Anzeige
Mehr »
Donnerstag, 04.12.2025 - Börsentäglich über 12.000 News
Einmalige Investmentchancen in den potenziellen Gamechanger der Krebsbehandlung
Anzeige

Indizes

Kurs

%
News
24 h / 7 T
Aufrufe
7 Tage

Aktien

Kurs

%
News
24 h / 7 T
Aufrufe
7 Tage

Xetra-Orderbuch

Fonds

Kurs

%

Devisen

Kurs

%

Rohstoffe

Kurs

%

Themen

Kurs

%

Erweiterte Suche

WKN: A143D6 | ISIN: US8522341036 | Ticker-Symbol: SQ3
Tradegate
04.12.25 | 10:56
52,45 Euro
+0,13 % +0,07
Branche
Software
Aktienmarkt
S&P 500
1-Jahres-Chart
BLOCK INC Chart 1 Jahr
5-Tage-Chart
BLOCK INC 5-Tage-Chart
RealtimeGeldBriefZeit
52,4552,6610:57
52,4552,6210:57
GlobeNewswire (Europe)
68 Leser
Artikel bewerten:
(0)

Amaroq Ltd.: Successful 2025 Nalunaq gold mine drilling programme - 1,840 g/t of gold over 0.5m in Mountain Block derisks near-term production and expansion of the Main Vein at depth

Reykjavík, Dec. 04, 2025 (GLOBE NEWSWIRE) -- Amaroq Ltd.
("Amaroq" or the "Company")

Successful 2025 Nalunaq gold mine drilling programme - 1,840 g/t of gold over 0.5m1 in Mountain Block derisks near-term production and expansion of the Main Vein at depth

TORONTO, ONTARIO - 04 December 2025 - Amaroq Ltd. (AIM, TSX-V, NASDAQ Iceland: AMRQ, OTCQX: AMRQF), an independent mine development corporation focused on unlocking Greenland's mineral potential, is pleased to announce results from the 2025 resource and exploration drilling at the Nalunaq gold mine, as well as an update to exploration activities.

James Gilbertson, VP Exploration of Amaroq, commented:
"I am very pleased to announce the 2025 exploration results at Nalunaq, which as well as confirming additional high-grade intersections, continue to strengthen our understanding of the deposit? derisking near-term production and providing the geological confidence required to continue sustained mining activities. The confirmation of the Main Vein extension down-dip is also a key step in refining our exploration model and highlights the potential for further expansion beyond the areas drilled to date.

"These results further validate Amaroq's strategy to target gold expansion within our portfolio and reinforce our belief in the long-term resource growth potential at Nalunaq. Our 2025 exploration campaign included targets across the identified southern Greenland gold belt which also contains the Nanoq project, on which we will be reporting results before the end of the year."

Highlights from the successful 2025 exploration programme

Core Drilling

  • 2,127m of underground resource conversion drilling successfully completed within Nalunaq, including significant intersections of gold up to 1,840 g/t Au over 0.5 m2-
  • 62% of this drilling intersected mineralised Main Vein with a weighted average grade of 87.6g/t Au, verifying higher grades than the resource model predicted
  • These results considerably derisk near term production and provides additional confidence in the high-grade nature of the Mountain Block - the site of current Nalunaq mining operations.
  • 4,166.5m of surface drilling has discovered that the Main Vein structure extends approximately 700m down-dip of previously mined areas, into the targeted South Deeps area.
  • Although grades from the initial four holes are lower than in Mountain Block, the newly confirmed Main Vein down-dip extension represents significant additional future upside potential, beyond the Company's previously reported Exploration Target3-
  • All 2025 drilling results will be incorporated into an updated geological model ahead of the planned Mineral Resource Estimate update ("MRE5") in Q1 2026, which will allow for resource conversion from the Inferred to Indicated categories where relevant.

Ongoing exploration activities

  • Underground exploration of the development levels into the western areas is continuing, evaluating potential further extensions of the Mountain Block mineral corridor.
  • Surface drilling programme expanded to follow up on the Main Vein down-dip extension and to connect this area back toward the existing Mineral Resource.

The accompanying presentation on the Nalunaq 2025 exploration results, as well as the PDF version of this release, are available on our website at the link below: https://www.amaroqminerals.com/investors/presentations/

Background to the Exploration Strategy at the Nalunaq Mine

Nalunaq is an underground gold mine where mineralisation (hosted in the Main Vein) occurs in four key zones, known as the Mountain, Target, South and Valley Blocks. Mining is currently active in the Mountain Block, while Amaroq is evaluating opportunities for resource growth across the other blocks and in additional target areas such as South Deeps and the Welcome Block.

