Anzeige
Mehr »
Mittwoch, 10.06.2026 - Börsentäglich über 12.000 News
Pentagon in Alarmbereitschaft? Dieser Rohstoff könnte jetzt Gold in den Schatten stellen
Anzeige

Indizes

Kurs

%
News
24 h / 7 T
Aufrufe
7 Tage

Aktien

Kurs

%
News
24 h / 7 T
Aufrufe
7 Tage

Xetra-Orderbuch

Fonds

Kurs

%

Devisen

Kurs

%

Rohstoffe

Kurs

%

Themen

Kurs

%

Erweiterte Suche
Marketwired
53 Leser
Artikel bewerten:
(0)

CaNickel Announces Updated Mineral Reserves and Resources for the Bucko Lake Nickel Project

VANCOUVER, BRITISH COLUMBIA -- (Marketwire) -- 10/29/12 -- CaNickel Mining Ltd. (TSX: CML) ("CaNickel" or the "Company") announces the results of an updated National Instrument ("NI") 43-101 Technical Report with an effective date of October 19, 2012 covering Bucko Lake Mine and its satellite properties, M11A, Apex, Halfway Lake, and Bowden Lake projects in Wabowden, Manitoba ("CaNickel 2012 Technical Report"), which will be made available for review on the SEDAR system at www.sedar.com and on the Company's website at www.canickel.com in due course.

The report was prepared by Lane A. Griffin, P.Geo., Paul L. Martin, P.Eng., and Chris C. Broili, P.Geo.. These authors are independent from the Company and qualified person as defined by NI 43-101.

The report is an update of the Mineral Reserves and Resources for Bucko Lake Mine and it's satellite properties based on drilling results obtained from surface and underground drilling completed from the 1960's to 2012, as well as an overview of the current mining and milling activities at Bucko Lake Mine. The report is also prepared in response to a technical disclosure reviewed conducted by British Columbia Security Commission in February 2012.

2012 Reserve and Resource Estimate

The mineral reserve and resource estimate for Bucko Lake Mine and its satellite properties as of April 1, 2012 are summarized in the table below:

--------------------------------------------------------------------------
Deposit                                              Average     Contained
(values round to nearest      Cut-Off                  Grade        Nickel
 1,000)                    Grade (Ni%)      Tonnes      (Ni%)         (lbs)
--------------------------------------------------------------------------
Bucko Lake Mine
--------------------------------------------------------------------------
Proven Reserves(i)              1.25%      616,000     1.43%    19,402,000
--------------------------------------------------------------------------
Probable Reserves(i)            1.25%    1,994,000     1.44%    63,129,000
--------------------------------------------------------------------------
Total Reserves(i)               1.25%    2,610,000     1.43%    82,531,000
--------------------------------------------------------------------------

--------------------------------------------------------------------------
Measured Resources(ii)          1.00%      751,000     1.37%    22,680,000
--------------------------------------------------------------------------
Indicated Resources(ii)         1.00%    2,845,000     1.28%    80,059,000
--------------------------------------------------------------------------
Total Measured and
 Indicated Resources            1.00%    3,596,000     1.30%   102,739,000
--------------------------------------------------------------------------

--------------------------------------------------------------------------
Inferred Resources(iii)         1.00%    5,043,000     1.41%   156,887,000
--------------------------------------------------------------------------

--------------------------------------------------------------------------
Satellite Deposits
--------------------------------------------------------------------------
M11A
--------------------------------------------------------------------------
Indicated Resources(ii)         1.00%      800,000     1.17%    20,639,000
--------------------------------------------------------------------------
Inferred Resources(iii)         1.00%      525,000     1.11%    12,850,000
--------------------------------------------------------------------------

--------------------------------------------------------------------------
Apex
--------------------------------------------------------------------------
Inferred Resources(iii)         1.00%       41,000     1.19%     1,076,000
--------------------------------------------------------------------------

--------------------------------------------------------------------------
Bowden
--------------------------------------------------------------------------
Inferred Resources(iii)         1.00%    2,044,000     1.16%    52,281,000
--------------------------------------------------------------------------

--------------------------------------------------------------------------
Halfway Lake
--------------------------------------------------------------------------
Inferred Resources(iii)         1.00%      900,000     1.20%    23,814,000
--------------------------------------------------------------------------
Notes to the reserve and resource statement:

(i) Proven and Probable Reserves determined from Measured and Indicated
Resources using a 1.25% nickel cut-off with a 15% margin incorporated into
the cut-off grade evaluation. 2012 Reserves were calculated using $8.50 US
per pound long term nickel price based on the 3 year trailing average nickel
spot price and 2012 historical Bucko Lake Mine, Mill and G&A operating
costs, mill recoveries and smelting charges.

(ii) Mineral Resources which are not mineral reserves do not have
demonstrated economic viability. The estimate of mineral resources may be
materially affected by environmental, permitting, legal, title, taxation,
socio-political, marketing or other relevant issues.

(iii) The quality and grade of reported inferred resources in this
estimation are conceptual in nature and there has been insufficient
exploration to define these inferred resources as an indicated or measured
mineral resource and it is uncertain if further exploration will result in
upgrading them to an indicated or measured mineral resource category.

