Anzeige
Mehr »
Login
Sonntag, 28.04.2024 Börsentäglich über 12.000 News von 686 internationalen Medien
Nurexone Biologic: Jetzt diese wirklich einzigartige Chance ergreifen?
Anzeige

Indizes

Kurs

%
News
24 h / 7 T
Aufrufe
7 Tage

Aktien

Kurs

%
News
24 h / 7 T
Aufrufe
7 Tage

Xetra-Orderbuch

Fonds

Kurs

%

Devisen

Kurs

%

Rohstoffe

Kurs

%

Themen

Kurs

%

Erweiterte Suche
Marketwired
228 Leser
Artikel bewerten:
(0)

Sulliden Drills High-Grade Gold and Silver at Shahuindo-Intersects 2.34 g/t Gold and 53.6 g/t Silver Over 23 Metres

TORONTO, ONTARIO -- (Marketwire) -- 03/14/11 -- Sulliden Gold Corporation Ltd. ("Sulliden", or the "Company") (TSX: SUE)(OTCQX: SDDDF) is pleased to announce new drilling results from its 100%-owned Shahuindo Gold and Silver Project in northern Peru. The results continue to demonstrate the growth and continuity of the mineral system along the currently defined 3.8 kilometre strike length of the deposit, which remains open in all directions and at depth.

Significant gold and silver intercepts from this group of exploration results are highlighted below. Complete results are reported in Table 1. An economic cut-off grade of 0.17 g/t in gold oxides was established by AMEC in the NI 43-101 Preliminary Assessment (see December 8, 2009 news release).

Significant Gold drill intercepts:

--  Hole SH10-153 in the West Zone
    --  1.28 g/t Gold over 21.0 meters including 6.79 g/t Gold over 3.0
        metres
    --  2.34 g/t Gold over 23.0 metres including 6.07 g/t Gold over 4.9
        metres

--  Hole SH10-154 in the Central Zone
    --  0.87 g/t Gold over 123.5 metres including 2.06 g/t Gold over 26.6
        metres
    --  2.23 g/t Gold over 24.7 metres including 6.80 g/t Gold over 6.4
        metres

Significant Silver drill intercepts:

--  Hole SH10-153 in the West Zone
    --  53.6 g/t Silver over 23.0 metres including 176.6 g/t Silver over 4.9
        metres

--  Hole SH10-167 in the West Zone
    --  41.9 g/t Silver over 51.0 metres including 104.1 g/t Silver over
        12.0 metres

--  Hole SH10-172 in the Central Zone
    --  55.1 g/t Silver over 36.0 metres including 158.3 g/t Silver over 9.2
        metres

The 70,000 metre exploration program planned for 2011 is underway. Sulliden currently has six drills operating on the Shahuindo property. Drilling is ongoing along the Central Corridor to continue defining the shape and extent of the mineralization, and the Company is also focusing on the other targets outlined in the 2011 exploration program released on December 7th, 2010. These targets include the North-West and South-East extensions, which represent a 60% increase to the known Central Corridor strike length, drilling at depth to test the sulphide mineralization, as well as drilling in the North and South Corridors.

Stephane Amireault, Vice President of Exploration for Sulliden, commented, "We are very pleased with the ongoing success of our drilling program. The new results continue to broaden the ore body beyond the current mineralized envelope along the length of the Central Corridor and we are gaining a better understanding of the structural context of the deposit. This improved geological understanding will likely help us identify future drilling targets in the Central Corridor."

Summary of Results

The new results from 21 holes representing approximately 4,850 meters of drilling are presented below in Table 1. The locations of the new holes in the East, Central and West zones are shown in Figure 1. Figure 2 highlights results from new drill holes in section 750E of the Central Zone and graphically demonstrates the interpretation of newly identified mineralization (in purple) being added to the mineral envelopes as defined in the Preliminary Assessment (in red).

To view Figure 1 - Plan View of Mineral Deposit with New Collar Locations, please visit the following link: http://media3.marketwire.com/docs/Plan%20View%20Figure.jpg

To view Figure 2 - Central Zone, Section 750E, please visit the following link: http://media3.marketwire.com/docs/Section%20-%20Central%20Zone.jpg

(i)The new grade shells highlighted in Figure 2 are geological interpretations that are preliminary in nature and should not be relied on.

