Anzeige
Mehr »
Login
Samstag, 27.04.2024 Börsentäglich über 12.000 News von 686 internationalen Medien
Nurexone Biologic: Jetzt diese wirklich einzigartige Chance ergreifen?
Anzeige

Indizes

Kurs

%
News
24 h / 7 T
Aufrufe
7 Tage

Aktien

Kurs

%
News
24 h / 7 T
Aufrufe
7 Tage

Xetra-Orderbuch

Fonds

Kurs

%

Devisen

Kurs

%

Rohstoffe

Kurs

%

Themen

Kurs

%

Erweiterte Suche
Marketwired
194 Leser
Artikel bewerten:
(0)

Tembo Gold Reports Additional Drill Results From the Ngula 1 Target Including 5.09g/t Over 2.77m From 285.42m Including 11.70g/t Au Over 0.98m

TORONTO, ONTARIO -- (Marketwire) -- 09/26/12 -- Tembo Gold Corp. (TSX VENTURE: TEM)(FRANKFURT: T23)(OTCQX: TBGPF) ("Tembo" or the "Company") is pleased to report additional results from its 2012 preliminary drill program at the Ngula 1 target on the Tembo Project in the Lake Victoria goldfield of Tanzania. Drilling to date at the Ngula 1 target has encountered multiple zones of gold mineralization across a 600m strike length within a 200m wide structural package and these new drill results further validate the presence of robust gold mineralization at the Ngula 1 target.

Highlights of the latest drill results include:

--  All diamond drill results have encountered significant gold
    mineralization

--  TDD0106: 5.09g/t over 2.77m from 285.42m including 11.70g/t Au over
    0.98m

--  TRC00110: 4.22g/t Au over 5.00m from 195.00m, including 8.38g/t Au over
    2.00m;

--  TRC0125: 19.03g/t Au over 0.94m from 35.16m and 5.90g/t over 1.14m from
    208.00m

Tembo Gold President & CEO, David Scott stated, "The Ngula 1 target results are consistently intersecting strong structures with gold mineralization both under artisanal workings and along strike of these workings. This shows that although artisanal mining reveals areas of gold mineralization, there is mineralization along extensions to these structures and additional sub-parallel and crosscutting structures that are not being exploited. This supports our strategy to explore beyond artisanal mining targeting structures using magnetic lineaments as a guide. These new drill holes have again encountered significant high grade gold mineralization across multiples structures. We are very pleased with drilling to date as all diamond drill holes at Ngula 1 have encountered gold mineralization across a strike of more than 600m."

Drill Program

The Ngula 1 target consists of at least two dominant sub-parallel, near vertical, anastomosing east-west shear zones within a tightly folded, near vertical package of mafic meta-volcanics (intercalated meta-sedimentary horizons defining the northern and southern limits) with a defined strike of 600m and a width of 200m. These primary shears are frequently associated with pyrrhotite, chalcopyrite and pyrite mineralization hosting variable gold content. High grade gold mineralization is considered to occur where less prominent secondary structures (northeast and possibly northwest trending) intersect the primary east-west shear zones, providing a suitable locus for gold deposition. The meta-sedimentary "marker" horizons are similar to, and may be, the strike extent of the unit that hosts the Bulyhanhulu deposit 7km to the southeast.

Drilling has been conducted from the south and the north to optimize intersections within the package as a whole. Seven additional diamond drill holes have been drilled at -60 degrees to the north and south targeting vertical depths of between 100m and 200m on the primary east-west structures. Five of the holes were drilled on 100m spaced section lines along a 500m strike length while two in-fill holes were drilled on 50m section lines.

As anticipated, the recent drill program has intersected new gold-bearing structures which were not evident from artisanal workings. Further investigation of these new structures is currently underway, as despite containing lower sulphide content at these stratigraphic horizons they typically display similar characteristics to better-mineralized structures, strongly suggesting that they could potentially be higher-grade elsewhere along strike or down dip.

A further five in-fill holes are planned to increase the density of drilling in the main mineralized zone. Ongoing detailed structural and geological interpretation of the meta-volcanic stratigraphy and structures is in progress to obtain a better understanding of the controls on the distribution of mineralization (particularly the higher gold grades) and to thus correlate the intersections to enable follow-up drill hole planning, and subsequent modeling and resource evaluation of the deposit.

