Anzeige
Mehr »
Login
Dienstag, 16.04.2024 Börsentäglich über 12.000 News von 689 internationalen Medien
Biotech-Perle kurz vor entscheidender Meilenstein-Meldung!
Anzeige

Indizes

Kurs

%
News
24 h / 7 T
Aufrufe
7 Tage

Aktien

Kurs

%
News
24 h / 7 T
Aufrufe
7 Tage

Xetra-Orderbuch

Fonds

Kurs

%

Devisen

Kurs

%

Rohstoffe

Kurs

%

Themen

Kurs

%

Erweiterte Suche
Marketwired
133 Leser
Artikel bewerten:
(0)

Teranga Gold Reports Second Round of Positive Drill Results at Sabodala Mine

TORONTO, ONTARIO -- (Marketwired) -- 04/03/17 -- Teranga Gold Corporation ("Teranga" or the "Company") (TSX: TGZ)(ASX: TGZ) is pleased to announce the second round of results from its ongoing 115-hole drill program at its Niakafiri deposit, situated within 5 kilometres of the mill on the Company's Sabodala mine license in Senegal, West Africa.

HIGHLIGHTS

--  Drill results from the first 60 holes at the Company's Niakafiri deposit
    extend the mineralisation along strike and at depth, providing potential
    for re-optimization of the life of mine plan.

--  Positive drilling success in the Niakafiri Main zone includes the
    following highlight intervals from the 33 holes released today
    representing some of the widest mineralised intervals encountered within
    the Niakafiri deposit to date:

    --  4.18 g/t Au over 23 metres including 6.52 g/t Au over 12 metres in
        MDD17-279
    --  2.99 g/t Au over 33 metres including 4.23 g/t Au over 17 metres in
        MDD17-277
    --  2.41 g/t Au over 29 metres including 6.51 g/t Au over 6 metres in
        MDD17-281
    --  3.19 g/t Au over 21 metres at the end-of-hole in MDD17-284

--  Results from the first 27 holes were released February 27, 2017 and
    include:

    --  6.90 g/t Au over 8 metres including 45.5 g/t Au over 1 metre in
        MDD17-242
    --  2.45 g/t Au over 17 metres including 3.25 g/t Au over 11 metres in
        MDD16-235
    --  1.89 g/t Au over 12 metres including 5.25 g/t Au over 3 metres in
        MDD17-239

"The drill results confirm our belief that there is considerable opportunity to extend the mineralisation both along strike and to depth at Niakafiri," said Paul Chawrun, Chief Operating Officer of Teranga. "These encouraging results could result in the re-sequencing of Niakafiri in the current mine plan, filling in the production gaps at Sabodala to extend the life of open pit mining and to defer the start of underground mining."

"We are very pleased with our most recent results, which represent some of the widest mineralised intervals encountered within the Niakafiri deposit to date," stated David Mallo, Vice President Exploration of Teranga. "Our drill program at Niakafiri will continue to focus on extending the mineralisation along trend and to-depth."

Since re-initiation of this program with one (1) drill in late 2016, the Company has increased the number of drills to four (4). The current phase of the Niakafiri drill program, 115 proposed core holes totaling 12,000 metres, is ongoing at both the eastern and western components of the Niakafiri deposit (see Figure 2 in Appendix 1). Drill results received to date will be included in a mid-year resource and reserve update. The balance of the current year program will be included in a year-end resource and reserve update.

The majority of the Niakafiri deposits were delineated at the inception of the Sabodala project in 2009 and they represent a combined measured and indicated resource of approximately 600,000 ounces, an inferred resource of approximately 220,000 ounces and reserves of over 300,000 ounces((1)) included within the total resource estimate (see Tables 1A and 1B in Appendix 1). The Niakafiri deposits are within 5 kilometres of the Sabodala mill (see Figure 1 in Appendix 1).

Niakafiri East

The results received to date from the eastern portion of the Niakafiri deposit drilling (see Figure 2 in Appendix 1) are encouraging. They fill in gaps between previously outlined resource pit shells, extend mineralisation up-dip in a number of areas of the deposit and fill in previous widely spaced drill intersections.

In addition, there have been positive results from a set of drill holes targeting the down-dip depth extent of the existing reserve and resource pit shells in the central portion of Niakafiri Main (Table 1 on the next page highlights many of these results). These deep mineralised intersections extend as far as downhole to 270 metres (approximately 200 metres below surface), and are the deepest intersected at Niakafiri Main to date, with mineralisation remaining open at depth. Examples of this down-dip drilling success in central Niakafiri Main are shown in two representative drill sections as Figures 3 and 4 in Appendix 1.

The most advanced portion of Niakafiri is the eastern component - Niakafiri Main, Niakafiri Southeast and Dinkokono - where the first phase of planned drill holes is now complete. A second phase drill program will follow-up on these successful initial drill results focusing primarily in the vicinity of the wider mineralised intervals in the central portion of Niakafiri Main.

Niakafiri West

In addition to the ongoing drill program on Niakafiri East, drilling has begun on the western component of the resource - Niakafiri West and Soukhoto. The objectives at Niakafiri West are to upgrade the resource categories from inferred to indicated, and potentially to fill in the current gap of approximately 1.5 kilometres extending northwards towards known mineralisation at Soukhoto. An additional phase of drilling will be undertaken based on interpretation of the results from the current program.

Pending further favourable results at Niakafiri, the Company expects to evaluate the impact on pit sequencing in the life of mine plan and the timing of village relocation.

Table 1: Niakafiri Drilling Highlights(i)

A listing of the more favourable Niakafiri deposit drill hole intersections, being reported in this news release, is outlined in the following table. A complete listing of all the significant intersections for the 33 new drill results is included in Table 2 in Appendix 1. A complete listing of all significant results from the first 60 holes of the Company's extensive drilling program at the Niakafiri deposit is available at www.terangagold.com.

----------------------------------------------------------------------------
                                                              Core
                                                   Interval  Length   Grade
                                                     (m)       (m)  (g/t Au)

Hole #        Northing Easting Azimuth Dip        From   To
----------------------------------------------------------------------------
MDD17-259      1455548  813092   112   -51        138   147     9     1.48
----------------------------------------------------------------------------
                                           incl.  138   141     3     2.67
----------------------------------------------------------------------------
MDD17-264      1455068  812960   113   -48         28    42    14     1.24
----------------------------------------------------------------------------
                                           incl.   36    41     5     2.20
----------------------------------------------------------------------------
MDD17-272      1456423  813277   111   -49         30    42    12     1.74
----------------------------------------------------------------------------
                                           incl.   36    41     5     2.67
----------------------------------------------------------------------------
MDD17-274(ii)  1456500  813302   110   -58         30    42    12     1.86
----------------------------------------------------------------------------
                                           incl.   36    42     6     2.76
----------------------------------------------------------------------------
                                                   44    51     7     1.86
----------------------------------------------------------------------------
                                           incl.   45    48     3     3.61
----------------------------------------------------------------------------
                                                   55    64     9     2.23
----------------------------------------------------------------------------
                                           incl.   60    63     3     4.06
----------------------------------------------------------------------------
                                                  105   110+   5+     2.16
----------------------------------------------------------------------------
                                           incl.  108   110+   2+     3.04
----------------------------------------------------------------------------
MDD17-275      1456460  813293   111   -58         6     16    10     1.53
----------------------------------------------------------------------------
                                           incl.   11    13     2     4.34
----------------------------------------------------------------------------
MDD17-276      1456654  813184   112   -49        187   212    25     1.97
----------------------------------------------------------------------------
                                           incl.  195   197     2     4.38
----------------------------------------------------------------------------
                                            and   205   209     4     3.25
----------------------------------------------------------------------------
MDD17-277      1456691  813203   109   -58        167   189    22     1.45
----------------------------------------------------------------------------
                                           incl.  175   179     4     2.99
----------------------------------------------------------------------------
                                                  213   246    33     2.99
----------------------------------------------------------------------------
                                           incl.  226   243    17     4.23
----------------------------------------------------------------------------
MDD17-278      1456729  813215   111   -62        258   276    18     4.21
----------------------------------------------------------------------------
                                           incl.  260   265     5     5.99
----------------------------------------------------------------------------
                                            and   267   270     3     6.71
----------------------------------------------------------------------------
MDD17-279      1456798  813267   113   -66        129   168    39     2.27
----------------------------------------------------------------------------
                                           incl.  135   141     6     3.98
----------------------------------------------------------------------------
                                                  186   207    21     2.99
----------------------------------------------------------------------------
                                           incl.  198   206     8     3.97
----------------------------------------------------------------------------
                                                  210   233    23     4.18
----------------------------------------------------------------------------
                                           incl.  211   223    12     6.52
----------------------------------------------------------------------------
MDD17-280      1456654  813184   112   -57        216   238    22     2.28
----------------------------------------------------------------------------
                                           incl.  229   232     3     5.44
----------------------------------------------------------------------------
                                                  265   270     5     2.28
----------------------------------------------------------------------------
MDD17-281      1456799  813267    86   -62        145   174    29     2.41
----------------------------------------------------------------------------
                                           incl.  163   169     6     6.51
----------------------------------------------------------------------------
MDD17-282      1456708  812536   112   -59         4     9      5     3.41
----------------------------------------------------------------------------
MDD17-284
 (ii)          1456744  813248    98   -68        109    11     2     20.5
----------------------------------------------------------------------------
                                                  149   162    13     1.50
----------------------------------------------------------------------------
                                                  186   193     7     1.58
----------------------------------------------------------------------------
                                                  255   276+   21+    3.19
----------------------------------------------------------------------------