Nalunaq is characterised by high grades that are variably distributed over short distances (the "nugget effect"). As a result, past surface drilling often understated the gold content later confirmed by underground development and mining. Over recent years, Amaroq's technical team has strengthened its understanding of the deposit through detailed geological work, including the development of the bespoke Dolerite Dyke Model, which has improved the effectiveness of drilling targeting from surface, looking to counterbalance the "nugget effect", in order to achieve more consistent drilling results.

Amaroq uses a three-stage approach to build confidence in the Nalunaq deposit. Surface drilling is used to locate the Main Vein structure, further surface and underground infill drilling provides the closer-spaced information needed for mine planning, and tunnelling on the vein allows the Company to compare drill results with the gold actually mined. In this way the Company has established a current Mineral Resource of 158 koz (151.5Kt @ 32.4g/t Au) Indicated and 326 koz (348Kt @ 29.2g/t Au) Inferred4 and has outlined a further Exploration Target of ~ between 600,000 tonnes and 2.3 million tonnes at between 10-30 g/t Au, in areas that remain underexplored. In parallel with ongoing mining, and with the increased understanding of the mineralisation characteristics, Amaroq is advancing both underground and surface drilling to improve the ability to exploit the high-grade areas near existing workings and to test the broader potential for resource growth across the Nalunaq deposit over and above the current Exploration target5-

Drilling Programmes
Exploration drilling activities at Nalunaq in 2025, comprised both underground and surface diamond drilling. The underground programme continued to focus on resource definition and conversion within the Mountain Block, while surface drilling targeted growth potential at depth, specifically testing for down-dip and under-cover extensions of the Main Vein system. Together, these programmes are designed to progressively derisk near-term mining operations while opening up new areas for long-term resource growth.

Underground Resource Definition and Conversion Drilling
A total of 2,126.9 metres from 29 underground holes were completed as part of the 2025 resource definition and conversion programme in the Mountain Block. Drilling was focused on enhancing confidence in existing development areas ahead of near-term mining, assisting in the conversion of Inferred resources to the Indicated category, and providing improved definition of high-grade domains within the Main Vein.

While the programme was primarily targeted at the Main Vein, several drillholes were extended to intersect the 75 Vein, enabling the Company to build an improved understanding of this secondary structure ahead of future dedicated drilling.

Drilling was executed in fan patterns from established underground drill bays, providing broad coverage of the Mountain Block. Results continue to demonstrate that the eastern portion of the block remains the most predictable and highest grade. However, this year's programme also highlights increasing potential towards the west, suggesting that the mineralised envelope may be more extensive than previously defined.

All 2025 drilling, together with underground face and channel samples, will be incorporated into an updated geological model ahead of the next Mineral Resource Estimate ("MRE5"), planned for Q1 2026.

Surface Resource Expansion Drilling
A surface drilling programme was initiated from the Nalunaq valley floor during the summer of 2025, consisting of seven scout holes designed to test the position and extent of the Main Vein under glacial and talus cover. These initial holes targeted the structure at depths approximately 700 metres down-dip from the historical mine working, significantly outside previously tested areas.

Results from the first four drillholes confirmed the presence of the Main Vein hosting structure at the predicted stratigraphic and structural level. This confirmation provides compelling evidence that the Main Vein continues significantly farther down-dip and under cover than previously modelled.

Importantly, this new extension potential is in addition to the Company's previously reported Exploration Target6, underscoring significant potential for further growth at Nalunaq beyond existing exploration scenarios.

Following these encouraging results, the surface drilling programme has been expanded by approximately 5,700m and is now progressing up-dip toward the mine. The objective is to define the continuity, geometry, and grade potential as well as defined potential high-grade corridors to support targeted resource drilling in 2026.
The drilling also intersected the basal fault as predicted, confirming its location and supporting the interpretation that it represents a key control on Main Vein displacement. This information will be integrated into broader district-scale geological models, including consideration of the newly identified adjacent mineralisation at Napasorsuaq (3.58 g/t Au and 0.54% Cu; as announced on 28 October 2025).

Ongoing Exploration Activities

Results up to and including holes NAL-UG-2027 (underground) and NALS-2504 (surface) are included in this release. Drilling will continue through the winter season, focusing on both resource conversion and further surface testing to derisk mine planning and expand the known mineralised envelope.