Table 1: Tembo Project, Ngula 1 Target, New Drill Results as of September
12, 2012

----------------------------------------------------------------------------
                                       Width (m)   Au g/t Width (m)   Au g/t
                           Width             greater than       greater than
BH ID         From     To    (m) Au g/t    0.50g/t Cutoff     2.00g/t Cutoff
----------------------------------------------------------------------------
TDD0014      85.15  85.50   0.35   0.28
             85.50  86.00   0.50   0.44
             86.00  86.50   0.50   0.07
             86.50  87.00   0.50   0.24     3.35     1.26
             87.00  87.50   0.50   0.49
                                                         -------------------
             87.50  88.00   0.50   3.14                        1.00     3.50
             88.00  88.50   0.50   3.86
           -----------------------------------------------------------------
            312.87 313.28   0.41   1.30     1.40     1.29
            313.28 313.78   0.50   1.00
            313.78 314.27   0.49   1.59
----------------------------------------------------------------------------
TDD0015     220.28 220.64   0.36   0.74
----------------------------------------------------------------------------
TDD0054(i)   73.00  74.00   1.00   1.83     2.00     1.23
             74.00  75.00   1.00   0.63
           -----------------------------------------------------------------
            108.61 109.34   0.73   0.89
           -----------------------------------------------------------------
            116.95 117.93   0.98   1.68    11.05     8.17
                                                         -------------------
            117.93 118.93   1.00   8.71                       10.07     8.81
            118.93 119.31   0.38  11.00
            119.31 120.13   0.82  18.90
            120.13 120.98   0.85   1.87
            120.98 121.92   0.94   1.08
            121.92 122.38   0.46   5.94
            122.38 123.38   1.00  28.80
            123.38 124.28   0.90   2.81
            124.28 125.08   0.80   6.93
            125.08 125.95   0.87   8.99
            125.95 126.29   0.34   0.08
            126.29 127.17   0.88   0.03
            127.17 128.00   0.83  12.30
           -----------------------------------------------------------------
            132.00 133.00   1.00   7.00     2.02     3.74      1.00     7.00
                                                         -------------------
            133.02 134.04   1.02   0.55
           -----------------------------------------------------------------
            139.00 140.00   1.00   2.88     3.00     2.43      2.00     3.19
            140.00 141.00   1.00   3.49
                                                         -------------------
            141.00 142.00   1.00   0.92
           -----------------------------------------------------------------
            145.13 145.90   0.77   0.71
           -----------------------------------------------------------------
            148.94 149.93   0.99   0.79     7.35     1.82
                                                         -------------------
            149.93 150.93   1.00   4.52                        2.00     4.53
            150.93 151.93   1.00   4.54
                                                         -------------------
            151.93 152.93   1.00   0.08
            152.93 153.93   1.00   0.69
            153.93 154.50   0.57   0.62
            154.50 155.34   0.84   0.50
                                                         -------------------
            155.34 156.29   0.95   2.10                        0.95     2.10
           -----------------------------------------------------------------
            269.00 270.00   1.00   1.84
----------------------------------------------------------------------------
TDD0059      91.38  92.38   1.00   0.74
           -----------------------------------------------------------------
            142.33 142.97   0.64   5.93                        0.64     5.93
           -----------------------------------------------------------------
            210.40 211.28   0.88   0.52     2.62     0.71
            211.28 212.28   1.00   0.92
            212.28 213.02   0.74   0.65
           -----------------------------------------------------------------
            219.31 220.05   0.74   0.56
           -----------------------------------------------------------------
            222.70 223.67   0.97   0.53
           -----------------------------------------------------------------
            260.00 261.00   1.00   1.44
           -----------------------------------------------------------------
            310.00 310.99   0.99   0.71     1.60     1.86
                                                         -------------------
            310.99 311.60   0.61   3.72                        0.61     3.72
----------------------------------------------------------------------------
TDD0060     285.41 286.02   0.61   0.56     1.16     1.00
            286.02 286.57   0.55   1.48
----------------------------------------------------------------------------
TDD0099     260.00 261.00   1.00   1.33     1.56     1.20
            261.00 261.56   0.56   0.96
           -----------------------------------------------------------------
            292.00 293.00   1.00   0.65     1.41     0.62
            293.00 293.41   0.41   0.54
----------------------------------------------------------------------------
TDD0106      79.16  79.88   0.72   1.11
           -----------------------------------------------------------------
            268.21 269.19   0.98   1.14     2.44     0.81
            269.19 270.19   1.00   0.42
            270.19 270.65   0.46   0.97
           -----------------------------------------------------------------
            282.01 282.95   0.94   1.01
           -----------------------------------------------------------------
            285.42 285.76   0.34   2.80     2.77     5.09      0.34     2.80
                                                         -------------------
            285.76 286.26   0.50   0.01
                                                         -------------------
            286.26 287.24   0.98  11.70                        0.98    11.70
                                                         -------------------
            287.24 288.19   0.95   1.75
----------------------------------------------------------------------------
TDD0110      95.00  96.00   1.00   3.17                        1.00     3.17
           -----------------------------------------------------------------
            146.00 147.00   1.00   0.56
           -----------------------------------------------------------------
            195.00 196.00   1.00   0.78     5.00     4.22
                                                         -------------------
            196.00 197.00   1.00   2.97
            197.00 198.00   1.00   8.39                        3.00     6.58
            198.00 199.00   1.00   8.37
                                                         -------------------
            199.00 200.00   1.00   0.59
----------------------------------------------------------------------------
TDD0125      12.06  12.50   0.44   2.72                        0.44     2.72
           -----------------------------------------------------------------
             24.50  25.00   0.50   2.35                        0.50     2.35
           -----------------------------------------------------------------
             35.16  35.82   0.66  26.40     0.94    19.03      0.66    26.40
             35.82  36.10   0.28   1.67
           -----------------------------------------------------------------