(i)Intervals calculated using a 0.4 g/t Au cut-off and 2 metres maximum internal dilution. True widths are unknown and intercept gold values are determined from uncapped assays. UTM Coordinates are WGS84 30N.

(ii) Drill hole ends in mineralisation.

Endnotes

(1) Proven and Probable reserves of 8.95 Mt at 1.09 g/t for 314 Koz (see Table 1A in Appendix 1).

Competent Persons Statements

The technical information contained in this document relating to the open pit mineral reserve estimates is based on, and fairly represents, information compiled by Mr. William Paul Chawrun, P. Eng who is a member of the Professional Engineers Ontario, which is currently included as a "Recognized Overseas Professional Organization" in a list promulgated by the ASX from time to time. Mr. Chawrun is a full time employee of Teranga and is not "independent" within the meaning of National Instrument 43-101. However, he is a "Qualified Person" as defined in NI 43-101. Mr. Chawrun has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the "Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves". Mr. Chawrun is a "Qualified Person" under National Instrument 43-101 Standards of Disclosure for Mineral Projects. Mr. Chawrun has consented to the inclusion in this Report of the matters based on his compiled information in the form and context in which it appears in this Report.

The technical information contained in this Report relating to mineral resource estimates for Niakafiri is based on, and fairly represents, information compiled by Ms. Patti Nakai-Lajoie. Ms. Nakai-Lajoie, P. Geo., is a Member of the Association of Professional Geoscientists of Ontario, which is currently included as a "Recognized Overseas Professional Organization" in a list promulgated by the ASX from time to time. Ms. Nakai-Lajoie is a full time employee of Teranga and is not "independent" within the meaning of National Instrument 43-101. Ms. Nakai- Lajoie has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which she is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the "Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves". Ms. Nakai-Lajoie is a "Qualified Person" under National Instrument 43-101 Standards of Disclosure for Mineral Projects. Ms. Nakai-Lajoie has consented to the inclusion in this Report of the matters based on her compiled information in the form and context in which it appears in this Report.

Teranga's exploration programs are being managed by Peter Mann, FAusIMM. Mr. Mann is a full time employee of Teranga and is not "independent" within the meaning of National Instrument 43-101. Mr. Mann has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the "Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves". Mr. Mann is a "Qualified Person" under National Instrument 43-101 Standards of Disclosure for Mineral Projects. The technical information contained in this news release relating exploration results are based on, and fairly represents, information compiled by Mr. Mann. Mr. Mann has verified and approved the data disclosed in this release, including the sampling, analytical and test data underlying the information. The RC samples are prepared at site and assayed in the SGS laboratory located at the site. Analysis for diamond drilling is sent for fire assay analysis at ALS Johannesburg, South Africa. Mr. Mann has consented to the inclusion in this news release of the matters based on his compiled information in the form and context in which it appears herein.

Teranga's disclosure of mineral reserve and mineral resource information is governed by NI 43-101 under the guidelines set out in the Canadian Institute of Mining, Metallurgy and Petroleum (the "CIM") Standards on Mineral Resources and Mineral Reserves, adopted by the CIM Council, as may be amended from time to time by the CIM ("CIM Standards"). CIM definitions of the terms "mineral reserve", "proven mineral reserve", "probable mineral reserve", "mineral resource", "measured mineral resource", "indicated mineral resource" and "inferred mineral resource", are substantially similar to the JORC Code corresponding definitions of the terms "ore reserve", "proved ore reserve", "probable ore reserve", "mineral resource", "measured mineral resource", "indicated mineral resource" and "inferred mineral resource", respectively. Estimates of mineral resources and mineral reserves prepared in accordance with the JORC Code would not be materially different if prepared in accordance with the CIM definitions applicable under NI 43-101. There can be no assurance that those portions of mineral resources that are not mineral reserves will ultimately be converted into mineral reserves.

Forward-Looking Statements

This press release contains certain statements that constitute forward-looking information within the meaning of applicable securities laws ("forward-looking statements"), which reflects management's expectations regarding Teranga's future growth, results of operations (including, without limitation, future production and capital expenditures), performance (both operational and financial) and business prospects (including the timing and development of new deposits and the success of exploration activities) and opportunities. Wherever possible, words such as "potential", "belief", "believe", "expects", "potential" or "potentially", "estimates", "estimated", "plans", trends", "anticipated", "ability" and similar expressions or statements that certain actions, events or results "could", "should", "would", or "will" have been used to identify such forward looking information. Forward-looking statements include, without limitation, all disclosure regarding possible events, conditions or results of operations, future economic conditions and anticipated courses of action. Although the forward-looking statements contained in this press release reflect management's current beliefs based upon information currently available to management and based upon what management believes to be reasonable assumptions, Teranga cannot be certain that actual results will be consistent with such forward looking statements. Such forward-looking statements are based upon assumptions, opinions and analysis made by management in light of its experience, current conditions and its expectations of future developments that management believe to be reasonable and relevant but that may prove to be incorrect. These assumptions include, among other things, the ability to obtain any requisite governmental approvals, the accuracy of mineral reserve and mineral resource estimates, gold price, exchange rates, fuel and energy costs, future economic conditions, the ability to resettle the community within anticipated timeline, anticipated future estimates of free cash flow, and courses of action. Teranga cautions you not to place undue reliance upon any such forward-looking statements.

The risks and uncertainties that may affect forward-looking statements include, among others: the inherent risks involved in exploration and development of mineral properties, including government approvals and permitting, changes in economic conditions, changes in the worldwide price of gold and other key inputs, changes in mine plans and other factors, such as project execution delays, many of which are beyond the control of Teranga, as well as other risks and uncertainties which are more fully described in Teranga's Annual Information Form dated March 30, 2017, and in other filings of Teranga with securities and regulatory authorities which are available at www.sedar.com. Teranga does not undertake any obligation to update forward-looking statements should assumptions related to these plans, estimates, projections, beliefs and opinions change. Nothing in this report should be construed as either an offer to sell or a solicitation to buy or sell Teranga securities. All references to Teranga include its subsidiaries unless the context requires otherwise.

About Teranga

Teranga is a multi-jurisdictional West African gold company focused on production and development as well as the exploration of more than 5,000km(2) of land located on prospective gold belts.

Since its initial public offering in 2010, Teranga has produced more than 1.2 million ounces of gold from its operations in Senegal. Following its recent acquisition of Gryphon Minerals, the Company is fast-tracking the completion of a feasibility study for the Banfora Project. Concurrent with its production and development activities, exploration programs are underway to seek to increase the Company's reserve base through resource conversion and making new discoveries. Teranga has a strong balance sheet and the financial flexibility to continue to grow its business.

