Anzeige
Mehr »
Login
Dienstag, 23.04.2024 Börsentäglich über 12.000 News von 688 internationalen Medien
Breaking News: InnoCan startet in eine neue Ära – FDA Zulassung!
Anzeige

Indizes

Kurs

%
News
24 h / 7 T
Aufrufe
7 Tage

Aktien

Kurs

%
News
24 h / 7 T
Aufrufe
7 Tage

Xetra-Orderbuch

Fonds

Kurs

%

Devisen

Kurs

%

Rohstoffe

Kurs

%

Themen

Kurs

%

Erweiterte Suche
ACCESSWIRE
381 Leser
Artikel bewerten:
(1)

Vanadium One Iron Corp.: Vanadium One Completes Drill Program at Its Mont Sorcier, Quebec Iron Ore-Vanadium Project

  • Program designed to significantly increase tonnage

TORONTO, ON / ACCESSWIRE / November 2, 2020 / Vanadium One Iron Corp. ("Vanadium One" or the "Company") (TSXV:VONE) is pleased to provide an update on the status of its previously announced 2020 drill program at its Mont Sorcier iron and vanadium project, located just outside of Chibougamau, Quebec. The program was designed to expand the current resource at Mont Sorcier to produce a new Mineral Resource estimate, which is planned for Q1 2021.

We are pleased to announce that the diamond drilling component of the program has been completed ahead of schedule with 10 holes drilled for a total of 3,414 metres, instead of the planned 9 holes drilled with a total of 3,500 meters. Drilling targeted the eastern extension of the North Zone and covered more than 1.5 kilometers along strike as planned. Efficient execution of the program allowed the company to add a drill hole (MSN-20-14) to the west of the current North Zone Mineral Resource, adding a deeper down dip projection to known mineralization. Drilling reports indicate that the intersection of the ultramafic host rocks occurred in line with expectations based on historical magnetic surveys and surface geological mapping.

List of Drill Holes Completed

Hole Name

Easting

Northing

Elevation

Azimuth

Dip

Length

MSN-20-05

564,708

5,529,711

434

180

-45

249

MSN-20-06

564,708

5,529,711

434

180

-60

264

MSN-20-07

564,400

5,529,640

480

180

-45

189

MSN-20-08

564,290

5,529,625

475

200

-50

315

MSN-20-09

565,000

5,529,790

403

180

-55

225

MSN-20-10

565,305

5,529,907

395

180

-45

228

MSN-20-11

564,091

5,529,153

393

0

-45

498

MSN-20-12

563,677

5,529,110

423

0

-45

534

MSN-20-13

565,476

5,530,040

398

180

-45

312

MSN-20-14

562,614

5,529,973

415

180

-45

600

Total

3,414

With drilling, core logging and sampling complete, the Company is awaiting the initial results from assaying and Davis Tube analysis to determine magnetite content and the vanadium and iron grades of in-situ material as well as of magnetite concentrates. Initial results are expected in the coming weeks. The drill program and associated work is based in part on the recommendations suggested in the Technical Report entitled "NI 43-101 Technical Report - Preliminary Economic Assessment (PEA) of the Mont Sorcier Project, Province of Quebec, Canada" (available on SEDAR and Vanadium One's website: www.vanadiumone.com). The results from this field work will be used to update the Mineral Resource estimate published in April 2019 as outlined below:

Mineral Resource Estimate1 at Mont Sorcier Using a Cut-off Grade2 of 14% Fe, effective 23 April 2019 (https://www.vanadiumone.com/news/2019/Indicated-Resource-of-113.5-Million-Tonnes.pdf).

Zone

Category4, 5

Tonnage

Head grade

Grade in concentrate

Rock
(Mt)

Concentrate
(Mt)

Fe
(%)

Magnetite
(%)

Fe
(%)

V2O5
(%)

Al2O3
(%)

TiO2
(%)

MgO
(%)

SiO2
(%)

South

Indicated

113.5

35.0

22.7

30.9

65.3

0.6

0.3

1.2

3.8

2.8

Inferred

144.6

36.1

20.2

24.9

66.9

0.5

0.4

1.0

3.4

2.5

North

Inferred

376.0

142.2

27.4

37.8

63.7

0.6

1.0

1.8

3.5

4.2

Total

Indicated

113.5

35.0

22.7

30.9

65.3

0.6

0.3

1.2

3.8

2.8

Inferred

520.6

178.3

25.4

34.2

64.4

0.6

0.8

1.7

3.5

3.9

1 Numbers have been rounded to reflect the precision of Inferred and Indicated Mineral Resource estimates.

2 The reporting cut-off was calculated for a magnetite concentrate containing 65% Fe with price of $US 90/t of dry concentrate, 50% of the price of V2O5 contained in the concentrate, a V2O5 price of $US 14/lb, a minimum of 0.2 % of V2O5 contained in the concentrate, an open pit mining operation, a cost of mining and milling feed mineralization of USD 13.80/t, a cost of transporting concentrate of USD 40/t; and a cost of tailing disposal of USD 1.5/t.