Bucko Lake Mine

As per the CaNickel 2012 Technical Report, based on 1,000 tonnes per day or 363,000 tonnes per year using long term average nickel price of US$8.50 per pound, historical 2012 unit cost, and 6% discount rate, the pre-tax net present value of Bucko Lake Mine's Reserves was estimated as $80.0 million and the project economics is breakeven at US$6.75/lb nickel metal price.

Due to weak nickel price, Bucko Lake Mine currently is put into care and maintenance. Although the Company is carrying studies to optimize the mine plan, the restart-up operation at Bucko Lake Mine is uncertain and mainly depends on the nickel metal price.

M11A Deposit

Subject to the financial resources, the Company is planning to carry out a preliminary assessment study to investigate the possibility of developing the M11A deposit as a supplemental feed deposit to Bucko Lake Mine. More surface drilling programs conducted at M11A is expected.

Qualified Person

Lane A. Griffin, P.Geo., Paul L. Martin, P.Eng., and Chris C. Broili, P.Geo are qualified persons as defined by NI 43-101 and have reviewed and consented to this press release and that it fairly and accurately represents the information in the CaNickel 2012 Technical Report which supports the disclosure.

James Wong, P. Geo., P. Eng., is the qualified person for CaNickel under NI 43-101 and has reviewed and given consent to this press release.

ABOUT CANICKEL

CaNickel Mining Limited is a Canadian junior mining company that owns and operates the Bucko Lake Nickel Mine near Wabowden, Manitoba. The Company also holds nickel, copper and Platinum Group Mineral (PGM) projects in the Thompson Nickel Belt and Sudbury Basin.

Advisory Respecting Forward-Looking Information

This press release contains forward-looking statements under Canadian securities legislation. Forward looking statements include, but are not limited to, statements with respect to carrying studies to optimize the mine plan, restart-up operation at Bucko Lake Mine, and carrying out a preliminary assessment study to investigate the possibility of developing the M11A deposit. Generally, forward-looking statements can be identified by the use of forward-looking terminology such as "plans", "expects" or "does not expect", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates" or "does not anticipate", or "believes", or variations of such words and phrases or statements that certain actions, events or results "may", "could", "would", "might" or "will be taken", "occur" or "be achieved". Forward-looking statements are based on the opinions and estimates of management as of the date such statements are made. Forward-looking statements are subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of the Company to be materially different from those expressed or implied by such forward-looking statements, including but not limited to those risks of the Company described in its annual information form that is available under its profile on SEDAR at www.sedar.com. Although management of the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking statements, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements. The Company does not undertake to update any forward-looking statements, except in accordance with applicable securities laws.

Contacts:
CaNickel Mining Limited
Derek Liu
CFO and Corporate Secretary
778-372-1806
604-254-8863 (FAX)
info@canickel.com
www.canickel.com

© 2012 Marketwired
Software vor dem Comeback – diese 5 Aktien könnten durchstarten!
Während Halbleiter- und KI-Infrastrukturwerte von einem Hoch zum nächsten jagen, wurden viele Software-Aktien in den vergangenen Monaten regelrecht aus den Depots gedrängt. Die Angst vor Disruption hat Investoren zu einem radikalen Strategiewechsel veranlasst – mit der Folge, dass zahlreiche Qualitätsunternehmen heute auf Mehrjahrestiefs notieren.

Doch genau hier entsteht eine seltene Chance. Denn während die Bewertungen im Halbleitersektor inzwischen auf ambitionierten Niveaus liegen, ist der Bewertungsabschlag bei Software-Titeln so hoch wie seit Jahren nicht mehr. Gleichzeitig liefern viele Unternehmen weiterhin starke Wachstumszahlen und integrieren KI erfolgreich in ihre Geschäftsmodelle. Die Diskrepanz zwischen Kursentwicklung und operativer Stärke könnte sich schon bald auflösen.

Für Anleger bedeutet das: antizyklisch denken und gezielt zugreifen, bevor der Markt dreht. Denn erste technische Signale deuten darauf hin, dass sich die Trendwende bereits anbahnt.

In unserem aktuellen Spezialreport stellen wir fünf Software-Aktien vor, die besonders aussichtsreich positioniert sind – mit starker Marktstellung, attraktiver Bewertung und hohem Aufholpotenzial.

Jetzt den kostenlosen Report sichern – bevor der Software-Rebound Fahrt aufnimmt!
Werbehinweise: Die Billigung des Basisprospekts durch die BaFin ist nicht als ihre Befürwortung der angebotenen Wertpapiere zu verstehen. Wir empfehlen Interessenten und potenziellen Anlegern den Basisprospekt und die Endgültigen Bedingungen zu lesen, bevor sie eine Anlageentscheidung treffen, um sich möglichst umfassend zu informieren, insbesondere über die potenziellen Risiken und Chancen des Wertpapiers. Sie sind im Begriff, ein Produkt zu erwerben, das nicht einfach ist und schwer zu verstehen sein kann.