In addition to drilling, Amaroq has been advancing a westward exploration drive on level 768, aimed at assessing the potential to broaden the Mountain Block mineral corridor. This integrated strategy; combining in-mine resource definition, resource conversion, and systematic exploration; is central to unlocking the full long-term potential of the Nalunaq deposit.

Drilling Details

Table 1: 2025 Underground Drill Location

Hole IDXYZAzimuthDipTotal Depth (m)
NAL-UG-2501*50835066916047322155565.7
NAL-UG-2502*50834966916047312405079
NAL-UG-250350835066916037311714850.4
NAL-UG-250450834966916037322506589
NAL-UG-250550829066915537391777349.3
NAL-UG-250650829066915537381764037.5
NAL-UG-25075082366691563764185070.5
NAL-UG-25085082366691563764175-1085.3
NAL-UG-25095082366691563764150-1271.5
NAL-UG-251050823666915637641400137.4
NAL-UG-2511508236669156376416025158.5
NAL-UG-251250823666915637641902050.3
NAL-UG-251350823666915637642153548.5
NAL-UG-251450823666915637641456035.6
NAL-UG-251550823666915637642202069.1
NAL-UG-251650823666915637641904540.6
NAL-UG-2516A508236669156376415031137
NAL-UG-251750823666915637642258045
NAL-UG-2517A50823666915637642001360.7
NAL-UG-25185081976691603788908234
NAL-UG-251950819766916037881607261
NAL-UG-252050819766916037881653020.2
NAL-UG-2521508205669160079013035139
NAL-UG-252250820866916017891102554
NAL-UG-2523508204669160079213050129.5
NAL-UG-252450820266915997881931077.3
NAL-UG-252550819766916037881651562
NAL-UG-252650820266916007881821365
NAL-UG-252750820166915997881997104

Projection: WGS84 UTM zone 23N

* Previously reported as part of the Company's February 27, 2025 release

Table 2: 2025 Surface Drill Location

Hole IDXYZAzimuthDip Total Depth (m)
NAL-S-25015096446691328243090501
NAL-S-2502509644669132824335070497.5
NAL-S-25035097166691126255090509
NAL-S-2504509716669112625530075518
NAL-S-2505*509716669112625530060500
NAL-S-2506*509748.26691529263.803730090500
NAL-S-2507*509748.26691529263.803730065500
NAL-S-2508*509470.36691391238.1686090218
NAL-S-2509*509470.36691391238.1686052223
NAL-S-2510*509470.36691391238.168633071200

Projection: WGS84 UTM zone 23N

* Results not yet available

Table 2: Significant Underground Intersections

Hole IDFrom (m)To (m)Interval (m)Au (g/t)Method
NAL-UG-250150.6851.170.4949.4Screen Fire Assay
NAL-UG-250151.1751.670.518.85Fire Assay
NAL-UG-250154.454.90.517.15Screen Fire Assay
NAL-UG-250266.3766.90.5333.3Fire Assay
NAL-UG-250266.967.410.5114.05Fire Assay
NAL-UG-250267.4167.910.561Fire Assay
NAL-UG-250267.9168.470.561.11Fire Assay
NAL-UG-250340.5441.040.541.3Fire Assay
NAL-UG-250463.664.130.5398.2Screen Fire Assay
NAL-UG-250469.9770.020.052.15Fire Assay
NAL-UG-250524.825.30.51,840Screen Fire Assay
NAL-UG-250527.427.90.52.18Fire Assay
NAL-UG-250527.928.40.52.25Fire Assay
NAL-UG-250623.5240.58.38Fire Assay
NAL-UG-250624.5250.532.9Fire Assay
NAL-UG-250625.526.220.726.81Fire Assay
NAL-UG-250878.3778.870.51.16Fire Assay
NAL-UG-251039.5840.160.583.87Fire Assay
NAL-UG-25106868.60.6696Aqua Regia
NAL-UG-25113030.50.55.92Fire Assay
NAL-UG-251174.575.40.91.88Screen Fire Assay
NAL-UG-251235.7536.250.542.2Fire Assay
NAL-UG-251236.7537.650.91.34Fire Assay
NAL-UG-2516A26.7627.260.56.86Aqua Regia
NAL-UG-251747.2548.2515.43Aqua Regia
NAL-UG-251749.5500.51.23Aqua Regia
NAL-UG-2517A505111.74Aqua Regia
NAL-UG-2517A5151.50.57.16Aqua Regia
NAL-UG-2517A5252.50.51.35Aqua Regia
NAL-UG-251951.0551.550.592.9Aqua Regia
NAL-UG-252139.6840.220.5475.5Aqua Regia
NAL-UG-252240.2241.120.91.07Aqua Regia
NAL-UG-252340.5541.050.532.8Aqua Regia
NAL-UG-252549.5500.59.4Aqua Regia

