Anzeige
Mehr »
Mittwoch, 10.06.2026 - Börsentäglich über 12.000 News
Vier Bohrlöcher, vier Treffer - bestätigt sich hier ein neues Uran-System?
Anzeige

Indizes

Kurs

%
News
24 h / 7 T
Aufrufe
7 Tage

Aktien

Kurs

%
News
24 h / 7 T
Aufrufe
7 Tage

Xetra-Orderbuch

Fonds

Kurs

%

Devisen

Kurs

%

Rohstoffe

Kurs

%

Themen

Kurs

%

Erweiterte Suche
Marketwired
29 Leser
Artikel bewerten:
(0)

Oroco Reports on South Extension Drilling at Cerro Prieto

VANCOUVER, BRITISH COLUMBIA -- (Marketwire) -- 05/14/12 -- Oroco Resource Corp. (TSX VENTURE: OCO) ("Oroco" or "the Company") is pleased to report additional results from the 2011 and 2012 exploration and infill drill program at its Cerro Prieto Project in northern Sonora State, Mexico.

As part of this overall drill program, the Company tested the southern extension of the mineralized structure on strike from the southern boundary of the area containing the current resource, a length of 500 meters from Line 150N to Line 350S. All but one of the completed drill holes intersected intervals of gold mineralization greater than the cut-off grade used in the existing resource estimate for Cerro Prieto.

Highlights of the results include:

1.  Holes CP067 and CP068A, both drilled on line 100N (50 m south of the
    boundary of the current resource estimation), intersected 10.35 m of
    0.65 g/t Au and 11.2 m of 0.60 g/t Au respectively;
2.  At Line 200S, hole CP095 intersected 15.0 m of 0.50 g/t Au in one of two
    zones intersected;
3.  At Line 250S, hole CP097 intersected 9.00 m of 3.29 g/t Au in one zone
    and 12.65 m of 0.45 g/t Au in a deeper zone; and
4.  At Line 300S, hole CP098 intersected 9.15 m of 0.57 g/t Au.

The drill holes were spaced to test the structure to a maximum vertical depth of 100 meters at 50 meter intervals along strike. All drill holes intersected the structure and in some cases intersected more than one mineralized zone. Full results are shown in the following table.

Cerro Prieto South Extension Drill Results

HOLE      SECTION    FROM      TO  LENGTH      AU      AG      PB      ZN
NO.                   (m)     (m)     (m)   (g/t)   (g/t)     (%)     (%)

CP067        100N   72.50   82.85   10.35   0.650    14.2    0.25    0.86
incl                73.50   81.40    7.50   0.782    16.2    0.32    0.97

CP068A       100N   35.85   47.05   11.20   0.599    15.8    0.42    0.57
incl                40.40   47.05    6.65   0.831    19.6    0.45    0.61

CP069        050N   50.50   53.50    3.00   0.306     2.1    0.12    0.58

CP070           0   68.00   70.50    2.50   0.314      36    0.65    0.26

CP071           0   40.15   44.50    4.35   0.292     2.2    0.05    0.11
                    46.25   47.80    1.55   0.201     4.4    0.05    0.09
                    52.35   55.20    2.85   0.280     4.2    0.45    0.51

CP072         50S   70.00   74.50    4.50   0.109    67.5    0.21    0.47

CP073        100S   59.80   62.25    2.45   0.370     6.5    0.51    0.87

CP074        100S   89.30   93.00    3.70   0.310    42.4    0.37    1.20
incl                89.30   90.80    1.50   0.615     8.4    0.18    0.37
                   100.00  101.50    1.50   0.208     0.6    0.08    0.04

CP075        150S   92.00  100.00    8.00   0.471     2.8    0.48    1.13
incl                94.50   96.00    1.50   0.958     6.4    1.13    2.48

CP095        200S   55.00   59.10    4.10    0.29     2.7    0.07    0.22
                    74.00   89.00   15.00    0.50    32.9    0.27    0.52
incl                84.50   89.00    4.50    0.83    99.1    0.68    1.03

CP096        200S   83.00   85.40    2.40    0.79    34.6    0.21    0.58
                    94.00   97.00    3.00    0.28     2.7    0.44    0.91
                   106.00  110.50    4.50    0.54     1.9    0.24    1.01
                   113.50  115.00    1.50    0.56     0.8    0.07    0.18

CP097        250S   67.00   76.00    9.00    3.29    93.2    0.38    0.58
incl                68.50   71.50    3.00    7.32   201.0    0.36    0.72
                    88.00   92.50    4.50    0.67     4.3    0.11    0.30
                   109.00  121.65   12.65    0.45     2.1    0.15    0.47