Steadfast in its commitment to set the benchmark for responsible mining, Teranga operates in accordance with the highest international standards and aims to act as a catalyst for sustainable economic, environmental, and community development as it strives to create value for all of its stakeholders. Teranga is a member of the United Nations Global Compact and a leading member of the multi-stakeholder group responsible for the submission of the first Senegalese Extractive Industries Transparency Initiative revenue report. The Company's 2015 responsibility report, which is available at www.terangagold.com/2015responsibilityreport, is prepared in accordance with its commitments under the United Nations Global Compact and in alignment with the Global Reporting Initiative guidelines.

APPENDIX 1

To view Figure 1: Map of Sabodala Mine License please visit the following link: http://media3.marketwire.com/docs/1090765_Figure-1.jpg

To view Figure 2: Plan Map - Niakafiri Drilling Area please visit the following link: http://media3.marketwire.com/docs/1090765_Figure-2.jpg

To view Figure 3: Representative Drill Section - Niakafiri Main NNE Section 440 N please visit the following link: http://media3.marketwire.com/docs/1090765_Figure-3.jpg

The 2017 drill holes targeted potential mineralisation extensions below the current resource and reserve pit outlines. As demonstrated, MDD17-0277 has successfully intersected very good grades over extensive widths, as targeted.

To view Figure 4: Representative Drill Section - Niakafiri Main: Section 560 N please visit the following link: http://media3.marketwire.com/docs/1090765_Figure-4.jpg

The 2017 drill holes targeted potential mineralisation extensions below the current resource and reserve pit outlines. As demonstrated, MDD17-0279 has successfully intersected very good grades over extensive widths, as targeted.

Table 1A: Current Niakafiri Open Pit and Underground Mineral Reserves
 Summary (as of December 31, 2015)

----------------------------------------------------------------------------
                     Proven              Probable        Proven and Probable
             ---------------------------------------------------------------
Deposits      Tonnes  Grade   Au  Tonnes   Grade    Au   Tonnes  Grade   Au
               (Mt)   (g/t) (Koz)  (Mt)    (g/t)   (Koz)  (Mt)   (g/t) (Koz)
----------------------------------------------------------------------------
Niakafiri
 Main          4.06   1.23   161   3.41    0.94     103   7.47   1.10   264
Niakafiri SE   0.00   0.00    0    1.12    1.09     39    1.12   1.09    39
Niakafiri SW   0.00   0.00    0    0.37    0.92     11    0.37   0.92    11
----------------------------------------------------------------------------
----------------------------------------------------------------------------
        Total  4.06   1.23   161   4.89    0.97     153   8.95   1.09   314
----------------------------------------------------------------------------

Notes for Mineral Reserves Summary

1.  CIM definitions were followed for Mineral Reserves.
2.  Mineral Reserve cut off grades range from 0.35 g/t to 0.63 g/t Au for
    oxide and 0.42 g/t to 0.73 g/t Au for fresh based on a $1,100/oz gold
    price
3.  Sum of individual amounts may not equal due to rounding.
4.  The Niakafiri Main deposit is adjacent to the Sabodala village and
    relocation of at least some portion of the village will be required,
    which will necessitate a negotiated resettlement program with the
    affected community members.

There have been no material changes made to these mineral reserve estimates since December 31, 2015, except for the depletion of reserves due to production over 2016. All material assumptions and technical parameters previously disclosed continue to be applicable. The Company plans to update its mineral reserve and resource estimates in 2017.

Table 1B: Current Niakafiri Open Pit and Underground Mineral Resources
 Summary (as of December 31, 2015)

----------------------------------------------------------------------------
                                  Measured                  Indicated
                        ----------------------------------------------------
        Deposits          Tonnes   Grade      Au     Tonnes   Grade     Au
                           (Mt)    (g/t)    (Koz)     (Mt)    (g/t)   (Koz)
----------------------------------------------------------------------------
  Niakafiri   Open Pit     4.91     1.33     210      7.22     0.98    228
    Main     Underground
            ----------------------------------------------------------------
              Combined     4.91     1.33     210      7.22     0.98    228
----------------------------------------------------------------------------
  Niakafiri   Open Pit
    West     Underground
            ----------------------------------------------------------------
              Combined
----------------------------------------------------------------------------
  Niakafiri   Open Pit                                0.77     0.81     20
     SW      Underground
            ----------------------------------------------------------------
              Combined                                0.77     0.81     20
----------------------------------------------------------------------------
  Niakafiri   Open Pit                                4.44     0.98    140
     SE      Underground                              0.07     2.60     6
            ----------------------------------------------------------------
              Combined                                4.51     1.01    146
----------------------------------------------------------------------------
----------------------------------------------------------------------------
              Open Pit     4.91     1.33     210     12.43     0.97    388
    Total    Underground                              0.07     2.60     6
            ----------------------------------------------------------------
              Combined     4.91     1.33     210     12.50     0.98    394
----------------------------------------------------------------------------


Table 1B: Current Niakafiri Open Pit and Underground Mineral Resources
 Summary (as of December 31, 2015)

----------------------------------------------------------------------------
                           Measured and Indicated            Inferred
                        ----------------------------------------------------
        Deposits          Tonnes   Grade      Au     Tonnes   Grade     Au
                           (Mt)    (g/t)    (Koz)     (Mt)    (g/t)   (Koz)
----------------------------------------------------------------------------
  Niakafiri   Open Pit    12.13     1.12     438      2.47     1.09     87
    Main     Underground                              0.18     2.51     15
            ----------------------------------------------------------------
              Combined    12.13     1.12     438      2.66     1.19    102
----------------------------------------------------------------------------
  Niakafiri   Open Pit                                2.57     1.29    107
    West     Underground                              0.09     2.82     8
            ----------------------------------------------------------------
              Combined                                2.66     1.34    115
----------------------------------------------------------------------------
  Niakafiri   Open Pit     0.77     0.81      20      0.03     0.67     1
     SW      Underground
            ----------------------------------------------------------------
              Combined     0.77     0.81      20      0.03     0.67     1
----------------------------------------------------------------------------
  Niakafiri   Open Pit     4.44     0.98     140      0.16     0.96     5
     SE      Underground   0.07     2.60      6       0.02     2.64     1
            ----------------------------------------------------------------
              Combined     4.51     1.01     146      0.18     1.11     6
----------------------------------------------------------------------------
----------------------------------------------------------------------------
              Open Pit    17.34     1.07     598      5.23     1.18    199
    Total    Underground   0.07     2.60      6       0.29     2.61     24
            ----------------------------------------------------------------
              Combined    17.41     1.08     604      5.52     1.26    223
----------------------------------------------------------------------------

Notes for Mineral Resources Summary

1.  CIM definitions were followed for Mineral Resources.
2.  Open pit oxide Mineral Resources are estimated at a cut-off grade of
    0.35 g/t Au
3.  Open pit transition and fresh rock Mineral Resources are estimated at a
    cut-off grade of 0.40 g/t Au
4.  Underground Mineral Resources are estimated at a cut-off grade of 2.00
    g/t Au.
5.  High grade assays were capped at grades ranging from 1.5 g/t Au to 110
    g/t Au.
6.  The figures above are "Total" Mineral Resources and include Mineral
    Reserves.
7.  Open pit shells were used to constrain open pit resources.
8.  Mineral Resources are estimated using a gold price of US$1,450 per
    ounce.
9.  Sum of individual amounts may not equal due to rounding.

There have been no material changes made to these mineral resource estimates since December 31, 2015, except for the depletion of reserves through production over 2016. All material assumptions and technical parameters previously disclosed continue to be applicable. The Company plans to update its mineral reserve and resource estimates in 2017.

