Anzeige
Mehr »
Sonntag, 08.02.2026 - Börsentäglich über 12.000 News
Der Shakeout: Silber hat genau das getan, was echte Bullenmärkte immer tun - es hat die Touristen abgeschüttelt
Anzeige

Indizes

Kurs

%
News
24 h / 7 T
Aufrufe
7 Tage

Aktien

Kurs

%
News
24 h / 7 T
Aufrufe
7 Tage

Xetra-Orderbuch

Fonds

Kurs

%

Devisen

Kurs

%

Rohstoffe

Kurs

%

Themen

Kurs

%

Erweiterte Suche
PR Newswire
73 Leser
Artikel bewerten:
(0)

NASA's Orion Spacecraft Powers through First Integrated System Testing

WASHINGTON, April 11, 2014 /PRNewswire-USNewswire/ -- NASA's Orion spacecraft has proven its mettle in a test designed to determine the spacecraft's readiness for its first flight test -- Exploration Flight Test-1 (EFT-1) -- later this year. EFT-1 will send the spacecraft more than 3,600 miles from Earth and return it safely.

NASA Logo.

The spacecraft ran for 26 uninterrupted hours during the final phase of a major test series completed April 8 at the agency's Kennedy Space Center in Florida. The test verified the crew module can route power and send commands that enable the spacecraft to manage its computer system, software and data loads, propulsion valves, temperature sensors and other instrumentation.

"This has been the most significant integrated testing of the Orion spacecraft yet," said William Gerstenmaier, associate administrator for NASA's human exploration and operations at the agency's Headquarters in Washington. "The work done to test the avionics with the crew module isn't just preparing us for Orion's first trip to space in a few months. It's also getting us ready to send crews far into the solar system."

In October 2013, NASA and Lockheed Martin engineers powered on Orion's main computer for the first time. Since then, they have installed harnessing, wiring and electronics. This was the first time engineers ran the crew module through its paces to verify all system actuators respond correctly to commands and all sensors report back as planned. More than 20 miles of wire are required to connect the different systems being powered.

"Getting all the wiring right, integrating every element of the avionics together, and then testing it continuously for this many hours is a big step toward getting to deep space destinations," said Mark Geyer, Orion program manager.

Engineers now are preparing the crew module for vibration testing, scheduled for the week of April 14. In May, the heat shield will be installed and, shortly thereafter, the crew module will be attached with the service module.

During EFT-1, an uncrewed Orion spacecraft will take a four-hour trip into space, traveling 15 times farther from Earth than the International Space Station. During its reentry into Earth's atmosphere, Orion will be traveling at 20,000 mph, faster than any current spacecraft capable of carrying humans, and endure temperatures of approximately 4,000 degrees Fahrenheit. The data gathered during the flight will inform design decisions to improve the spacecraft that will one day carry humans to an asteroid and eventually Mars. EFT-1 is targeted for launch in December.

For more information on Orion, visit:

http://www.nasa.gov/orion

Logo- http://photos.prnewswire.com/prnh/20081007/38461LOGO

SOURCE NASA

© 2014 PR Newswire
Vorsicht, geheim!
2026 startet mit einem Paukenschlag: Der DAX outperformt den US-Markt, Nachzügler holen auf. Ein erstes Signal, dass der Bullenmarkt an Breite gewinnt. Während viele Anleger weiter auf die großen Tech-Namen setzen, hat sich im Hintergrund längst ein Umschwung vollzogen. Der Fokus verschiebt sich weg von überteuerten KI-Highflyern hin zu soliden Qualitätswerten aus der zweiten Reihe.

Anleger, die jetzt clever agieren, setzen nicht auf das, was war, sondern auf das, was kommt. Unternehmen mit gesunder Bilanz, unterschätztem Potenzial und begrenztem Abwärtsrisiko könnten 2026 zu den großen Gewinnern zählen. Die Gefahr einer schärferen Korrektur bleibt real, gerade für passiv aufgestellte Investoren.

In unserem neuen Spezialreport stellen wir fünf Aktien vor, die genau jetzt das Potenzial für überdurchschnittliche Renditen bieten. Stark, günstig und bislang kaum im Fokus.

Jetzt kostenlosen Report herunterladen – bevor es andere tun!

Dieses exklusive PDF ist nur für kurze Zeit gratis verfügbar.
Werbehinweise: Die Billigung des Basisprospekts durch die BaFin ist nicht als ihre Befürwortung der angebotenen Wertpapiere zu verstehen. Wir empfehlen Interessenten und potenziellen Anlegern den Basisprospekt und die Endgültigen Bedingungen zu lesen, bevor sie eine Anlageentscheidung treffen, um sich möglichst umfassend zu informieren, insbesondere über die potenziellen Risiken und Chancen des Wertpapiers. Sie sind im Begriff, ein Produkt zu erwerben, das nicht einfach ist und schwer zu verstehen sein kann.