Table 1 - Drill Results

----------------------------------------------------------------------------
                                  WEST ZONE
----------------------------------------------------------------------------
                        From       To   Interval  True Width   Gold   Silver
Drill hole #        (metres)  (metres)  (metres) (metres)(1)   (g/t)   (g/t)
----------------------------------------------------------------------------

----------------------------------------------------------------------------
SH10-152                19.2      22.4       3.2         2.2    0.48     4.0
----------------------------------------------------------------------------
SH10-152                35.9      39.6       3.7         2.5    3.17     3.8
----------------------------------------------------------------------------
SH10-152                46.7      68.1      21.4        14.3    0.40     1.9
----------------------------------------------------------------------------
SH10-152               204.6     207.4       2.8         1.8    0.27     4.4
----------------------------------------------------------------------------

----------------------------------------------------------------------------
SH10-153                31.6      34.6       3.0         2.1    0.40     1.3
----------------------------------------------------------------------------
SH10-153 (2)            49.6      70.6      21.0        14.4    1.28     1.5
----------------------------------------------------------------------------
including (2)           66.1      69.1       3.0         2.1    6.79     4.7
----------------------------------------------------------------------------
SH10-153 (2)            86.9     100.6      13.7         9.3    1.88    21.5
----------------------------------------------------------------------------
including (2)           88.5      94.1       5.6         3.8    4.24    43.5
----------------------------------------------------------------------------
SH10-153 (2, 3)        104.6     127.6      23.0        15.5    2.34    53.6
----------------------------------------------------------------------------
including (2, 3)       107.7     112.6       4.9         3.3    6.07   176.6
----------------------------------------------------------------------------

----------------------------------------------------------------------------
SH10-158 (2)            92.1      98.1       6.0         4.3    2.75     0.8
----------------------------------------------------------------------------

----------------------------------------------------------------------------
RSH11-108               10.5      15.0       4.5         2.9    0.23    0.70
----------------------------------------------------------------------------
RSH11-108               25.5      40.5      15.0         9.6    0.30     6.7
----------------------------------------------------------------------------
RSH11-108               61.5      66.0       4.5         2.9    0.46     7.8
----------------------------------------------------------------------------

----------------------------------------------------------------------------
SH10-167 (3)            65.5     116.5      51.0        32.4    0.71    41.9
----------------------------------------------------------------------------
including (3)           67.0      79.0      12.0         7.7    1.09   104.1
----------------------------------------------------------------------------
----------------------------------------------------------------------------
                                CENTRAL ZONE
----------------------------------------------------------------------------
                        From       To   Interval  True Width   Gold   Silver
Drill hole #        (metres)  (metres)  (metres) (metres)(1)   (g/t)   (g/t)
----------------------------------------------------------------------------

----------------------------------------------------------------------------
SH10-151                46.9      54.2       7.3         4.6    0.37     1.0
----------------------------------------------------------------------------
SH10-151                61.7      82.7      21.0        13.3    0.30     4.2
----------------------------------------------------------------------------
SH10-151               111.2     151.7      40.5        25.4    0.35     3.3
----------------------------------------------------------------------------
SH10-151               160.7     163.7       3.0         1.9    1.88    31.7
----------------------------------------------------------------------------
SH10-151               171.2     180.2       9.0         5.6    0.85     2.8
----------------------------------------------------------------------------
SH10-151 (2)           193.7     255.2      61.5        38.5    1.07     4.4
----------------------------------------------------------------------------
SH10-151               267.2     312.2      45.0        28.2    0.35     9.7
----------------------------------------------------------------------------
SH10-151               333.2     337.7       4.5         2.8    0.28     3.0
----------------------------------------------------------------------------

----------------------------------------------------------------------------
SH10-154                 0.0      26.2      26.2        14.4    0.64     4.1
----------------------------------------------------------------------------
SH10-154 (2)           111.7     128.1      16.4         8.7    0.93     6.2
----------------------------------------------------------------------------
SH10-154 (2, 3)        138.7     262.2     123.5        65.4    0.87    21.3
----------------------------------------------------------------------------
including (2, 3)       207.7     234.3      26.6        14.1    2.06    62.7
----------------------------------------------------------------------------
SH10-154 (2)           268.8     293.5      24.7        13.2    2.23    13.8
----------------------------------------------------------------------------
including (2)          268.8     275.2       6.4         3.4    6.80    44.5
----------------------------------------------------------------------------

----------------------------------------------------------------------------
SH10-155                23.7      46.0      22.3        15.4    0.75     1.0
----------------------------------------------------------------------------
SH10-155                57.3     142.8      85.5        57.1    0.52     4.8
----------------------------------------------------------------------------