Table 2: Summary of Most Recent Niakafiri Drilling Results (i)

----------------------------------------------------------------------------
                                                              Core
                                                   Interval  Length   Grade
                                                      (m)      (m)  (g/t Au)

Hole #        Northing Easting Azimuth Dip         From  To
----------------------------------------------------------------------------
MDD17-252      1456249  813321   111   -62          89   99    10     1.09
----------------------------------------------------------------------------
MDD17-253      1456324  813342   110   -61                             NSR
----------------------------------------------------------------------------
MDD17-256      1456363  813350   112   -56                             NSR
----------------------------------------------------------------------------
MDD17-257      1456069  813366   110   -48                             NSR
----------------------------------------------------------------------------
MDD17-258      1455521  813060   111   -53          30   33     3     2.16
----------------------------------------------------------------------------
                                                    38   42     4     1.28
----------------------------------------------------------------------------
                                            incl.   38   39     1     2.97
----------------------------------------------------------------------------
MDD17-259      1455548  813092   112   -51         138  147     9     1.48
----------------------------------------------------------------------------
                                            incl.  138  141     3     2.67
----------------------------------------------------------------------------
MDD17-260      1455568  813187   110   -49          55   58     3     1.07
----------------------------------------------------------------------------
MDD17-261      1455487  813192   110   -49          12   25    13     0.93
----------------------------------------------------------------------------
                                            incl.   15   16     1     2.54
----------------------------------------------------------------------------
MDD17-262      1455460  813119   111   -50          42   50     8     1.07
----------------------------------------------------------------------------
                                            incl.   44   46     2     2.40
----------------------------------------------------------------------------
                                                    90   97     7     0.87
----------------------------------------------------------------------------
                                            incl.   94   96     2     1.89
----------------------------------------------------------------------------
MDD17-263      1455446  813179   113   -54          0    8      8     1.04
----------------------------------------------------------------------------
                                            incl.   7    8      1     1.96
----------------------------------------------------------------------------
                                                    53   57     4     1.33
----------------------------------------------------------------------------
MDD17-264      1455068  812960   113   -48          28   42    14     1.24
----------------------------------------------------------------------------
                                            incl.   36   41     5     2.20
----------------------------------------------------------------------------
MDD17-265      1455514  813220   111   -48          8    10     2     1.16
----------------------------------------------------------------------------
MDD17-266      1454963  812930   112   -47          7    11     4     1.11
----------------------------------------------------------------------------
MDD17-267      1455440  813205   111   -46                             NSR
----------------------------------------------------------------------------
MDD17-268      1456754  812519   108   -57          45   48     3     1.65
----------------------------------------------------------------------------
MDD17-269      1456722  812482   111   -57          83   85     2     1.48
----------------------------------------------------------------------------
MDD17-270      1456104  813230   109   -65                             NSR
----------------------------------------------------------------------------
MDD17-271      1456382  813279   110   -55          88   90     2     1.79
----------------------------------------------------------------------------
                                                    98  100     2     1.22
----------------------------------------------------------------------------
                                                   114  116     2     1.24
----------------------------------------------------------------------------
MDD16-272      1456423  813277   111   -49          30   42    12     1.74
----------------------------------------------------------------------------
                                            incl.   36   41     5     2.67
----------------------------------------------------------------------------
                                                    87   94     7     0.89
----------------------------------------------------------------------------
                                            incl.   87   89     2     1.83
----------------------------------------------------------------------------
MDD17-273      1456449  813336   110   -58          2    7      5     1.36
----------------------------------------------------------------------------
                                                    15   17     2     1.07
----------------------------------------------------------------------------
                                                    43   49     6     1.66
----------------------------------------------------------------------------
MDD17-274
 (ii)          1456500  813302   110   -58          21   25     4     1.19
----------------------------------------------------------------------------
                                                    30   42    12     1.86
----------------------------------------------------------------------------
                                            incl.   36   42     6     2.76
----------------------------------------------------------------------------
                                                    44   51     7     1.86
----------------------------------------------------------------------------
                                            incl.   45   48     3     3.61
----------------------------------------------------------------------------
                                                    55   64     9     2.23
----------------------------------------------------------------------------
                                            incl.   60   63     3     4.06
----------------------------------------------------------------------------
                                                   105  110+   5+     2.16
----------------------------------------------------------------------------
                                            incl.  108  110+   2+     3.04
----------------------------------------------------------------------------
MDD17-275      1456460  813293   111   -58          6    16    10     1.53
----------------------------------------------------------------------------
MDD17-275      1456460  813293   111   -58  incl.   11   13     2     4.34
----------------------------------------------------------------------------
                                                    24   29     5     0.97
----------------------------------------------------------------------------
                                                    32   35     3     1.14
----------------------------------------------------------------------------
                                                    51   58     7     0.86
----------------------------------------------------------------------------
                                                    64   72     8     1.04
----------------------------------------------------------------------------
                                            incl.   67   69     2     2.32
----------------------------------------------------------------------------
                                                    75   78     3     1.42
----------------------------------------------------------------------------
                                                    98  102     4     1.15
----------------------------------------------------------------------------
                                                   132  134     2     1.63
----------------------------------------------------------------------------
                                                   143  148     5     1.26
----------------------------------------------------------------------------
MDD17-276      1456654  813184   112   -49          65   70     5     0.82
----------------------------------------------------------------------------
                                            incl.   69   70     1     2.19
----------------------------------------------------------------------------
                                                   173  182     9     1.25
----------------------------------------------------------------------------
                                            incl.  174  176     2     3.12
----------------------------------------------------------------------------
                                                   187  212    25     1.97
----------------------------------------------------------------------------
                                            incl.  195  197     2     4.38
----------------------------------------------------------------------------
                                             and   205  209     4     3.25
----------------------------------------------------------------------------
                                                   214  217     3     1.19
----------------------------------------------------------------------------
                                                   235  239     4     1.04
----------------------------------------------------------------------------
MDD17-277      1456691  813203   109   -58          48   49     1     2.10
----------------------------------------------------------------------------
                                                    53   55     2     1.82
----------------------------------------------------------------------------
                                                    67   68     1     4.04
----------------------------------------------------------------------------
                                                   160  166     6     1.08
----------------------------------------------------------------------------
                                                   167  189    22     1.45
----------------------------------------------------------------------------
                                            incl.  175  179     4     2.99
----------------------------------------------------------------------------
                                                   193  200     7     1.49
----------------------------------------------------------------------------
                                                   202  204     2     1.47
----------------------------------------------------------------------------
                                                   213  246    33     2.99
----------------------------------------------------------------------------
                                            incl.  226  243    17     4.23
----------------------------------------------------------------------------
                                                   251  255     4     1.28
----------------------------------------------------------------------------
MDD17-278      1456729  813215   111   -62          80   84     4     2.61
----------------------------------------------------------------------------
                                            incl.   80   81     1     8.20
----------------------------------------------------------------------------
                                                   167  169     2     1.40
----------------------------------------------------------------------------
                                                   172  175     3     0.97
----------------------------------------------------------------------------
                                                   195  199     4     1.66
----------------------------------------------------------------------------
                                                   232  237     5     2.39
----------------------------------------------------------------------------
                                                   258  279    18     4.21
----------------------------------------------------------------------------
                                            incl.  260  265     5     5.99
----------------------------------------------------------------------------
                                             and   267  270     3     6.71
----------------------------------------------------------------------------
MDD17-279
 (ii)          1456798  813267   113   -66         129  168    39     2.27
----------------------------------------------------------------------------
                                            incl.  135  141     6     3.98
----------------------------------------------------------------------------
                                                   186  207    21     2.99
----------------------------------------------------------------------------
                                            incl.  198  206     8     3.97
----------------------------------------------------------------------------
                                                   210  233    23     4.18
----------------------------------------------------------------------------
                                            incl.  211  223    12     6.52
----------------------------------------------------------------------------
                                                   239  240+   1+     4.19
----------------------------------------------------------------------------
MDD17-280      1456654  813184   112   -57          68   69     1     2.28
----------------------------------------------------------------------------
                                                    72   74     2     1.15
----------------------------------------------------------------------------
                                                   171  179     8     1.12
----------------------------------------------------------------------------
MDD17-280      1456654  813184   112   -57  incl.  176  179     3     2.31
----------------------------------------------------------------------------
                                                   190  198     8     1.00
----------------------------------------------------------------------------
                                                   199  204     5     1.05
----------------------------------------------------------------------------
                                                   216  238    22     2.28
----------------------------------------------------------------------------
                                            incl.  229  232     3     5.44
----------------------------------------------------------------------------
                                                   255  260     5     1.08
----------------------------------------------------------------------------
                                                   265  270     5     2.28
----------------------------------------------------------------------------
                                            incl.  269  270     1     7.78
----------------------------------------------------------------------------
                                                   276  277     1     7.93
----------------------------------------------------------------------------
MDD17-281      1456799  813267    86   -62          89   96     7     1.09
----------------------------------------------------------------------------
                                            incl.   89   91     2     2.18
----------------------------------------------------------------------------
                                                    95   96     1     1.45
----------------------------------------------------------------------------
                                                   145  174    29     2.41
----------------------------------------------------------------------------
                                            incl.  163  169     6     6.51
----------------------------------------------------------------------------
                                                   180  185     5     2.54
----------------------------------------------------------------------------
                                                   226  232     6     1.06
----------------------------------------------------------------------------
                                            incl.  231  232     1     3.08
----------------------------------------------------------------------------
                                                   234  235     1     2.32
----------------------------------------------------------------------------
MDD17-282      1456708  812536   112   -59          4    9      5     3.41
----------------------------------------------------------------------------
                                            incl.   5    6      1     9.67
----------------------------------------------------------------------------
                                                    65   67     2     1.25
----------------------------------------------------------------------------
                                                    78   79     1     3.02
----------------------------------------------------------------------------
MDD17-283      1456699  812571   112   -59          41   42     1     1.74
----------------------------------------------------------------------------
                                                    66   72     6     1.62
----------------------------------------------------------------------------
                                            incl.   71   72     1     4.10
----------------------------------------------------------------------------
                                                    79   86     7     1.19
----------------------------------------------------------------------------
                                            incl.   79   81     2     2.08
----------------------------------------------------------------------------
                                                   123  126     3     2.06
----------------------------------------------------------------------------
                                                   136  137     1     4.30
----------------------------------------------------------------------------
MDD17-284
 (ii)          1456744  813248    98   -68         109  112     3     13.8
----------------------------------------------------------------------------
                                            incl.  109  111     2     20.5
----------------------------------------------------------------------------
                                                   149  162    13     1.50
----------------------------------------------------------------------------
                                                   154  156     2     3.50
----------------------------------------------------------------------------
                                                   165  171     6     1.22
----------------------------------------------------------------------------
                                                   186  193     7     1.58
----------------------------------------------------------------------------
                                                   195  198     3     1.19
----------------------------------------------------------------------------
                                                   255  276+   21+    3.19
----------------------------------------------------------------------------
MDD17-285      1457013  813396   111   -52          7    26    19     1.23
----------------------------------------------------------------------------
                                            incl.   19   20     1     4.01
----------------------------------------------------------------------------
MDD17-286      1456689  812608   111   -59          25   26     1     1.16
----------------------------------------------------------------------------
                                                    29   30     1     1.96
----------------------------------------------------------------------------
                                                    66   69     3     1.23
----------------------------------------------------------------------------
                                                    72   73     1     1.82
----------------------------------------------------------------------------
                                                    77   78     1     5.95
----------------------------------------------------------------------------
                                                   112  123    11     1.38
----------------------------------------------------------------------------
                                            incl.  120  122     2     3.14
----------------------------------------------------------------------------
                                                   130  133     3     1.13
----------------------------------------------------------------------------