# True thickness estimated to be 50-95% of apparent thickness

Table 2: Anomalous Surface Dilling Intersections

Hole IDFrom (m)To (m)Interval (m)Au (g/t)
NAL-S-2501204.52050.50.62
NAL-S-2501205205.60.60.53
NAL-S-2501233.3233.80.50.34
NAL-S-2501426.55427.450.90.35
NAL-S-2502228.12228.80.680.47
NAL-S-2503395.4395.90.50.9
NAL-S-2503468.32468.820.50.39
NAL-S-2503501.15501.650.50.45
NAL-S-2504237.21237.710.50.46

# True thickness estimated to be 50-95% of apparent thickness

Sampling and QAQC Disclosure

Underground Core Drilling
NQ drill core is whole core sampled across selected intervals. Samples were placed into thick polymer bags with a unique numbered sample ticket. All samples were prepared at ALS Geochemistry's containerised preparation laboratory at Nalunaq mine, before being packaged and shipped to ALS Loughrea for analysis. Later samples were also sent for assaying within the newly commissioned onsite assaying facility.

Surface Core Drilling
NQ drill core was cut in half using a diamond blade core saw. Core was selectively sampled and cut-lines were consistently drawn 5 degrees below the orientation line (if present), otherwise along the core foliation axis and the right-hand side of the core was sampled. Samples were placed into thick polymer bags with a unique numbered sample ticket. All samples were prepared at ALS Geochemistry's containerised preparation laboratory at Nalunaq mine, before being packaged and shipped to ALS Loughrea for analysis.

Sample preparation scheme PREP-31BY was used on all samples. This involves crushing to 70% under 2 mm, rotary splitting off 1 kg, and pulverizing the split to better than 85% passing 75 microns. Samples were then analysed by 50 g fire assay with method Au-AA26 which has a detection limit of 0.01 ppm Au. Samples containing visible gold were assayed with screen-metallics fire assay technique Au-SCR24 which has a detection limit of 0.05 ppm Au. This involves screening 1 kg of pulverised sample to 106 microns followed by a gravimetric assay of the entire plus fraction and a duplicate 50 g AAS assay of the minus fraction.

As for October 2025, Amaroq has commissioned an onsite Aqua Regia assaying laboratory managed and administered by ALS Geochemistry. The sample preparation of these samples is identical as with the fire or screen fire assaying. Following this, the sample is digested in a mixture of 3 parts hydrochloric acid and 1 part of nitric acid (aqua regia). This acid mixture generates nascent chlorine and nitrosyl chloride, which will dissolve free gold and gold compounds such as calaverite, AuTe2.

Samples must be finely pulverised to ensure that the gold particles are liberated from the gangue and able to react with the acid.

The dissolved gold is complexed and extracted into an organic solvent. Finally, the gold is determined by flame AAS.

Amaroq's QA/QC programme consists of the systematic insertion of certified reference materials of known gold content, coarse blanks, and prep duplicates (coarse and pulp) at a rate of 1 in 20 or 5% per QA/QC type. In addition, ALS insert blanks and standards into the analytical process. No QAQC issues were noted with the results reported herein.

Enquiries:
Amaroq Ltd. C/O
Ed Westropp, Head of BD and Corporate Affairs
+44 (0)7385 755711
ewe@amaroqminerals.com

Eddie Wyvill, Corporate Development
+44 (0)7713 126727
ew@amaroqminerals.com

Panmure Liberum Limited (Nominated Adviser and Corporate Broker)
Scott Mathieson
Freddie Wooding
+44 (0) 20 7886 2500

Canaccord Genuity Limited (Corporate Broker)
James Asensio
Harry Rees
+44 (0) 20 7523 8000