----------------------------------------------------------------------------
SH10-156 (4)            45.0      51.0       6.0         4.2    3.34    12.7
----------------------------------------------------------------------------

----------------------------------------------------------------------------
SH10-159                95.3     111.8      16.5         6.2    0.46     2.5
----------------------------------------------------------------------------

----------------------------------------------------------------------------
SH10-160                33.3      45.3      12.0         7.6    0.71     1.9
----------------------------------------------------------------------------

----------------------------------------------------------------------------
SH10-161 (2)            36.0      96.0      60.0        40.1    0.99    18.2
----------------------------------------------------------------------------
SH10-161 (5)           262.2     297.0      34.8        23.6    0.41     4.7
----------------------------------------------------------------------------

----------------------------------------------------------------------------
SH10-162                53.1      87.8      34.7        22.5    0.61     1.2
----------------------------------------------------------------------------
SH10-162 (5)           176.3     273.8      97.5        61.3    0.54    10.5
----------------------------------------------------------------------------

----------------------------------------------------------------------------
SH10-164               177.6     192.1      14.5        10.1    0.31    20.3
----------------------------------------------------------------------------

----------------------------------------------------------------------------
SHV10-165               13.7      76.7      63.0        43.5    0.67     4.1
----------------------------------------------------------------------------
including               16.7      22.7       6.0         4.1    3.07    19.2
----------------------------------------------------------------------------
SHV10-165              139.7     153.2      13.5         9.2    0.61     7.3
----------------------------------------------------------------------------

----------------------------------------------------------------------------
SH10-166 (4)             6.0      10.5       4.5         3.2    0.44     1.3
----------------------------------------------------------------------------
SH10-166                10.5     121.5     111.0        77.1    0.82     9.2
----------------------------------------------------------------------------
including               55.5      66.0      10.5         7.3    1.76    43.8
----------------------------------------------------------------------------
including              108.0     121.5      13.5         9.2    1.79    25.9
----------------------------------------------------------------------------
SH10-166               135.0     141.0       6.0         4.1    0.26     0.3
----------------------------------------------------------------------------
SH10-166               151.5     165.0      13.5         9.1    0.23     0.2
----------------------------------------------------------------------------
SH10-166               169.0     180.0      11.0         7.4    0.21     0.2
----------------------------------------------------------------------------
SH10-166               247.5     255.0       7.5         5.1    0.28     0.3
----------------------------------------------------------------------------

----------------------------------------------------------------------------
SHV10-168               22.9      94.9      72.0        48.4    0.35     1.6
----------------------------------------------------------------------------

----------------------------------------------------------------------------
SHV10-171                0.0      32.2      32.2        21.7    0.45     1.2
----------------------------------------------------------------------------

----------------------------------------------------------------------------
SH10-172                36.0     106.5      70.5        49.5    0.60     9.9
----------------------------------------------------------------------------
including               67.5      76.5       9.0         6.3    1.49    17.5
----------------------------------------------------------------------------
SH10-172 (2, 3)        184.5     220.5      36.0        24.1    1.88    55.1
----------------------------------------------------------------------------
including (3)          194.8     204.0       9.2         6.2    3.26   158.3
----------------------------------------------------------------------------
including (2)          210.0     216.0       6.0         4.0    4.45    45.5
----------------------------------------------------------------------------
----------------------------------------------------------------------------
                                  EAST ZONE
----------------------------------------------------------------------------
                        From       To   Interval  True Width   Gold   Silver
Drill hole #        (metres)  (metres)  (metres) (metres)(1)   (g/t)   (g/t)
----------------------------------------------------------------------------

----------------------------------------------------------------------------
SHG10-163 (6)           25.5      66.0      40.5        22.9    0.36    11.6
----------------------------------------------------------------------------
SHG10-163 (6)          106.5     148.5      42.0        23.2    0.44     3.7
----------------------------------------------------------------------------

----------------------------------------------------------------------------
SHG10-169 (2, 6)       139.5     169.5      30.0        21.1    1.39     7.3
----------------------------------------------------------------------------
including (2, 6)       145.7     154.5       8.8         6.2    4.06    18.9
----------------------------------------------------------------------------

1.  Assuming vertical or near vertical zone, perpendicular or near
    perpendicular to the plane defined by the drill hole. Geological
    understanding of the mineralized zones are continuing to develop as the
    project advances.
2.  One or more Au values cut to 7 g/t Au
3.  One or more Ag values cut to 300 g/t Ag
4.  Mineralization in overburden
5.  Mineralization found within 10 meters of end of hole
6.  PQ twin hole (a "twin" hole is defined by being collared within 3 meters
    and at the same dip and inclination as its adjacent hole)

QUALITY CONTROL AND ASSURANCE

Stephane Amireault, P.Eng., Vice President Exploration for Sulliden is the Qualified Person responsible for the management of the exploration program and disclosure of the drill results as defined by National Instrument 43-101. Mr. Amireault has read and approved the technical and scientific information in this news release.

