The projects, equivalent to 1.88 GW of electrolyzer capacity, were withdrawn after choosing not to continue with the agreement procedure or for being unable to provide a signed completion guarantee. As a result, ten hydrogen projects representing 774 MW in capacity from the reserve list have been invited to prepare grant agreements.The European Commission has confirmed that seven of the 15 projects selected for grants under the European Hydrogen Bank's second auction round have been withdrawn from the subsidy scheme. The seven projects make up 1.88 GW of new electrolyzer capacity, representing ...Den vollständigen Artikel lesen ...
© 2025 pv magazine