(i)Intervals calculated using a 0.4 g/t Au cut-off and 2 metres maximum internal dilution. True widths are unknown and intercept gold values are determined from uncapped assays. UTM Coordinates are WGS84 30N

(ii) Drill hole ends in mineralisation

Table 3: Niakafiri Drilling Results Released on February 27, 2017 (i)

----------------------------------------------------------------------------
                                              Interval (m)    Core    Grade
                                                             Length
Hole #    Northing Easting Azimuth Dip        From     To     (m)   (g/t Au)
----------------------------------------------------------------------------
MDD16-227  1457522  813507   110   -47         6       7       1      2.93
----------------------------------------------------------------------------
MDD16-228  1457509  813556   111   -47         8       12      4      1.09
----------------------------------------------------------------------------
                                               42      54      12     1.01
----------------------------------------------------------------------------
                                       incl.   43      46      3      2.63
----------------------------------------------------------------------------
MDD16-229  1457274  813506   112   -45         29      37      8      1.72
----------------------------------------------------------------------------
                                       incl.   32      37      5      2.45
----------------------------------------------------------------------------
MDD16-230  1457284  813457   112   -45         19      20      1      1.13
----------------------------------------------------------------------------
MDD16-231  1457196  813487   112   -45         22      24      2      1.24
----------------------------------------------------------------------------
                                               49      52      3      1.88
----------------------------------------------------------------------------
MDD16-232  1457158  813475   108   -47         22      26      4      1.11
----------------------------------------------------------------------------
                                               44      45      1      2.31
----------------------------------------------------------------------------
MDD16-233  1457208  813444   111   -49         50      55      5      1.63
----------------------------------------------------------------------------
                                       incl.   53      55      2      3.31
----------------------------------------------------------------------------
MDD16-234  1455830  813173   109   -46         71      72      1      1.78
----------------------------------------------------------------------------
MDD16-235  1455851  813253   110   -53         0       22      22     0.92
----------------------------------------------------------------------------
                                       incl.   4       11      7      1.42
----------------------------------------------------------------------------
                                               24      41      17     2.45
----------------------------------------------------------------------------
                                       incl.   24      35      11     3.25
----------------------------------------------------------------------------
MDD16-236  1455772  813220   110   -58         6       11      5      0.95
----------------------------------------------------------------------------
                                       incl.   6       7       1      2.77
----------------------------------------------------------------------------
                                               14      17      3      1.41
----------------------------------------------------------------------------
                                               24      29      5      1.12
----------------------------------------------------------------------------
                                       incl.   24      27      2      2.15
----------------------------------------------------------------------------
                                               35      37      2      1.10
----------------------------------------------------------------------------
MDD17-237  1455811  813248   109   -48         33      35      2      0.76
----------------------------------------------------------------------------
MDD17-238  1456105  813388   112   -46         6       8       2      0.66
----------------------------------------------------------------------------
                                               12      17      5      0.96
----------------------------------------------------------------------------
                                       incl.   12      13      1      3.25
----------------------------------------------------------------------------
MDD17-239  1456189  813384   110   -47         0       7       7      0.81
----------------------------------------------------------------------------
                                       incl.   0       2       2      1.62
----------------------------------------------------------------------------
                                               9       10      1      1.73
----------------------------------------------------------------------------
                                               11      23      12     1.89
----------------------------------------------------------------------------
                                       incl.   15      18      3      5.25
----------------------------------------------------------------------------
MDD17-240  1456229  813389   110   -45         2       5       3      3.97
----------------------------------------------------------------------------
                                               19      27      8      1.86
----------------------------------------------------------------------------
                                       incl.   24      27      3      4.20
----------------------------------------------------------------------------
                                               31      32      1      1.74
----------------------------------------------------------------------------
                                               38      40      2      1.17
----------------------------------------------------------------------------
MDD17-241  1456257  813280   111   -63         20      28      8      1.34
----------------------------------------------------------------------------
                                       incl.   26      27      1      5.56
----------------------------------------------------------------------------
                                              100     103      3      0.85
----------------------------------------------------------------------------
                                              110     114      4      0.81
----------------------------------------------------------------------------
MDD17-242  1456267  813402   110   -60         17      25      8      6.90
----------------------------------------------------------------------------
                                       incl.   20      21      1      45.5
----------------------------------------------------------------------------
MDD17-243  1456296  813288   112   -58         20      22      2      1.76
----------------------------------------------------------------------------
                                               58      60      2      1.05
----------------------------------------------------------------------------
                                               84      86      2      0.80
----------------------------------------------------------------------------
MDD17-244  1456146  813389   112   -47        NSR     NSR              NSR
----------------------------------------------------------------------------
MDD17-245  1457474  813521   112   -51         28      29      1      2.59
----------------------------------------------------------------------------
MDD17-246  1457442  813487   109   -45         53      54      1      1.72
----------------------------------------------------------------------------
MDD17-247  1457430  813539   112   -45         17      18      1      1.39
----------------------------------------------------------------------------
                                               36      38      2      1.02
----------------------------------------------------------------------------
                                               42      43      1      1.44
----------------------------------------------------------------------------
MDD17-248  1457362  813485   111   -53         62      65      3      0.97
----------------------------------------------------------------------------
MDD17-249  1457469  813549   112   -45         10      12      2      1.27
----------------------------------------------------------------------------
                                               34      40      6      1.50
----------------------------------------------------------------------------
                                       incl.   35      36      1      6.80
----------------------------------------------------------------------------
MDD17-250  1457352  813522   110   -46         5       7       2      0.96
----------------------------------------------------------------------------
MDD17-251  1456237  813356   111   -56         57      58      1      2.10
----------------------------------------------------------------------------
                                               65      66      1      2.63
----------------------------------------------------------------------------
                                               90      91      1      1.25
----------------------------------------------------------------------------
                                              108     109      1      1.24
----------------------------------------------------------------------------
MDD17-252  1456248  813321   111   -61      Pending Pending Pending  Pending
----------------------------------------------------------------------------
MDD17-253  1456324  813342   110   -61      Pending Pending Pending  Pending
----------------------------------------------------------------------------
MDD17-254  1456286  81330    111   -62         23      24      1      0.92
----------------------------------------------------------------------------
MDD17-255  1456335  813295   112   -58         1       2       1      4.51
----------------------------------------------------------------------------
                                               13      18      5      1.68
----------------------------------------------------------------------------
                                               22      23      1      2.87
----------------------------------------------------------------------------
                                               34      35      1      12.3
----------------------------------------------------------------------------
                                               51      52      1      1.20
----------------------------------------------------------------------------
                                               62      63      1      1.32
----------------------------------------------------------------------------
                                               90      91      1      1.63
----------------------------------------------------------------------------
                                               96      97      1      2.15
----------------------------------------------------------------------------