CP098        300S   43.40   52.55    9.15    0.57    7.20    0.07    0.26
                    63.05   66.05    3.00    2.31   12.70    0.27    0.55
                   105.00  106.00    1.00    0.90    3.80    0.05    0.10

CP099        300S   76.00   79.00    3.00    0.30     3.6    0.14    0.39
                    89.60   92.00    2.40    0.30    36.7    0.78    2.25
                   132.00  133.50    1.50    0.62     0.8    0.01    0.10
                   142.50  145.40    2.90    0.29     1.8    0.08    0.37

CP100        350S   45.50   57.00    1.50    0.25    46.5    0.19    0.07

The south end of the current proposed open pit extends south from line 150N to Line 000, however as no drilling had previously taken place south of line 150N, the Current Resource is presently estimated only as far south as Line 150N. Drill results within this area reported herein include intersections of mineralization at gold grades greater than the cut-off grade used in the Company's previously announced resource calculation and Preliminary Economic Assessment. Previously reported surface trenching from lines 150N to 000 also include intervals of mineralization at grades greater than the cut-off, including intervals of 5.2 meters averaging 4.79 g/t Au and 21.5 g/t Ag (at 150N), 9.8 meters averaging 4.08 g/t Au and 36.2 g/t Ag (at 100N), and 6.1 meters averaging 2.05 and 9.0 Ag (at 050N).

Further south along strike, intersections from drilling at 100S to 150S and 250S to 300S are of particular interest because higher grade material was intersected under surface trenches with higher grade results (see press release March 7, 2010), including 6.0 meters averaging 1.28 g/t Au and 12.8 g/t Ag (at 100S), 4.7 meters averaging 2.36 g/t Au and 28.0 g/t Ag (at 150S), 5.5 meters averaging 4.65 g/t Au and 53.3 g/t Ag (at 272S) and 8.0 meters averaging 2.49 g/t Au and 93.4 g/t Ag (at 300S).

About Oroco

Oroco is a Canadian-based mineral exploration company with its primary focus on the accelerated development of the gold-bearing oxide zones of its Cerro Prieto Project. The Cerro Prieto Project consists of a group of 100% owned concessions comprising over 7,000 ha in northern Sonora State, Mexico.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Contacts:
Oroco Resource Corp.
Mr. Craig Dalziel
President and CEO
604-688-6200
604-688-6260 (FAX)
www.orocoresourcecorp.com

© 2012 Marketwired
Software vor dem Comeback – diese 5 Aktien könnten durchstarten!
Während Halbleiter- und KI-Infrastrukturwerte von einem Hoch zum nächsten jagen, wurden viele Software-Aktien in den vergangenen Monaten regelrecht aus den Depots gedrängt. Die Angst vor Disruption hat Investoren zu einem radikalen Strategiewechsel veranlasst – mit der Folge, dass zahlreiche Qualitätsunternehmen heute auf Mehrjahrestiefs notieren.

Doch genau hier entsteht eine seltene Chance. Denn während die Bewertungen im Halbleitersektor inzwischen auf ambitionierten Niveaus liegen, ist der Bewertungsabschlag bei Software-Titeln so hoch wie seit Jahren nicht mehr. Gleichzeitig liefern viele Unternehmen weiterhin starke Wachstumszahlen und integrieren KI erfolgreich in ihre Geschäftsmodelle. Die Diskrepanz zwischen Kursentwicklung und operativer Stärke könnte sich schon bald auflösen.

Für Anleger bedeutet das: antizyklisch denken und gezielt zugreifen, bevor der Markt dreht. Denn erste technische Signale deuten darauf hin, dass sich die Trendwende bereits anbahnt.

In unserem aktuellen Spezialreport stellen wir fünf Software-Aktien vor, die besonders aussichtsreich positioniert sind – mit starker Marktstellung, attraktiver Bewertung und hohem Aufholpotenzial.

Jetzt den kostenlosen Report sichern – bevor der Software-Rebound Fahrt aufnimmt!
Werbehinweise: Die Billigung des Basisprospekts durch die BaFin ist nicht als ihre Befürwortung der angebotenen Wertpapiere zu verstehen. Wir empfehlen Interessenten und potenziellen Anlegern den Basisprospekt und die Endgültigen Bedingungen zu lesen, bevor sie eine Anlageentscheidung treffen, um sich möglichst umfassend zu informieren, insbesondere über die potenziellen Risiken und Chancen des Wertpapiers. Sie sind im Begriff, ein Produkt zu erwerben, das nicht einfach ist und schwer zu verstehen sein kann.