Anzeige
Mehr »
Login
Sonntag, 28.04.2024 Börsentäglich über 12.000 News von 686 internationalen Medien
Fokus auf Nurexone: High-Level Biotech im Pennystock-Kleid!
Anzeige

Indizes

Kurs

%
News
24 h / 7 T
Aufrufe
7 Tage

Aktien

Kurs

%
News
24 h / 7 T
Aufrufe
7 Tage

Xetra-Orderbuch

Fonds

Kurs

%

Devisen

Kurs

%

Rohstoffe

Kurs

%

Themen

Kurs

%

Erweiterte Suche
PR Newswire
16 Leser
Artikel bewerten:
(0)

Davis-Besse Control Rod Drive Nozzle Inspection Completed

OAK HARBOR, Ohio, May 3 /PRNewswire-FirstCall/ -- Inspection of control rod drive mechanism nozzles at the Davis-Besse Nuclear Power Station in Oak Harbor, Ohio, was completed this past weekend.

Initial testing in March of the 69 nozzles penetrating the reactor head identified 16 requiring modification. Additional testing on the nozzles began late last week and has identified 8 additional nozzles requiring modification. As a result, a total of 24 nozzles will be modified before the plant is restarted.

Modification to 10 nozzles is nearing completion, while work on the remaining 14 is now underway. Dye-penetrant and ultrasonic testing will be performed to confirm the modifications before the plant is restarted.

The modification process involves removing the lower half of each affected nozzle and re-welding and inspecting the remaining section to provide structural integrity.

Fuel will be reloaded into the reactor during the modification and testing of the affected nozzles. The reactor head then will be installed and the plant is expected to be ready for restart in July.

The 908-megawatt plant shut down for scheduled refueling and maintenance work on February 28.

Davis-Besse is part of FirstEnergy Nuclear Operating Company (FENOC), a subsidiary of Akron, Ohio-based FirstEnergy Corp. .

Forward-Looking Statements: This news release includes forward-looking statements based on information currently available to management. Such statements are subject to certain risks and uncertainties. These statements include declarations regarding management's intents, beliefs and current expectations. These statements typically contain, but are not limited to, the terms "anticipate," "potential," "expect," "believe," "estimate" and similar words. Forward-looking statements involve estimates, assumptions, known and unknown risks, uncertainties and other factors that may cause actual results, performance or achievements to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements. Actual results may differ materially due to the speed and nature of increased competition in the electric utility industry and legislative and regulatory changes affecting how generation rates will be determined following the expiration of existing rate plans in Pennsylvania, the impact of the regulatory process on the pending matters in Ohio, Pennsylvania and New Jersey, business and regulatory impacts from American Transmission Systems, Incorporated's realignment into PJM Interconnection, L.L.C., economic or weather conditions affecting future sales and margins, changes in markets for energy services, changing energy and commodity market prices and availability, replacement power costs being higher than anticipated or inadequately hedged, the continued ability of FirstEnergy's regulated utilities to collect transition and other charges or to recover increased transmission costs, operating and maintenance costs being higher than anticipated, other legislative and regulatory changes, revised environmental requirements, including possible greenhouse gas emission regulations, the potential impacts of the U.S. Court of Appeals' July 11, 2008 decision requiring revisions to the Clean Air Interstate Rules and the scope of any laws, rules or regulations that may ultimately take their place, the uncertainty of the timing and amounts of the capital expenditures needed to, among other things, implement the Air Quality Compliance Plan (including that such amounts could be higher than anticipated or that certain generating units may need to be shut down) or levels of emission reductions related to the Consent Decree resolving the New Source Review litigation or other similar potential regulatory initiatives or actions, adverse regulatory or legal decisions and outcomes (including, but not limited to, the revocation of necessary licenses or operating permits and oversight) by the Nuclear Regulatory Commission, factors that may further delay, or increase the costs associated with (including replacement power costs), the restart of the Davis-Besse Nuclear Power Station from its current refueling outage, including that the modifications to control rod drive mechanism nozzles take longer than expected or are not effective, other conditions requiring remediation are discovered during the extended outage, or the NRC takes adverse action in connection with any of the foregoing; Metropolitan Edison Company's and Pennsylvania Electric Company's transmission service charge filings with the Pennsylvania Public Utility Commission, the continuing availability of generating units and their ability to operate at or near full capacity, the ability to comply with applicable state and federal reliability standards, the ability to accomplish or realize anticipated benefits from strategic goals (including employee workforce initiatives), the ability to improve electric commodity margins and to experience growth in the distribution business, the changing market conditions that could affect the value of assets held in FirstEnergy's nuclear decommissioning trusts, pension trusts and other trust funds, and cause it to make additional contributions sooner, or in an amount that is larger than currently anticipated, the ability to access the public securities and other capital and credit markets in accordance with FirstEnergy's financing plan and the cost of such capital, changes in general economic conditions affecting the company, the state of the capital and credit markets affecting the company, interest rates and any actions taken by credit rating agencies that could negatively affect FirstEnergy's access to financing or its costs or increase its requirements to post additional collateral to support outstanding commodity positions, letters of credit and other financial guarantees, the continuing decline of the national and regional economy and its impact on the company's major industrial and commercial customers, issues concerning the soundness of financial institutions and counterparties with which FirstEnergy does business, the expected timing and likelihood of completion of the proposed merger with Allegheny Energy, Inc., including the timing, receipt and terms and conditions of any required governmental and regulatory approvals of the proposed merger that could reduce anticipated benefits or cause the parties to abandon the merger, the diversion of management's time and attention from our ongoing business during this time period, the ability to maintain relationships with customers, employees or suppliers as well as the ability to successfully integrate the businesses and realize cost savings and any other synergies and the risk that the credit ratings of the combined company or its subsidiaries may be different from what the companies expect and the risks and other factors discussed from time to time in its Securities and Exchange Commission filings, and other similar factors. The foregoing review of factors should not be construed as exhaustive. New factors emerge from time to time, and it is not possible for management to predict all such factors, nor assess the impact of any such factor on FirstEnergy's business or the extent to which any factor, or combination of factors, may cause results to differ materially from those contained in any forward-looking statements. FirstEnergy expressly disclaims any current intention to update any forward-looking statements contained herein as a result of new information, future events, or otherwise.

http://www.firstenergycorp.com/

FirstEnergy Corp.

CONTACT: Todd Schneider, +1-330-620-2895, or Investors: Ron Seeholzer,
+1-330-384-5415

Web Site: http://www.firstenergycorp.com/

Großer Insider-Report 2024 von Dr. Dennis Riedl
Wenn Insider handeln, sollten Sie aufmerksam werden. In diesem kostenlosen Report erfahren Sie, welche Aktien Sie im Moment im Blick behalten und von welchen Sie lieber die Finger lassen sollten.
Hier klicken
© 2010 PR Newswire
Werbehinweise: Die Billigung des Basisprospekts durch die BaFin ist nicht als ihre Befürwortung der angebotenen Wertpapiere zu verstehen. Wir empfehlen Interessenten und potenziellen Anlegern den Basisprospekt und die Endgültigen Bedingungen zu lesen, bevor sie eine Anlageentscheidung treffen, um sich möglichst umfassend zu informieren, insbesondere über die potenziellen Risiken und Chancen des Wertpapiers. Sie sind im Begriff, ein Produkt zu erwerben, das nicht einfach ist und schwer zu verstehen sein kann.