             94.75  95.00   0.25   1.45
           -----------------------------------------------------------------
            107.87 108.10   0.23   2.58                        0.23     2.58
           -----------------------------------------------------------------
            132.00 133.00   1.00   1.17     2.21     1.05
            133.00 133.45   0.45   0.30
            133.45 133.80   0.35   1.05
            133.80 134.21   0.41   1.58
           -----------------------------------------------------------------
            148.30 149.30   1.00   1.17     1.57     0.98
            149.30 149.87   0.57   0.64
           -----------------------------------------------------------------
            206.27 207.00   0.73   0.79     5.23     1.77
            207.00 207.50   0.50   1.23
            207.50 208.00   0.50   1.11
                                                         -------------------
            208.00 208.50   0.50   2.94                        1.14     5.90
            208.50 209.14   0.64   8.21
                                                         -------------------
            209.14 210.00   0.86   0.25
            210.00 211.05   1.05   0.17
            211.05 211.50   0.45   0.87
           -----------------------------------------------------------------
            220.78 221.25   0.47   0.91
           -----------------------------------------------------------------
            222.23 223.00   0.77   2.42                        0.77     2.42
----------------------------------------------------------------------------
TDD0126      25.00  25.50   0.50   1.51     6.46     1.80
             25.50  26.11   0.61   1.72
                                                         -------------------
             26.11  26.50   0.39   4.16                        0.39     4.16
                                                         -------------------
             26.50  26.99   0.49   0.31
             26.99  27.40   0.41   0.57
             27.40  27.70   0.30   1.86
                                                         -------------------
             27.70  28.00   0.30   4.08                        0.30     4.08
                                                         -------------------
             28.00  28.50   0.50   0.24
             28.50  29.00   0.50   0.73
             29.00  29.50   0.50   0.16
                                                         -------------------
             29.50  30.00   0.50   7.35                        0.50     7.35
                                                         -------------------
             30.00  30.50   0.50   1.24
             30.50  31.00   0.50   1.41
             31.00  31.46   0.46   1.06
           -----------------------------------------------------------------
             53.90  54.15   0.25   0.94
           -----------------------------------------------------------------
             76.90  77.20   0.30   0.49     0.60     0.90
             77.20  77.50   0.30   1.30
           -----------------------------------------------------------------
            104.82 105.35   0.53   1.25     2.90     1.38
            105.35 105.95   0.60   2.00                        0.60     2.00
            105.95 106.35   0.40   1.88
            106.35 106.70   0.35   2.28                        0.35     2.28
            106.70 107.20   0.50   0.43
            107.20 107.72   0.52   0.72
           -----------------------------------------------------------------
            143.05 143.40   0.35   1.27
           -----------------------------------------------------------------
            167.80 168.22   0.42   1.91     2.20     1.89
                                                         -------------------
            168.22 168.75   0.53   2.14                        1.00     2.54
            168.75 169.22   0.47   2.99
                                                         -------------------
            169.22 170.00   0.78   1.04
           -----------------------------------------------------------------
            204.65 205.15   0.50   1.02
           -----------------------------------------------------------------
            239.08 239.55   0.47   3.47                        0.47     3.47
           -----------------------------------------------------------------
            281.53 281.87   0.34   0.65
----------------------------------------------------------------------------
TDD0136     104.00 105.00   1.00   0.99
                                                         -------------------
            120.00 121.00   1.00   2.48                        1.00     2.48
                                       -------------------------------------
            141.50 142.50   1.00   0.52     3.50     1.61
            142.50 143.00   0.50   1.29
            143.00 143.50   0.50   0.37
            143.50 144.00   0.50   0.75
                                                         -------------------
            144.00 145.00   1.00   3.91                        1.00     3.91
           -----------------------------------------------------------------
            147.00 148.00   1.00   0.88
           -----------------------------------------------------------------
            258.00 259.00   1.00   0.60     2.00     0.95
            259.00 260.00   1.00   1.29
           -----------------------------------------------------------------
            266.50 267.50   1.00   0.53
----------------------------------------------------------------------------
TRC0020     104.00 105.00   1.00   0.51
           -----------------------------------------------------------------
            107.00 108.00   1.00   2.11     4.00     1.11      1.00     2.11
                                                         -------------------
            108.00 109.00   1.00   0.32
            109.00 110.00   1.00   0.93
            110.00 111.00   1.00   1.06
           -----------------------------------------------------------------
            120.00 121.00   1.00   0.60     3.00     0.74
            121.00 122.00   1.00   0.63
            122.00 123.00   1.00   1.00
----------------------------------------------------------------------------
TRC0042     123.00 124.00   1.00   0.62
----------------------------------------------------------------------------
TRC0047      62.00  63.00   1.00   0.62
----------------------------------------------------------------------------
TRC0052      77.00  78.00   1.00   0.56     4.00     0.79
             78.00  79.00   1.00   1.46
             79.00  80.00   1.00   0.69
             80.00  81.00   1.00   0.44
           -----------------------------------------------------------------
             90.00  91.00   1.00   1.05
           -----------------------------------------------------------------
             96.00  97.00   1.00   0.62
           -----------------------------------------------------------------
             98.00  99.00   1.00   0.60
           -----------------------------------------------------------------
            129.00 130.00   1.00   0.50
           -----------------------------------------------------------------
            158.00 159.00   1.00   0.79
           -----------------------------------------------------------------
TRC0513      61.00  62.00   1.00   2.10     2.00     1.64      1.00     2.10
                                                         -------------------
             62.00  63.00   1.00   1.18
----------------------------------------------------------------------------
(i) TDD0054 results from 73m to 75m, 108m to 126m and from 269m to 270m
previously released on June 29th, 2012
Note: True widths are not known at this time