Camarco (Financial PR)
Billy Clegg
Elfie Kent
Fergus Young
+44 (0) 20 3757 4980

Further Information:
About Amaroq

Amaroq's principal business objectives are the identification, acquisition, exploration, and development of gold and strategic metal properties in South Greenland. The Company's principal asset is a 100% interest in the Nalunaq Gold mine. The Company has a portfolio of gold and strategic metal assets in Southern Greenland covering the two known gold belts in the region as well as advanced exploration projects at Stendalen and the Sava Copper Belt exploring for Strategic metals such as Copper, Nickel, Rare Earths and other minerals. Amaroq is continued under the Business Corporations Act (Ontario) and wholly owns Nalunaq A/S, incorporated under the Greenland Companies Act.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Forward-Looking Information
This press release contains forward-looking information within the meaning of applicable securities legislation, which reflects the Corporation's current expectations regarding future events and the future growth of the Corporation's business. In this press release there is forward-looking information based on a number of assumptions and subject to a number of risks and uncertainties, many of which are beyond the Corporation's control, that could cause actual results and events to differ materially from those that are disclosed in or implied by such forward-looking information. Such risks and uncertainties include but are not limited to the factors discussed under "Risk Factors" in the Final Prospectus available under the Corporation's profile on SEDAR at www.sedar.com. Any forward-looking information included in this press release is based only on information currently available to the Corporation and speaks only as of the date on which it is made. Except as required by applicable securities laws, the Corporation assumes no obligation to update or revise any forward-looking information to reflect new circumstances or events. No securities regulatory authority has either approved or disapproved of the contents of this press release. Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Inside Information
This announcement contains information for the purposes of Article 7 of the UK version of Regulation (EU) No. 596/2014 on Market Abuse ("UK MAR"), as it forms part of UK domestic law by virtue of the European Union (Withdrawal) Act 2018, and Regulation (EU) No. 596/2014 on Market Abuse ("EU MAR").

Qualified Person Statement
The technical information presented in this press release has been approved by James Gilbertson CGeol, VP Exploration for Amaroq and a Chartered Geologist with the Geological Society of London, and as such a Qualified Person as defined by NI 43-101.

Mr. Gilbertson has reviewed and approved the scientific and technical information contained in this news release. Specifically, Mr Gilbertson has reviewed the sampling and analytical procedures described and considers the data to be reliable for the purpose of this disclosure.

Glossary

Augold
ggrams
g/tgrams per tonne
kmkilometres
kozthousand ounces
mmeters
MRE3Mineral Resource Estimate 2022
MRE4Mineral Resource Estimate 2024
ozounces
ttonnes
t/m3tonne per cubic meter
USD/ozAuUS Dollar per ounce of gold

1 From 24.8 to 25.3m in hole NAL-UG-2505
2 From 24.8 to 25.3m in hole NAL-UG-2505
3 Exploration target at Nalunaq of between 600,000 tonnes and 2.3 million tonnes at between 10-30 g/t Au, based low density drilling and channel sampling. The potential quantity and grade is conceptual in nature, that there has been insufficient exploration to define a mineral resource and that it is uncertain if further exploration will result in the target being delineated as a mineral resource
4 Technical Report on the Updated Mineral Resource Estimate (MRE4) of the Nalunaq Gold Mine, Greenland; Bara Consulting (UK) Ltd, 19 May 2025
5 Exploration target at Nalunaq of between 600,000 tonnes and 2.3 million tonnes at between 10-30 g/t Au, based low density drilling and channel sampling. The potential quantity and grade is conceptual in nature, that there has been insufficient exploration to define a mineral resource and that it is uncertain if further exploration will result in the target being delineated as a mineral resource
6 Exploration target at Nalunaq of between 600,000 tonnes and 2.3 million tonnes at between 10-30 g/t Au, based low density drilling and channel sampling. The potential quantity and grade is conceptual in nature, that there has been insufficient exploration to define a mineral resource and that it is uncertain if further exploration will result in the target being delineated as a mineral resource


© 2025 GlobeNewswire (Europe)
Werbehinweise: Die Billigung des Basisprospekts durch die BaFin ist nicht als ihre Befürwortung der angebotenen Wertpapiere zu verstehen. Wir empfehlen Interessenten und potenziellen Anlegern den Basisprospekt und die Endgültigen Bedingungen zu lesen, bevor sie eine Anlageentscheidung treffen, um sich möglichst umfassend zu informieren, insbesondere über die potenziellen Risiken und Chancen des Wertpapiers. Sie sind im Begriff, ein Produkt zu erwerben, das nicht einfach ist und schwer zu verstehen sein kann.