie sind im Begriff, ein Produkt zu erwerben, das nicht einfach ist und schwer zu verstehen sein kann.