3 Vanadium One is not aware of any environmental, permitting, legal, title, taxation, socio-economic, marketing or political factors that might materially affect these mineral resource estimates.

4 Resource classification, as defined by the Canadian Institute of Mining, Metallurgy and Petroleum in their document "CIM Definition Standards for Mineral Resources and Mineral Reserves" of May 10, 2014.

5 Mineral Resources are not Mineral Reserves and by definition do not demonstrate economic viability. This MRE includes inferred Mineral Resources that are normally considered too speculative geologically to have economic considerations applied to them that would enable them to be categorized as Mineral Reserves. It is reasonably expected that the majority of Inferred Mineral Resources could be upgraded to Indicated Mineral Resources with continued exploration.

Cliff Hale-Sanders, President and CEO of Vanadium One Iron commented "We are very pleased to have completed the drill program at Mont Sorcier in a timely manner and expect further updates in the near future to continue to highlight the potential offered at Mont Sorcier. We believe an expanded resource base in conjunction with the robust economics outlined in the PEA earlier this year, underscore the potential we see in moving Mont Sorcier forward into a long life, highly profitable iron and vanadium mine."

The drill results are expected to provide further support to the outcomes of the PEA as outlined in the Technical Report entitled "NI 43-101 Technical Report - Preliminary Economic Assessment (PEA) of the Mont Sorcier Project, Province of Quebec, Canada". The report was completed by CSA Global Consultants Canada Ltd, an ERM Company (CSA Global) and has an effective date of February 27, 2020 - see https://www.vanadiumone.com/news/2020/VONE-NR-PEA.pdf. The report was prepared in accordance with Canadian Securities Administrators' National Instrument 43-101 ("NI 43-101") Standards of Disclosure for Mineral Projects.

The Technical Report is available for review under the Company's profile on SEDAR and on the Company's website.

Qualified Persons Statements

The technical information contained in this news release has been reviewed and approved by Pierre-Jean Lafleur, P.Eng. (OIQ), who is a Qualified Person with respect to the Company's Mont Sorcier Project as defined under National Instrument 43-101.

About Vanadium One Iron Corp.:

Vanadium One Iron Corp. is a mineral exploration company headquartered in Toronto, Canada. The Company is focused on advancing its Mont Sorcier, Vanadium-rich, Magnetite Iron Ore Project, in Chibougamau, Quebec.

NOT FOR DISTRUBITION TO UNITED STATES NEWSWIRE SERVICES OR
FOR DISSEMINATION IN THE UNITED STATES

ON BEHALF OF THE BOARD OF DIRECTORS OF VANADIUM ONE IRON CORP.

Cliff Hale-Sanders, President & CEO
Tel: 416-819-8558
csanders@vanadiumone.com
www.vanadiumone.com

Cautionary Note Regarding Forward-Looking Statements:

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

This news release contains "forward-looking information" including statements with respect to the future exploration performance of the Company. This forward-looking information involves known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any future results, performance or achievements of the Company, expressed or implied by such forward-looking statements. These risks, as well as others, are disclosed within the Company's filing on SEDAR, which investors are encouraged to review prior to any transaction involving the securities of the Company. Forward-looking information contained herein is provided as of the date of this news release and the Company disclaims any obligation, other than as required by law, to update any forward-looking information for any reason. There can be no assurance that forward-looking information will prove to be accurate and the reader is cautioned not to place undue reliance on such forward-looking information.

SOURCE: Vanadium One Iron Corp.



View source version on accesswire.com:
https://www.accesswire.com/613681/Vanadium-One-Completes-Drill-Program-at-Its-Mont-Sorcier-Quebec-Iron-Ore-Vanadium-Project

Großer Insider-Report 2024 von Dr. Dennis Riedl
Wenn Insider handeln, sollten Sie aufmerksam werden. In diesem kostenlosen Report erfahren Sie, welche Aktien Sie im Moment im Blick behalten und von welchen Sie lieber die Finger lassen sollten.
Hier klicken
© 2020 ACCESSWIRE
Werbehinweise: Die Billigung des Basisprospekts durch die BaFin ist nicht als ihre Befürwortung der angebotenen Wertpapiere zu verstehen. Wir empfehlen Interessenten und potenziellen Anlegern den Basisprospekt und die Endgültigen Bedingungen zu lesen, bevor sie eine Anlageentscheidung treffen, um sich möglichst umfassend zu informieren, insbesondere über die potenziellen Risiken und Chancen des Wertpapiers. Sie sind im Begriff, ein Produkt zu erwerben, das nicht einfach ist und schwer zu verstehen sein kann.