Table 2: Tembo Project, Ngula 1 Target, UTM Coordinates
Hole_ID       Easting   Northing  Elevation    Azimuth  CollarDip        Eoh
TDD0014        436900    9647615       1241          0        -60        321
TDD0015        436700    9647585       1244          0        -60      305.1
TDD0054        436500    9647325       1246        180        -60     300.12
TDD0059        436400    9647325       1247        180        -60     350.68
TDD0060        436300    9647325       1246        180        -60        303
TDD0099        436598    9647325       1245        180        -60     317.68
TDD0106        436550    9647324       1246        180        -60        300
TDD0110        436800    9647365       1241        180        -60       34.5
TDD0125        436800    9647265       1241        180        -60     431.68
TDD0126        436650    9647155       1246          0        -60     300.58
TDD0136        436500    9647300       1246        180        -60        300
TRC0020        437000    9647245       1236          0        -60        150
TRC0042        436600    9647605       1246          0        -60        300
TRC0047        436400    9647565       1247          0        -60        150
TRC0052        436602    9647327       1245        180        -60        200

QA/QC

A stringent QA/QC practice is being applied to all sample batches. A Verified Reference Material standard is inserted every 20th sample, a known blank or blank standard every 20th sample and all samples with assays greater than 0.5 g/t Au are re-assayed. 1% of all samples are submitted to an alternative laboratory for check analysis. In addition the laboratory adheres to an internal QA/QC procedure including standard samples and repeats and blanks inserted independently.

