Anzeige
Mehr »
Login
Donnerstag, 02.05.2024 Börsentäglich über 12.000 News von 685 internationalen Medien
"Special Situation"-Aktie mit Multi-Tenbagger-Potenzial im heißesten Rohstoff-Markt
Anzeige

Indizes

Kurs

%
News
24 h / 7 T
Aufrufe
7 Tage

Aktien

Kurs

%
News
24 h / 7 T
Aufrufe
7 Tage

Xetra-Orderbuch

Fonds

Kurs

%

Devisen

Kurs

%

Rohstoffe

Kurs

%

Themen

Kurs

%

Erweiterte Suche
Marketwired
162 Leser
Artikel bewerten:
(0)

Eldorado Gold Announces Drilling Update

VANCOUVER, BRITISH COLUMBIA -- (Marketwired) -- 10/23/14 -- Eldorado Gold Corporation ("Eldorado" or the "Company") (TSX: ELD)(NYSE: EGO) is pleased to announce the year-to-date results from resource drilling programs at the Company's White Mountain and Jinfeng projects in China and the Piavitsa project in Greece.

White Mountain, China

At White Mountain, over 7,500 metres of exploration drilling and over 12,400 metres of delineation drilling have been completed year-to-date. Underground drilling has targeted three areas; in all of these, the new drilling has either produced mineralized intersections outside of the current resource model, or will upgrade existing Inferred Resources for year-end 2014 calculations (see Table 1 and Figure 1).

--  In the Central Zone, drilling has extended the existing resource on the
    200 metre level, and has identified a new, deeper zone of high-grade
    mineralization downplunge of the current resource.
--  In the North Zone, high grade intercepts have been obtained in several
    areas along the margin of the existing resource model.
--  In the Northern Deeps Zone, new drillholes have encountered multiple
    high-grade zones within the previously defined Inferred Resource.

Surface drilling programs are currently testing the downdip extension of the Northern Deeps Zone, and will commence shortly on near-surface targets along strike to the southwest of the White Mountain deposit.

Jinfeng, China

At the Jinfeng operation, resource drilling programs in 2014 are directed towards converting existing Inferred Resources to Measured and Indicated Resources. Year-to-date, a total of 3,600 metres of drilling has been completed, targeting segments of the F2, F6 and F7 mineralized fault zones. Significant intercepts from this program are summarized in Table 1 below.

Table 1: Selected results, China drilling programs
(results reported restricted to intervals with greater than 10 gm x meters
Au)

White Mountain
                                                    Approx. true
Drillhole           From (m)      To (m)Interval (m)   width (m)    Au (g/t)
Central Zone
DHE325-06              124.6       129.4         4.8         4.5        5.73
DHE325-10              112.5       115.1         2.6         2.6       35.70
DHE335-05               35.2        51.3        16.1        13.2        4.95
DHE335-07               31.2        57.5        26.3        14.8        4.88
DHE335-10               39.9        69.9        30.0        20.8        1.61
DHE350-09               46.5          59        12.5        10.5        7.93
DHE350-10               43.9        57.8        13.9        11.0        7.22
North Zone
DHE335-37               77.2        87.1         9.9         8.8        5.07
DHE335-39                 82        90.5         8.5         5.0       14.13
DHE335-40               85.9        92.7         6.8         6.1        8.22
DHE335-51               88.6          92         3.4         3.2        5.47
DHE335-52               91.2        97.2         6.0         4.3        7.72
DHE365-89              199.2       220.8        21.6        16.0       11.01
DHE365-92              125.6       135.7        10.1         6.0        1.59
DHE365-94               90.6        94.6         4.0         3.9        3.67
and                      123         129         6.0         5.8        3.57
DHE365-95                 86         108          22        11.3        1.85
DHE365-107              19.2        25.7         6.5         6.4        2.87
DHE365-109             125.7       137.8        12.1        11.8        1.71
Northern Deeps Zone
DHE365-86              458.8       464.6         5.8         5.1        7.22
and                    469.8         477         7.2         6.2        3.54
DHE365-110             419.1         431        11.9        10.4       20.45
and                    446.8       456.5         9.7         8.5       10.62
DHE365-123             253.5       267.8        14.3         9.9        3.50
DHE365-112             447.2       478.7        31.5        20.7        5.09
DHE335-31               52.0        59.4         7.4         7.1        4.37


Jinfeng

                                                       Estimated
                                                      true width
Drillhole           From (m)      To (m)Interval (m)         (m)    Au (g/t)
HDDU0249                79.0       108.0        29.0        20.4        4.11
HDDU0250                61.0        91.0        30.0        28.8        2.95
HDDU0251                54.0        65.0        11.0        10.3        5.97
and                     71.0        77.0         6.0        5.35        2.30
and                     90.0        97.0         7.0         6.5        2.58
HDDU0254                32.0        47.0        15.0        14.5        2.03
HDDU0255                46.0        60.0        14.0        13.6        2.80
HDDU0255                92.0       110.0        18.0        17.1        1.28
HDDU0256                25.0        43.0        18.0        17.4        2.31
HDDU0257               205.0       210.0         5.0         5.0        2.93
HDDU0262               145.0      159.10       14.10        13.9        2.93
HDDU0263               116.0       148.0        32.0        32.0        3.05

Piavitsa, Greece

The Company has completed over 6,000 metres of exploration drilling this year at our Piavitsa project in the Halkidiki mining district, Greece. Eldorado's 2014 exploration drilling is targeting the wide data gaps within the two kilometre strike length over which the deposit has been defined, particularly in the western part of the deposit. Nearly all of the 2014 drillholes intersected mineralized intervals with grades and thicknesses similar to previous drilling, confirming continuity of mineralization within the deposit (see Table 2, Figure 2).

