Anzeige
Mehr »
Login
Samstag, 04.05.2024 Börsentäglich über 12.000 News von 685 internationalen Medien
InnoCan Pharma: Multi-Milliarden-Wert in diesem Pennystock?!
Anzeige

Indizes

Kurs

%
News
24 h / 7 T
Aufrufe
7 Tage

Aktien

Kurs

%
News
24 h / 7 T
Aufrufe
7 Tage

Xetra-Orderbuch

Fonds

Kurs

%

Devisen

Kurs

%

Rohstoffe

Kurs

%

Themen

Kurs

%

Erweiterte Suche
PR Newswire
14 Leser
Artikel bewerten:
(0)

Taseko Announces First Quarter Production Results

VANCOUVER, April 6 /PRNewswire-FirstCall/ -- Taseko Mines Limited (TSX: TKO; NYSE Amex: TGB) ("Taseko" or the "Company") reports unaudited first quarter production results for its Gibraltar Mine.

For the first quarter of 2010, the Gibraltar Mine produced 23.2 million pounds of copper and 194 thousand pounds of molybdenum.

A quarter over quarter production comparison is below: ------------------------------------------------------------------------- Q4 2009 Q1 2010 ------------------------------------------------------------------------- Mill Throughput (millions, tons) 3.2 3.6 ------------------------------------------------------------------------- Copper Recoveries (%) 84.1 89.8 ------------------------------------------------------------------------- Copper Production (millions, lbs) 17.4 23.2 -------------------------------------------------------------------------

The improved first quarter production performance was primarily a result of continued optimization of recently upgraded concentrator components and circuits. Mill throughput has steadily increased and tons per operating day reached 45,000 tons in the quarter, even during the operationally challenging winter months, as material handling issues were effectively managed. Metal recoveries have significantly improved since the tower mill was integrated into the recovery circuit, increasing regrind capacity. Additionally, copper grade for the quarter was approximately 10% above life of mine average grade.

Russell Hallbauer, President and CEO of Taseko, commented, "These sustainable production improvements are reflecting the modern, efficient mining operation we have built. In approximately six months, major construction projects will be complete and the targeted annual production level of 115 million pounds of copper will soon follow. Simultaneous with our production ramp up, copper prices are at two-year highs putting Taseko in an excellent position to move forward with other growth initiatives."

Russell Hallbauer President and CEO No regulatory authority has approved or disapproved of the information contained in this news release. Forward Looking Statements

This release includes certain statements that may be deemed "forward-looking statements". All statements in this release, other than statements of historical facts, that address intended future agreements, future production, reserve potential, exploration drilling, exploitation activities and events or developments that the Company expects are forward-looking statements. Although the Company believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results or developments may differ materially from those in the forward-looking statements. Factors that could cause actual results to differ materially from those in forward-looking statements include capital market conditions, commodities market prices, exploitation and exploration successes, lack of continuity of mineralization, completion of the mill upgrade on time estimated and at scheduled cost, continued availability of capital and financing, and general economic, market or business conditions. Investors are cautioned that any such statements are not guarantees of future performance and that actual results or developments may differ materially from those projected in the forward looking statements. For more information on the Company, Investors should review the Company's annual Form 40-F filing with the United States Securities and Exchange Commission or the Company's home jurisdiction filings at http://www.sedar.com/.

Taseko Mines Limited

CONTACT: on Taseko, please see the Company's website http://www.tasekomines.com/
or contact: Brian Bergot, Investor Relations - (778) 373-4545, toll free
1-800-667-2114

Kupfer - Jetzt! So gelingt der Einstieg in den Rohstoff-Trend!
In diesem kostenfreien Report schaut sich Carsten Stork den Kupfer-Trend im Detail an und gibt konkrete Produkte zum Einstieg an die Hand.
Hier klicken
© 2010 PR Newswire
Werbehinweise: Die Billigung des Basisprospekts durch die BaFin ist nicht als ihre Befürwortung der angebotenen Wertpapiere zu verstehen. Wir empfehlen Interessenten und potenziellen Anlegern den Basisprospekt und die Endgültigen Bedingungen zu lesen, bevor sie eine Anlageentscheidung treffen, um sich möglichst umfassend zu informieren, insbesondere über die potenziellen Risiken und Chancen des Wertpapiers. Sie sind im Begriff, ein Produkt zu erwerben, das nicht einfach ist und schwer zu verstehen sein kann.