The above information has been prepared under the supervision of David Scott, Pr. Sci. Nat., who is designated as a "Qualified Person" with the ability and authority to verify the authenticity and validity of the data.

About Tembo Gold Corp.

Tembo Gold (TSX VENTURE: TEM) is a Canadian publicly listed mineral exploration company focused on the exploration and development of gold projects in Tanzania and the rest of Africa. The Company currently has 100% interest in the Tembo Gold Project that is located adjacent to African Barrick's 20Moz Bulyanhulu Mine in the prolific Lake Victoria Greenstone belt in Tanzania. The company is led by a highly experienced team with a proven history of developing, financing, and operating mining projects in Africa. The company has commenced its 90,000m drill program on its Tembo Gold Project.

On Behalf of the Board of Directors of Tembo, David Scott, President & CEO

Forward-Looking Statements

Certain information set out in this news release constitutes forward-looking information. Forward looking statements are often, but not always, identified by the use of words such as "seek", "anticipate", "plan", "continue", "estimate", "expect", "may", "will", "intend", "could", "might", "should", "believe" and similar expressions. In particular, this news release contains forward-looking statements in respect of the use of the net proceeds from the Private Placement, the completion and timing of additional closings of the Non-Brokered Private Placement, the payment of certain finders' fees and the listing of the Common Shares on the TSXV. Forward-looking statements are based upon the opinions and expectations of management of the Company as at the effective date of such statements and, in certain cases, information provided or disseminated by third parties. Although the Company believes that the expectations reflected in such forward-looking statements are based upon reasonable assumptions, and that information obtained from third party sources is reliable, they can give no assurance that those expectations will prove to have been correct. With respect to forward-looking statements contained in this news release, the Company has made assumptions regarding, among other things, the ability to develop the Company's properties, the economic climate in the jurisdictions where the Company carries on operations and commodity prices. Although the Company believes that the expectations reflected in the forward-looking statements contained in this document, and the assumptions on which such forward-looking statements are made, are reasonable, there can be no assurance that such expectations will prove to be correct. Readers are cautioned not to place undue reliance on forward-looking statements included in this document, as there can be no assurance that the plans, intentions or expectations upon which the forward-looking statements are based will occur. By their nature, forward-looking statements involve numerous assumptions, known and unknown risks and uncertainties that contribute to the possibility that the predictions, forecasts, projections and other forward-looking statements will not occur, which may cause actual results in future periods to differ materially from any estimates or projections of future performance or results expressed or implied by such forward-looking statements. These risks and uncertainties include, among other things, a significant drop in the price of gold, political turmoil in Tanzania and other risk factors set forth in the Company's continuous disclosure. Readers are cautioned that this list of risk factors should not be construed as exhaustive. These statements are made as at the date hereof and unless otherwise required by law, the Company does not intend, or assume any obligation, to update these forward-looking statements.

NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS THAT TERM IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS NEWS RELEASE.

Contacts:
Tembo Gold Corp.
Marc Cernovitch
Director & VP Business Development
416.619.9010
mcernovitch@tembogold.com
www.tembogold.com

Großer Insider-Report 2024 von Dr. Dennis Riedl
Wenn Insider handeln, sollten Sie aufmerksam werden. In diesem kostenlosen Report erfahren Sie, welche Aktien Sie im Moment im Blick behalten und von welchen Sie lieber die Finger lassen sollten.
Hier klicken
© 2012 Marketwired
Werbehinweise: Die Billigung des Basisprospekts durch die BaFin ist nicht als ihre Befürwortung der angebotenen Wertpapiere zu verstehen. Wir empfehlen Interessenten und potenziellen Anlegern den Basisprospekt und die Endgültigen Bedingungen zu lesen, bevor sie eine Anlageentscheidung treffen, um sich möglichst umfassend zu informieren, insbesondere über die potenziellen Risiken und Chancen des Wertpapiers. Sie sind im Begriff, ein Produkt zu erwerben, das nicht einfach ist und schwer zu verstehen sein kann.