WASHINGTON (dpa-AFX) - A123 Systems (AONE) announced that it will supply an 11MW Grid Battery System or GBS to Sempra Generation for the Auwahi Wind project in Maui, Hawaii. The advanced energy storage solution is designed to smooth variable wind power generation, which is expected to help maintain the stability to Maui's electric grid.
When fully operational, the 21MW Auwahi Wind project is expected to be capable of generating enough energy to power the equivalent of 10,000 homes, and the Hawaii Public Utilities Commission has approved a 20-year contract for Maui Electric Company to purchase the electricity produced at Auwahi, the company said.
Copyright RTT News/dpa-AFX
© 2011 AFX News