(i)Intervals calculated using a 0.4 g/t Au cut-off and 2 metres maximum internal dilution. True widths are unknown and intercept gold values are determined from uncapped assays. UTM Coordinates are WGS84 30N

APPENDIX 2

JORC Code, 2012 Edition - Table 1 Report

Section 1: Sampling Techniques and Data

(Criteria in this section apply to all succeeding sections)

----------------------------------------------------------------------------
Criteria         2012 JORC Code explanation    Commentary

----------------------------------------------------------------------------
Sampling         - Nature and quality of       - A total of 115 Diamond Core
 techniques      sampling (e.g. cut channels,  holes (DD) for 12,000 m are
                 random chips, or specific     planned for the current drill
                 specialised industry standard program at Niakafiri. Results
                 measurement tools appropriate from 33 holes are reported
                 to the minerals under         herein. The first 27 holes
                 investigation, such as down   were reported in a previous
                 hole gamma sondes, or         Company news release
                 handheld XRF instruments,     (February 27, 2017). Sampling
                 etc.). These examples should  is half core from the DD
                 not be taken as limiting the  drilling.
                 broad meaning of sampling.

                 - Include reference to        - Drill core was sawn in half
                 measures taken to ensure      over defined 1-metre
                 sample representivity and the sampling intervals with one
                 appropriate calibration of    half retained and one half
                 any measurement tools or      sampled and assayed for gold.
                 systems used.                 Oriented core markings were
                                               used as guides for sawing.

                 - Aspects of the              - Initially all core is
                 determination of              sampled along the entire hole
                 mineralisation that are       to
                 Material to the Public        determine the nature of
                 Report.                       mineralisation and
                                               relationship to logged
                                               lithology, alteration and
                                               structure. Based on the
                                               detailed sampling results,
                                               mineralisation zones were
                                               defined with additional
                                               drilling and sampling,
                                               specifically across the
                                               mineralisation and along the
                                               mineralised shoulders on
                                               either side.

                 - In cases where 'industry    - Industry standard
                 standard' work has been done  analytical techniques have
                 this would be relatively      been utilized.
                 simple (e.g. 'reverse
                 circulation drilling was used
                 to obtain 1 m samples from
                 which 3 kg was pulverised to
                 produce a 30 g charge for
                 fire assay'). In other cases,
                 more explanation may be
                 required, such as where there
                 is coarse gold that has
                 inherent sampling problems.
                 Unusual commodities or
                 mineralisation types (e.g.
                 submarine nodules) may
                 warrant disclosure of
                 detailed information.

----------------------------------------------------------------------------
Drilling         - Drill type (e.g. core,      - A diamond core drilling
 techniques      reverse circulation, open-    program is being conducted.
                 hole hammer, rotary air       Diamond drill holes are
                 blast, auger, Bangka,         drilled using standard HQ or
                 sonic, etc.) and details      NQ sized rods. Wider diameter
                 (e.g. core diameter, triple   HQ core is utilized through
                 or standard tube, depth of    the upper oxide and
                 diamond tails, face-          transitional portions of the
                 sampling bit or other type,   stratigraphy and size
                 whether core is               reduction occurs to NQ in
                 oriented and if so, by what   fresh material. Oriented core
                 method, etc.).                is utilized once appropriate
                                               NQ core size is being
                                               drilled.

----------------------------------------------------------------------------
Drill sample     - Method of recording and    - Diamond core recoveries are
 recovery        assessing core and            measured and recorded for
                 chip sample recoveries and    each 1-metre sample interval.
                 results assessed.             Core was sampled on nominal 1
                                               m intervals.

                 - Measures taken to maximise  - Diamond drill contractor
                 sample recovery and ensure    has experience in drilling
                 representative nature of the  within the geologic host
                 samples.                      environment and all measures
                                               to maximize recoveries are
                                               employed.

                 - Whether a relationship      - There is no evidence to
                 exists between sample         suggest a relationship
                 recovery and grade and        between sample recovery and
                 whether sample bias may have  grade as there is no
                 occurred due to preferential  significant loss of material.
                 loss/gain of fine/coarse      Sample recoveries are of very
                 material.                     good quality.

----------------------------------------------------------------------------
Logging          - Whether core and chip       - Core samples were
                 samples have been             geologically and
                 geologically and              geotechnically logged
                 geotechnically logged to a    following established
                 level of detail to support    standard operating procedures
                 appropriate Mineral Resource  and includes sufficient and
                 estimation, mining studies    appropriate detail to support
                 and metallurgical studies.    Mineral Resource estimation,
                                               mining and metallurgical
                                               studies.

                 - Whether logging is          - Logging is qualitative in
                 qualitative or quantitative   nature. All core is
                 in nature. Core (or costean,  photographed to provide a
                 channel, etc.) photography.   continuous record. Half core
                                               is also stored for future
                                               reference and utilization.

                 - The total length and        - All recovered core is
                 percentage of the relevant    logged in detail.
                 intersections logged.

----------------------------------------------------------------------------
Sub-sampling     - If core, whether cut or     - Drill core sampling is
 techniques and  sawn and whether quarter,     undertaken on clearly marked
 sample          half or all core taken.       standardized 1-metre
 preparation                                   intervals then cut in half
                                               with a diamond saw along the
                                               core length following
                                               orientation lines. Half core
                                               is analyzed over one-meter
                                               lengths.

                 - If non-core, whether        - Not applicable - all core
                 riffled, tube sampled, rotary drilling.
                 split, etc. and whether
                 sampled wet or dry.

                 - For all sample types, the   - Core handling is closely
                 nature, quality and           monitored under standard
                 appropriateness of the sample industry methods from drill
                 preparation technique.        to lab. Sample preparation
                                               procedures at the analytical
                                               lab are also industry
                                               standard and closely
                                               monitored.

                 -Quality control procedures   - Standard Reference
                 adopted for all sub-sampling  Materials (Various Standards
                 stages to maximise            and blind Blanks) are
                 representivity of samples.    inserted into the sample
                                               stream at industry accepted
                                               intervals. Blind sample
                                               duplicates are also
                                               collected.