Table 2: Results, Piavitsa drilling

Drillhole                  From (m)       To (m)   Interval (m)     Au (g/t)
PV-137                        185.5        214.0           28.5         3.79
PV-139                        288.5        292.5            4.0         2.07
PV-140                        182.7        191.0            8.3         3.52
and                           200.0        206.0            6.0         3.72
and                           246.0        265.0           19.0         2.07
PV-141                        308.0        313.0            5.0         5.61
PV-142                        111.0        119.0            8.0         2.69
PV-143                        103.0        123.0           20.0         3.29
and                           352.0        377.0           25.0         4.16
PV-146                        412.0        459.0           47.0         2.59
and                           480.0        488.0            8.0         5.53
and                           494.0        497.0            3.0         3.80
PV-138 and PV-147                    No significant intercepts

Dr. Peter Lewis, P. Geo., Vice President, Exploration at Eldorado, is the Qualified Person for the technical disclosure in this press release. Assay results reported in this release for China were diamond drill core samples prepared at Eldorado's sample preparation facilities at the Company's Jinfeng and White Mountain mines, and assayed at the ALS Chemex facility in Guangzhou. Assay results for the Piavitsa project were diamond drill core samples prepared at Eldorado's sample preparation facility at Cannakale, Turkey and assayed at ACME Labs' laboratory in Ankara, Turkey. Certified standard reference materials, field duplicate, and blank samples were inserted prior to shipment from the preparation sites and were regularly monitored to ensure the quality of the data.

About Eldorado Gold

Eldorado is a leading low cost gold producer with mining, development and exploration operations in Turkey, China, Greece, Romania and Brazil. The Company's success to date is based on a low cost strategy, a highly skilled and dedicated workforce, safe and responsible operations, and long-term partnerships with the communities where it operates. Eldorado's common shares trade on the Toronto Stock Exchange (TSX: ELD) and the New York Stock Exchange (NYSE: EGO).

Certain of the statements made herein may contain forward-looking statements or information within the meaning of the United States Private Securities Litigation Reform Act of 1995 and applicable Canadian securities laws. Often, but not always, forward-looking statements and forward-looking information can be identified by the use of words such as "plans", "expects", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates", or "believes" or the negatives thereof or variations of such words and phrases or statements that certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved. Forward-looking statements or information herein include, but are not limited to, statements or information with respect to the drilling results at Jinfeng, White Mountain and Piavitsa.

Forward-looking statements and forward-looking information by their nature are based on assumptions and involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements or information. We have made certain assumptions about the forward-looking statements and information, including assumptions about the legal restrictions regarding the payment of dividends by the Company; assumptions about the price of gold; anticipated costs and expenditures; estimated production, mineral reserves and metallurgical recoveries; financial position, reserves and resources and gold production; and the ability to achieve our goals. Although our management believes that the assumptions made and the expectations represented by such statements or information are reasonable, there can be no assurance that the forward-looking statements or information will prove to be accurate. Furthermore, should one or more of the risks, uncertainties or other factors materialize, or should underlying assumptions prove incorrect, actual results may vary materially from those described in forward-looking statements or information. These risks, uncertainties and other factors include, among others, the following: gold price volatility; risks of not meeting production and cost targets; discrepancies between actual and estimated production, mineral reserves and resources and metallurgical recoveries; mining operational and development risk; litigation risks; regulatory restrictions, including environmental regulatory restrictions and liability; risks of sovereign investment and operating in foreign countries; currency fluctuations; speculative nature of gold exploration; global economic climate; dilution; share price volatility; competition; loss of key employees; additional funding requirements; and defective title to mineral claims or property, as well as those factors discussed in the sections entitled "Forward-Looking Statements" and "Risk Factors" in the Company's Annual Information Form & Form 40-F dated March 28, 2014

There can be no assurance that forward-looking statements or information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, you should not place undue reliance on the forward-looking statements or information contained herein. Except as required by law, we do not expect to update forward-looking statements and information continually as conditions change and you are referred to the full discussion of the Company's business contained in the Company's reports filed with the securities regulatory authorities in Canada and the U.S.

To view the figures associated with this press release, please visit the following link: http://media3.marketwire.com/docs/ELD-102314-figs.pdf

Contacts:
Eldorado Gold Corporation
Krista Muhr
Vice President Investor Relations
604 601 6701 or 1 888 353 8166
kristam@eldoradogold.com
www.eldoradogold.com

Lithium vs. Palladium - Zwei Rohstoff-Chancen traden
In diesem kostenfreien PDF-Report zeigt Experte Carsten Stork interessante Hintergründe zu den beiden Rohstoffen inkl. . Zudem gibt er Ihnen konkrete Produkte zum Nachhandeln an die Hand, inkl. WKNs.
Hier klicken
© 2014 Marketwired
Werbehinweise: Die Billigung des Basisprospekts durch die BaFin ist nicht als ihre Befürwortung der angebotenen Wertpapiere zu verstehen. Wir empfehlen Interessenten und potenziellen Anlegern den Basisprospekt und die Endgültigen Bedingungen zu lesen, bevor sie eine Anlageentscheidung treffen, um sich möglichst umfassend zu informieren, insbesondere über die potenziellen Risiken und Chancen des Wertpapiers. Sie sind im Begriff, ein Produkt zu erwerben, das nicht einfach ist und schwer zu verstehen sein kann.