The analyses for this drilling campaign were carried out by ALS Chemex in Lima, Peru exercising a thorough Quality Control and Assurance program (QA/QC). All ALS Chemex labs are ISO 9000 registered laboratories. All gold assays reported in the press release were obtained by standard 50g fire assaying with AA finish. All silver assays reported in the press release were obtained by Aqua-Regia dissolution followed by ICP-AES measurement.

ABOUT SULLIDEN

Sulliden is a Canadian-based precious metals company focused on the exploration and development of the Shahuindo Project, its 100%-owned flagship property located in a prolific gold producing district in northern Peru. This project neighbours world-class gold mines including Barrick Gold's Lagunas Norte Mine, 30 km to the south, and the Yanacocha Mine operated by Newmont Mining Company, 80 km to the north; both million-ounce per year producing mines. A positive Preliminary Assessment for the project was completed in February 2010 and a bankable Feasibility Study is currently underway. While the Company progresses towards its goal of becoming a gold producer, a significant focus is being placed on exploration drilling to increase the mineral resource, which remains open in all directions and at depth. Based on the drilling success in 2009/2010, Sulliden plans to undertake approximately 70,000 meters of drilling in 2011 to continue the mineral expansion on the property. Sulliden is led by a strong management team with the proven ability to develop, finance and operate mining projects and is poised to generate superior value for its shareholders.

On behalf of Sulliden Gold Corporation Ltd.

Peter Tagliamonte                  Stan Bharti
President and CEO                  Chairman

For further information on Sulliden please visit the company website at www.sulliden.com.

If you would like to be added to Sulliden's news distribution list, please send your email address to contact@sulliden.com

Caution regarding forward-looking information:

This press release contains "forward looking information" within the meaning of applicable Canadian securities legislation. Forward looking information includes without limitation, statements regarding the size and quality of the company's mineral resources, progress in development of mineral properties, future capital and operating expenses, future metal prices, the future financial or operating performance of the Company, the prospective mineralization of the properties, planned exploration programs and anticipated production schedule. Generally, forward looking information can be identified by the use of forward-looking terminology such as "plans", "expects" or "does not expect", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates" or "does not anticipate", or "believes", or variations of such words and phrases or state that certain actions, events or results "may", "could", "would", "might" or "will be taken", "occur" or "be achieved". Forward-looking information is subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of the Company to be materially different from those expressed or implied by such forward-looking information, including but not limited to: general business, economic, competitive, geopolitical and social uncertainties; the actual results of current exploration activities; other risks of the mining industry and the risks described in the annual information form of the Company. Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward looking information. The Company does not undertake to update any forward-looking information, except in accordance with applicable securities laws.

Contacts:
Sulliden Gold Corporation
Caroline Arsenault
Investor Relations Manager
(416) 861-5805

Sulliden Gold Corporation
Scott Moore
Vice President Corporate Development
(416) 861-5903

Großer Insider-Report 2024 von Dr. Dennis Riedl
Wenn Insider handeln, sollten Sie aufmerksam werden. In diesem kostenlosen Report erfahren Sie, welche Aktien Sie im Moment im Blick behalten und von welchen Sie lieber die Finger lassen sollten.
Hier klicken
© 2011 Marketwired
Werbehinweise: Die Billigung des Basisprospekts durch die BaFin ist nicht als ihre Befürwortung der angebotenen Wertpapiere zu verstehen. Wir empfehlen Interessenten und potenziellen Anlegern den Basisprospekt und die Endgültigen Bedingungen zu lesen, bevor sie eine Anlageentscheidung treffen, um sich möglichst umfassend zu informieren, insbesondere über die potenziellen Risiken und Chancen des Wertpapiers. Sie sind im Begriff, ein Produkt zu erwerben, das nicht einfach ist und schwer zu verstehen sein kann.