                 - Measures taken to ensure    - Field duplicate data
                 that the sampling is          indicates acceptable
                 representative of the in situ variability indicating coarse
                 material collected, including gold is not a significant
                 for instance results for      issue in the sampling.
                 field duplicate/second-half
                 sampling.

                 - Whether sample sizes are
                 appropriate to the grain size
                 of the material being
                 sampled.
----------------------------------------------------------------------------
Quality of assay - The nature, quality and     - Gold assays for half-core
 data and        appropriateness of the        samples form the core
 laboratory      assaying and laboratory       drilling were obtained from
 tests           procedures used and whether   the independent SGS operated
                 the technique is considered   lab on-site at the Sabodala
                 partial or total.             Mine facility which provides
                                               an AA (Atomic Absorption)
                                               finish gold result. Selected
                                               samples from mineralised
                                               intervals are periodically
                                               re-analyzed at the
                                               independent ALS lab in
                                               Johannesburg, South Africa to
                                               provide an FA (Fire Assay)
                                               finish.

                 - For geophysical tools,      - Not applicable.
                 spectrometers, handheld XRF
                 instruments, etc., the
                 parameters used in
                 determining the analysis
                 including instrument make and
                 model, reading times,
                 calibrations factors applied
                 and their derivation, etc.

                 - Nature of quality control   - Certified reference
                 procedures adopted (e.g.      materials (SRM's), blanks and
                 standards, blanks,            duplicates are regularly
                 duplicates, external          inserted into the sample
                 laboratory checks) and        preparation and analysis
                 whether acceptable levels of  process with approximately
                 accuracy (ie lack of bias)    10% of all samples being
                 and precision have been       related to quality control.
                 established.

                                               - Data is reviewed before
                                               being accepted into the
                                               database. Any batches failing
                                               QAQC analysis are resubmitted
                                               for check assays. Dataset
                                               QAQC contains acceptable
                                               levels of precision and
                                               accuracy.

----------------------------------------------------------------------------
Verification of  - The verification of         - All results and all
 sampling and    significant intersections by  significant intersections
 assaying        either independent or         have been reviewed by staff
                 alternative company           geologists to check the
                 personnel.                    geological context.

                 - The use of twinned holes.   - Some twin core holes have
                                               been undertaken in this
                                               program to verify and confirm
                                               previous RC drilling results.

                 - Documentation of primary     - All sample and recovery
                 data, data entry procedures,  data is recorded to paper and
                 data verification, data       electronic forms at the time
                 storage (physical and         of logging. Geological
                 electronic) protocols.        logging is directly logged
                                               into template log sheets by
                                               Toughbook computer. The
                                               templates are then provided
                                               to an internal database
                                               manager for loading in
                                               database management software.
                                               Referential integrity is
                                               checked as part of the data
                                               loading process.

                 - Discuss any adjustment to   - No adjustments were made to
                 assay data.                   assay data returned from the
                                               laboratory.

----------------------------------------------------------------------------
Location of data - Accuracy and quality of     - Drill hole collar locations
 points          surveys used to locate drill  were surveyed by trained site
                 holes (collar and down-hole   based technicians using real
                 surveys), trenches, mine      time differential GPS (DGPS)
                 workings and other locations  to a sub decimetre accuracy
                 used in Mineral Resource      in horizontal and vertical
                 estimation.                   position. Vertical precision
                                               was supplemented using a
                                               Digital Surface Model. Down
                                               hole drill hole surveys were
                                               undertaken by the drill
                                               contractor utilizing a Reflex
                                               EZ-Shot downhole survey
                                               instrument. Survey intervals
                                               were collected at collar,
                                               periodic intervals down the
                                               hole and end of hole were
                                               routinely collected.

                 -Specification of the grid    - Both UTM and mine-grid
                 system used.                  systems are utilized for
                                               locating drill collar
                                               locations.

                 - Quality and adequacy of     - Tographic control is based
                 topographic control.          on the Digital Surface Model.
                                               The quality and accuracy of
                                               topographic control is
                                               considered to be reasonable.

----------------------------------------------------------------------------
Data spacing and - Data spacing for reporting  - Drilling is nominally on a
 distribution    of Exploration Results.       40 m by 40 m spacing, with
                                               exceptions based on data
                                               interpretation.

                 - Whether the data spacing    - Geological interpretation
                 and distribution is           based on drill spacing has
                 sufficient to establish the   identified continuity of
                 degree of geological and      geology and grade and is
                 grade continuity appropriate  determined to be sufficient
                 for the Mineral Resource and  for estimating Mineral
                 Ore Reserve estimation        Resources and Mineral
                 procedure(s) and              Reserves. Experimental
                 classifications applied.      variograms generated for
                                               mineralised zones with
                                               sufficient data, have
                                               confirmed the grade
                                               continuity ranges based on
                                               the drill hole spacing.

                 - Whether sample compositing  - Diamond drill core were
                 has been applied.             sampled on nominal 1 meter
                                               intervals down the hole, and
                                               assayed. Sample compositing
                                               was not applied during the
                                               current exploration drilling
                                               program.

----------------------------------------------------------------------------
Orientation of   - Whether the orientation of  - Drill hole azimuths and
 data in         sampling achieves unbiased    dips have been oriented
 relation to     sampling of possible          perpendicular to the
 geological      structures and the extent to  interpreted mineralised zones
 structure       which this is known,          in order to intersect the
                 considering the deposit type. true widths of the zones as
                                               closely as possible.
                                               Occasionally, drilling was
                                               planned at oblique angles
                                               when the mineralisation
                                               trends were not yet well
                                               defined or if the optimal
                                               collar location was not
                                               accessible. Generally, the
                                               majority of drilling is
                                               oriented such that the
                                               sampling of mineralisation is
                                               unbiased.

                 - If the relationship between - The small percentage of
                 the drilling orientation and  holes oriented oblique to the
                 the orientation of key        mineralisation are located in
                 mineralised structures is     areas with sufficient drill
                 considered to have introduced density oriented
                 a sampling bias, this should  perpendicular to
                 be assessed and reported if   mineralisation, and will not
                 material.                     introduce a significant
                                               sampling bias.
----------------------------------------------------------------------------
----------------------------------------------------------------------------
Sample Security  - The measures taken to       - Samples are removed from
                 ensure sample security.       the field immediately upon
                                               drilling and stored in a
                                               secure compound for sub
                                               sampling and preparation for
                                               lab dispatch. Samples are
                                               delivered directly from the
                                               site logging / sampling
                                               facility to the on site SGS
                                               laboratory or the ALS
                                               laboratory in South Africa
                                               using securely sealed sample
                                               bags and a secure chain of
                                               custody. Sample submission
                                               forms are sent in paper form
                                               with the samples as well as
                                               electronically to the
                                               laboratory. Reconciliation of
                                               samples occurs prior to
                                               commencement of sample
                                               preparation of dispatches.

----------------------------------------------------------------------------
Audits or        - The results of any audits   - All QA/QC data is reviewed
reviews          or reviews of sampling        in an ongoing hole-by-hole
                 techniques and data.          basis and reported both as
                                               per hole and in monthly
                                               summaries. All QAQC data has
                                               been reviewed by the QP's for
                                               this release.
----------------------------------------------------------------------------
Section 2: Reporting of Exploration Results

(Criteria listed in the preceding section also apply to this section.)

----------------------------------------------------------------------------
Criteria         2012 JORC Code explanation    Commentary

----------------------------------------------------------------------------
Mineral tenement - Type, reference             - Drilling reported here has
and land tenure  name/number, location and     been completed at the
status           ownership including           Niakafiri deposit area of the
                 agreements or material issues Sabodala Mine Lease in
                 with third parties such as    Senegal, West Africa.
                 joint ventures, partnerships,
                 overriding royalties, native
                 title interests, historical
                 sites, wilderness or national
                 park and environmental
                 settings.

                 - The security of the tenure  - Teranga Gold Corporation is
                 held at the time of reporting 100% holder of the Sabodala
                 along with any known          Mine Lease.
                 impediments to obtaining a
                 licence to operate in the
                 area.

                                               - No historical sites,
                                               wilderness or national parks
                                               are located in the Mine Lease
                                               area. Portions of Niakafiri
                                               occur within the limits of
                                               the Sabodala village.

                                               - Tenure is considered very
                                               secure.

----------------------------------------------------------------------------
Exploration done -Acknowledgment and appraisal - The majority of the
by other parties of exploration by other       Niakafiri deposit area
                 parties.                      exploration and resource
                                               estimation has been conducted
                                               by Teranga Gold Corporation.
                                               Two portions, Niakafiri
                                               Southwest and Niakafiri
                                               Southeast, were drilled by
                                               Oromin Explorations Ltd, on
                                               behalf of the OJVG between
                                               2005 and 2012. Teranga
                                               acquired the OJVG in 2013.

----------------------------------------------------------------------------
Geology          - Deposit type, geological    - The Sabodala Gold Project
                 setting and style of          (Mine Lease and Regional
                 mineralisation.               Permits) covers greenstone
                                               belts and intra belt
                                               granitoids of the Proterozoic
                                               Birimian Shield. The oldest
                                               rocks within the concession
                                               are interpreted to be
                                               tholeitic to calc-alkaline
                                               basalts, andesites and
                                               volcaniclastic sediments.
                                               Predominately mafic, volcano-
                                               sedimentary packages dominate
                                               the younger parts of the
                                               local stratigraphy. Numerous
                                               phases of plutonic activity
                                               have intruded the earlier
                                               sequences ranging from
                                               gabbroic to granitic in
                                               composition. Known
                                               mineralisation is
                                               structurally controlled and
                                               widely associated with
                                               silicification, quartz
                                               veining, iron carbonate,
                                               sericite, pyrite and locally
                                               albitic alteration. Both the
                                               mafic volcano-sedimentary
                                               packages and the coarse
                                               grained intrusive rocks host
                                               significant mineralisation in
                                               the project area.

----------------------------------------------------------------------------
Drill hole       - A summary of all            - All drill hole collar
Information      information material to the   locations, azimuth, dip and
                 understanding of the          gold assay intercept data
                 exploration results including received to date is available
                 a tabulation of the following on the Teranga Gold company
                 information for all Material  website at
                 drill holes:                  http://www.terangagold.com/.
                                               All same information for the
                 - easting and northing of the current drill program results
                 drill hole collar             are designated within the
                                               assay Tables herein.
                 - elevation or RL (Reduced
                 Level - elevation above sea
                 level in metres) of the drill
                 hole collar

                 - dip and azimuth of the hole

                 - down hole length and
                 interception depth

                 - hole length.

                 - If the exclusion of this    - Not Applicable.
                 information is justified on
                 the basis that the
                 information is not Material
                 and this exclusion does not
                 detract from the
                 understanding of the report,
                 the Competent Person should
                 clearly explain why this is
                 the case.

----------------------------------------------------------------------------
Data aggregation - In reporting Exploration    - Gold intercepts are
methods          Results, weighting averaging  reported as length-weighted
                 techniques, maximum and/or    average grades in grams per
                 minimum grade truncations     tonne, with a maximum of 2
                 (e.g. cutting of high-grades) metres internal dilution and
                 and cut-off grades are        no external dilution. Assays
                 usually Material and should   are not capped prior to
                 be stated.                    averaging. A 0.4 g/t Au
                                               minimum cut-off grade per
                                               sample was applied for all
                                               reported intervals.

                 - Where aggregate intercepts  - Grade intersections and
                 incorporate short lengths of  inclusive higher grade
                 high grade results and longer intersections are reported
                 lengths of low grade results, separately and available on
                 the procedure used for such   the Teranga Gold company
                 aggregation should be stated  website at
                 and some typical examples of  http://www.terangagold.com/.
                 such aggregations should be   Similarly, higher grade
                 shown in detail.              intervals within the broader
                                               reported intervals have been
                                               separated and designated
                                               within the Tables herein.

                 - The assumptions used for    - Not Applicable.
                 any reporting of metal
                 equivalent values should be
                 clearly stated.

----------------------------------------------------------------------------
Relationship     - These relationships are     - Down hole core lengths are
between          particularly important in the reported, as true widths have
mineralisation   reporting of Exploration      not yet been determined.
widths and       Results.
intercept
lengths

                 - If the geometry of the      - Not Applicable.
                 mineralisation with respect
                 to the drill hole angle is
                 known, its nature should be
                 reported.

                 - if it is not known and only - Is included within the
                 the down hole lengths are     Tables herein.
                 reported, there should be a
                 clear statement to this
                 effect (e.g. 'down hole
                 length, true width not
                 known').

----------------------------------------------------------------------------
Diagrams         - Appropriate maps and        - A detailed Plan view map of
                 sections (with scales) and    drill hole collar locations,
                 tabulations of intercepts     (Planned and Completed) for
                 should be included for any    the Niakafiri drill program
                 significant discovery being   is available in Appendix 1
                 reported These should         herein. Representative
                 include, but not be limited   Sections form the current
                 to a plan view of drill hole  drilling program are also
                 collar locations and          included in Appendix 1
                 appropriate sectional views.  herein, of this news release.

----------------------------------------------------------------------------
Balanced         - Where comprehensive         - A comprehensive listing of
reporting        reporting of all Exploration  all significant gold
                 Results is not practicable,   intercept results for all of
                 representative reporting of   the 33 holes reported in this
                 both low and high-grades      press release is presented in
                 and/or widths should be       a complete Table of results
                 practiced to avoid misleading in Appendix 1 herein, of this
                 reporting of Exploration      press release. Results for
                 Results.                      all 60 holes completed at
                                               Niakafiri during this current
                                               program are listed in a Table
                                               on the Company's website at
                                               http://www.terangagold.com/

----------------------------------------------------------------------------
Other            - Other exploration data, if  - No other meaningful or
substantive      meaningful and material,      material exploration data has
exploration data should be reported including  been collected.in reference
                 (but not limited to):         to this current exploration
                 geological observations;      drilling program at
                 geophysical survey results;   Niakafiri.
                 geochemical survey results;
                 bulk samples - size and
                 method of treatment;
                 metallurgical test results;
                 bulk density, groundwater,
                 geotechnical and rock
                 characteristics; potential
                 deleterious or contaminating
                 substances.

----------------------------------------------------------------------------
Further work     -The nature and scale of       - All data will be compiled
                 planned further work (e.g.    and analysed for future
                 tests for lateral extensions  follow-up programs at the
                 or depth extensions or large- Niakafiri deposit area,
                 scale step-out drilling).     initially towards generating
                                               an updated resource
                                               estimation for H2 2017.

                 - Diagrams clearly
                 highlighting the areas of
                 possible extensions,
                 including the main geological
                 interpretations and future
                 drilling areas, provided this
                 information is not
                 commercially sensitive.
----------------------------------------------------------------------------

Contacts:
Teranga Gold Corporation
Richard Young
President & CEO
+1 416-594-0000
ryoung@terangagold.com

Teranga Gold Corporation
Trish Moran
Head of Investor Relations
+1 416-564-4290
tmoran@terangagold.com

Großer Insider-Report 2024 von Dr. Dennis Riedl
Wenn Insider handeln, sollten Sie aufmerksam werden. In diesem kostenlosen Report erfahren Sie, welche Aktien Sie im Moment im Blick behalten und von welchen Sie lieber die Finger lassen sollten.
Hier klicken
© 2017 Marketwired
Werbehinweise: Die Billigung des Basisprospekts durch die BaFin ist nicht als ihre Befürwortung der angebotenen Wertpapiere zu verstehen. Wir empfehlen Interessenten und potenziellen Anlegern den Basisprospekt und die Endgültigen Bedingungen zu lesen, bevor sie eine Anlageentscheidung treffen, um sich möglichst umfassend zu informieren, insbesondere über die potenziellen Risiken und Chancen des Wertpapiers. Sie sind im Begriff, ein Produkt zu erwerben, das nicht einfach ist und schwer zu verstehen sein kann.